|
|
PREP ROW (TREE PRUNING)
|
EA
|
1.000
|
$1,500.000
|
$7,442.190
|
$7,000.000
|
$15,000.000
|
$5,000.000
|
$11,950.000
|
$7,500.000
|
|
|
REMOVING CONC (RIPRAP)
|
CY
|
6.200
|
$500.000
|
$77.000
|
$180.000
|
$300.000
|
$355.960
|
$700.000
|
$122.310
|
|
|
REMOVING CONC (MEDIANS)
|
SY
|
805.000
|
$20.000
|
$33.000
|
$52.000
|
$54.000
|
$18.290
|
$28.000
|
$18.180
|
|
|
REMOVING CONC (CURB)
|
LF
|
129.000
|
$50.000
|
$22.000
|
$19.000
|
$20.000
|
$57.090
|
$14.000
|
$9.580
|
|
|
REMOVING STAB BASE & ASPH PAV (8"-10")
|
SY
|
416.000
|
$20.000
|
$49.500
|
$24.000
|
$25.000
|
$17.350
|
$20.600
|
$17.570
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
20.000
|
$50.000
|
$44.000
|
$500.000
|
$185.000
|
$136.780
|
$289.000
|
$54.850
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
20.000
|
$100.000
|
$132.000
|
$500.000
|
$300.000
|
$109.230
|
$289.000
|
$103.090
|
|
|
BACKFILL (TY A)
|
STA
|
22.000
|
$125.000
|
$785.870
|
$350.000
|
$400.000
|
$357.070
|
$253.000
|
$414.530
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
394.000
|
$20.000
|
$12.650
|
$23.000
|
$10.000
|
$40.090
|
$9.200
|
$13.070
|
|
|
BLOCK SODDING
|
SY
|
394.000
|
$25.000
|
$14.300
|
$17.000
|
$10.000
|
$10.210
|
$9.700
|
$9.700
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
197.000
|
$2.000
|
$8.800
|
$12.000
|
$0.750
|
$0.550
|
$0.500
|
$0.500
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
197.000
|
$2.000
|
$8.800
|
$12.000
|
$0.750
|
$0.550
|
$0.500
|
$0.500
|
|
|
VEGETATIVE WATERING
|
MG
|
14.000
|
$50.000
|
$173.800
|
$500.000
|
$80.000
|
$105.210
|
$41.400
|
$35.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY A)
|
SY
|
394.000
|
$5.000
|
$49.500
|
$7.000
|
$6.500
|
$6.290
|
$6.000
|
$6.000
|
|
|
PROOF ROLLING
|
HR
|
100.000
|
$120.000
|
$100.000
|
$200.000
|
$115.000
|
$218.400
|
$144.000
|
$90.520
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
33,115.000
|
$75.000
|
$54.490
|
$56.000
|
$56.400
|
$61.500
|
$72.250
|
$65.000
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
50,477.000
|
$2.500
|
$2.120
|
$1.800
|
$1.750
|
$2.180
|
$2.200
|
$5.000
|
|
|
CONC STR REPAIR(CLEAN & COAT WTH EPOXY)
|
SF
|
2.000
|
$500.000
|
$550.000
|
$500.000
|
$500.000
|
$500.000
|
$500.000
|
$389.000
|
|
|
CONC STR REPAIR (STANDARD)
|
SF
|
36.000
|
$1,000.000
|
$137.500
|
$500.000
|
$500.000
|
$131.530
|
$125.000
|
$324.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
12.900
|
$1,000.000
|
$951.500
|
$700.000
|
$700.000
|
$1,038.500
|
$782.990
|
$735.340
|
|
|
CLEANING EXISTING JOINTS
|
LF
|
528.000
|
$10.000
|
$8.800
|
$10.300
|
$8.250
|
$8.420
|
$8.000
|
$57.950
|
|
|
RETROFIT RAIL (TY T131RC)
|
LF
|
662.200
|
$300.000
|
$267.850
|
$270.000
|
$275.000
|
$257.510
|
$360.000
|
$450.000
|
|
|
HEADER TYPE EXPANSION JOINT
|
CF
|
110.000
|
$400.000
|
$357.500
|
$500.000
|
$350.000
|
$342.000
|
$325.000
|
$440.000
|
|
|
JOINT SEALANT
|
LF
|
528.000
|
$15.000
|
$17.600
|
$20.000
|
$16.500
|
$16.850
|
$16.000
|
$15.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
3.000
|
$10,000.000
|
$3,850.000
|
$6,600.000
|
$8,500.000
|
$5,880.940
|
$3,200.450
|
$4,084.120
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$462,617.870
|
$130,000.170
|
$200,000.000
|
$210,000.000
|
$440,000.000
|
$452,809.580
|
$484,500.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
7.000
|
$10,000.000
|
$2,300.000
|
$1,700.000
|
$6,000.000
|
$4,506.340
|
$4,518.640
|
$6,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
229.000
|
$50.000
|
$33.000
|
$39.000
|
$40.000
|
$40.890
|
$38.850
|
$38.850
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
229.000
|
$10.000
|
$11.000
|
$22.000
|
$9.250
|
$9.610
|
$9.150
|
$9.150
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
120.000
|
$25.000
|
$55.000
|
$109.000
|
$28.000
|
$28.500
|
$27.100
|
$27.100
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
120.000
|
$5.000
|
$27.500
|
$33.000
|
$9.000
|
$9.170
|
$8.700
|
$8.700
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
525.000
|
$10.000
|
$17.600
|
$14.000
|
$8.000
|
$8.180
|
$7.790
|
$7.790
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
525.000
|
$5.000
|
$3.300
|
$6.000
|
$1.000
|
$1.040
|
$1.000
|
$1.000
|
|
|
ONE-WAY TRAF CONT (FLAGGER CONT)
|
HR
|
40.000
|
$60.000
|
$100.000
|
$300.000
|
$100.000
|
$199.270
|
$180.000
|
$113.940
|
|
|
CONC CURB (TY II)
|
LF
|
104.000
|
$50.000
|
$49.500
|
$100.000
|
$95.000
|
$74.140
|
$51.840
|
$48.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
45.000
|
$50.000
|
$56.100
|
$126.000
|
$125.000
|
$171.370
|
$54.000
|
$50.000
|
|
|
CONC CURB & GUTTER(VALLEY GUTTER)(36")
|
LF
|
102.000
|
$50.000
|
$112.200
|
$140.000
|
$130.000
|
$109.720
|
$74.520
|
$68.600
|
|
|
INTERSECTIONS (CONC)
|
SY
|
284.000
|
$150.000
|
$99.000
|
$260.000
|
$300.000
|
$129.550
|
$179.280
|
$230.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
60.000
|
$60.000
|
$387.210
|
$180.000
|
$100.000
|
$320.300
|
$101.200
|
$118.300
|
|
|
CURB RAMPS (TY 1)
|
EA
|
2.000
|
$2,500.000
|
$2,750.000
|
$2,400.000
|
$2,500.000
|
$1,899.570
|
$2,159.970
|
$1,999.000
|
|
|
CURB RAMPS (TY 2)
|
EA
|
2.000
|
$3,500.000
|
$2,750.000
|
$2,500.000
|
$2,500.000
|
$2,038.580
|
$2,612.490
|
$2,419.000
|
|
|
CURB RAMPS (TY 3)
|
EA
|
1.000
|
$3,000.000
|
$2,750.000
|
$2,600.000
|
$2,500.000
|
$2,038.580
|
$2,860.890
|
$2,649.000
|
|
|
CURB RAMPS (TY 5)
|
EA
|
1.000
|
$3,500.000
|
$2,750.000
|
$4,200.000
|
$4,000.000
|
$4,363.620
|
$3,346.880
|
$3,099.000
|
|
|
CURB RAMPS (TY 7)
|
EA
|
2.000
|
$2,500.000
|
$2,750.000
|
$2,400.000
|
$2,500.000
|
$2,184.280
|
$2,482.890
|
$2,299.000
|
|
|
CURB RAMPS (TY 10)
|
EA
|
1.000
|
$2,500.000
|
$2,750.000
|
$2,400.000
|
$2,500.000
|
$2,079.470
|
$2,212.890
|
$2,049.000
|
|
|
CONC MEDIAN
|
SY
|
990.000
|
$125.000
|
$99.000
|
$160.000
|
$150.000
|
$89.800
|
$163.000
|
$175.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
25.000
|
$35.000
|
$71.500
|
$55.000
|
$275.000
|
$50.650
|
$49.750
|
$48.150
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
2.000
|
$3,000.000
|
$1,259.500
|
$4,000.000
|
$7,500.000
|
$7,471.420
|
$4,227.780
|
$2,355.000
|
|
|
SHORT RADIUS
|
LF
|
18.000
|
$150.000
|
$93.500
|
$107.000
|
$500.000
|
$57.640
|
$97.650
|
$54.750
|
|
|
DRIVEWAY TERMINAL ANCHOR SECTION
|
EA
|
1.000
|
$1,000.000
|
$880.000
|
$1,500.000
|
$5,800.000
|
$894.430
|
$1,336.710
|
$850.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
2.000
|
$2,000.000
|
$880.000
|
$2,000.000
|
$4,100.000
|
$1,799.460
|
$1,831.340
|
$1,710.000
|
|
|
MTL BM GD FEN TRANS (NON - SYM)
|
EA
|
2.000
|
$1,000.000
|
$935.000
|
$1,400.000
|
$4,000.000
|
$937.640
|
$1,261.090
|
$891.000
|
|
|
MTL BM GD FEN TRANS (31"-28")(25')
|
EA
|
1.000
|
$1,000.000
|
$935.000
|
$1,300.000
|
$5,800.000
|
$821.880
|
$1,172.940
|
$781.000
|
|
|
MTL W-BEAM GD FEN (NESTED)(TIM POST)
|
LF
|
40.000
|
$50.000
|
$82.500
|
$100.000
|
$200.000
|
$51.740
|
$75.000
|
$49.180
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
1.000
|
$3,500.000
|
$4,427.500
|
$4,300.000
|
$15,000.000
|
$3,556.810
|
$3,868.610
|
$3,380.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
71.000
|
$750.000
|
$951.500
|
$770.000
|
$700.000
|
$678.750
|
$675.000
|
$645.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
5.000
|
$1,000.000
|
$968.000
|
$980.000
|
$900.000
|
$773.410
|
$855.000
|
$735.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
3.000
|
$1,250.000
|
$962.500
|
$1,100.000
|
$950.000
|
$994.390
|
$1,010.000
|
$945.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
1.000
|
$1,000.000
|
$968.000
|
$1,100.000
|
$1,000.000
|
$784.010
|
$887.000
|
$745.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
5.000
|
$1,000.000
|
$968.000
|
$1,100.000
|
$1,000.000
|
$952.310
|
$1,076.000
|
$905.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
1.000
|
$1,500.000
|
$968.000
|
$1,100.000
|
$1,000.000
|
$1,141.830
|
$1,347.000
|
$1,085.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
1.000
|
$1,750.000
|
$968.000
|
$1,100.000
|
$1,000.000
|
$1,267.950
|
$1,340.000
|
$1,205.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
96.000
|
$125.000
|
$148.500
|
$120.000
|
$110.000
|
$115.770
|
$95.000
|
$110.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
8.000
|
$35.000
|
$82.500
|
$40.000
|
$35.000
|
$20.710
|
$25.000
|
$25.500
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
2.000
|
$45.000
|
$44.000
|
$33.000
|
$30.000
|
$18.430
|
$10.000
|
$17.500
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
8.000
|
$35.000
|
$82.500
|
$50.000
|
$45.000
|
$44.160
|
$30.000
|
$27.500
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
2.000
|
$150.000
|
$181.500
|
$82.000
|
$75.000
|
$76.270
|
$110.000
|
$72.500
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)SRF)SRF
|
EA
|
6.000
|
$125.000
|
$203.500
|
$82.000
|
$75.000
|
$110.510
|
$130.000
|
$105.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
2,280.000
|
$1.000
|
$0.280
|
$1.400
|
$1.250
|
$0.590
|
$0.570
|
$1.250
|
|
|
WK ZN PAV MRK NON-REMOV (W)12"(SLD)
|
LF
|
85.000
|
$2.000
|
$5.500
|
$10.400
|
$9.500
|
$7.630
|
$7.270
|
$9.500
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
1,453.000
|
$1.000
|
$0.280
|
$1.400
|
$1.250
|
$0.590
|
$0.570
|
$1.250
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
12,031.000
|
$1.000
|
$0.280
|
$1.000
|
$0.950
|
$0.450
|
$0.420
|
$0.950
|
|
|
WK ZN PAV MRK NON-REMOV (Y)12"(SLD)
|
LF
|
175.000
|
$1.500
|
$5.500
|
$16.400
|
$15.000
|
$7.630
|
$7.240
|
$15.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
1,240.000
|
$2.000
|
$2.000
|
$2.200
|
$1.820
|
$3.020
|
$1.630
|
$2.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
1,956.000
|
$2.000
|
$2.000
|
$2.200
|
$1.820
|
$2.730
|
$1.630
|
$2.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
332.000
|
$1.250
|
$1.650
|
$1.700
|
$1.500
|
$1.090
|
$1.020
|
$1.500
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
85.000
|
$4.000
|
$4.400
|
$5.500
|
$5.000
|
$9.660
|
$9.190
|
$5.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
697.000
|
$20.000
|
$8.800
|
$10.900
|
$10.000
|
$11.100
|
$10.560
|
$10.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
23.000
|
$225.000
|
$137.500
|
$191.000
|
$175.000
|
$172.660
|
$164.090
|
$175.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
5.000
|
$200.000
|
$275.000
|
$218.000
|
$200.000
|
$176.870
|
$168.100
|
$200.000
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
|
EA
|
6.000
|
$75.000
|
$27.500
|
$65.500
|
$60.000
|
$55.060
|
$52.300
|
$60.000
|
|
REFL PAV MRK TY I (Y)8"(SLD)(100MIL)
|
LF
|
323.000
|
$2.000
|
$1.650
|
$1.700
|
$1.500
|
$1.040
|
$0.990
|
$1.500
|
|
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
|
LF
|
467.000
|
$10.000
|
$4.400
|
$5.500
|
$5.000
|
$9.660
|
$9.190
|
$5.000
|
|
|
PAVEMENT SEALER 6"
|
LF
|
27,372.000
|
$1.000
|
$0.390
|
$0.300
|
$0.250
|
$0.250
|
$0.240
|
$0.250
|
|
|
PAVEMENT SEALER 8"
|
LF
|
655.000
|
$1.250
|
$0.500
|
$0.600
|
$0.500
|
$0.840
|
$0.790
|
$0.500
|
|
|
PAVEMENT SEALER 12"
|
LF
|
552.000
|
$2.750
|
$2.200
|
$1.100
|
$1.000
|
$0.890
|
$0.860
|
$1.000
|
|
|
PAVEMENT SEALER 24"
|
LF
|
697.000
|
$3.000
|
$4.400
|
$2.200
|
$2.000
|
$3.170
|
$3.000
|
$2.000
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
23.000
|
$90.000
|
$82.500
|
$38.000
|
$35.000
|
$85.880
|
$81.610
|
$35.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
5.000
|
$90.000
|
$82.500
|
$49.000
|
$45.000
|
$96.540
|
$91.740
|
$45.000
|
|
|
PAVEMENT SEALER (YLD TRI)
|
EA
|
6.000
|
$10.000
|
$16.500
|
$13.700
|
$12.500
|
$11.600
|
$11.030
|
$12.500
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
3,160.000
|
$1.000
|
$0.940
|
$1.100
|
$1.000
|
$1.090
|
$1.020
|
$1.000
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
6,323.000
|
$1.000
|
$0.940
|
$1.000
|
$0.850
|
$0.840
|
$0.800
|
$0.850
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
1,453.000
|
$0.900
|
$0.940
|
$1.100
|
$1.000
|
$1.090
|
$1.020
|
$1.000
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
16,436.000
|
$1.500
|
$0.940
|
$1.000
|
$0.850
|
$0.840
|
$0.800
|
$0.850
|
|
REFL PAV MRKR TY I-C
|
EA
|
199.000
|
$6.000
|
$5.500
|
$7.000
|
$6.000
|
$4.610
|
$4.400
|
$6.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
635.000
|
$6.000
|
$5.500
|
$7.000
|
$6.000
|
$4.610
|
$4.400
|
$6.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
27,372.000
|
$0.250
|
$0.010
|
$0.100
|
$0.100
|
$0.500
|
$0.450
|
$0.100
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
655.000
|
$0.750
|
$0.020
|
$0.300
|
$0.250
|
$0.590
|
$0.580
|
$0.250
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
552.000
|
$1.000
|
$0.030
|
$0.600
|
$0.500
|
$0.890
|
$0.850
|
$0.500
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
697.000
|
$2.000
|
$0.070
|
$1.100
|
$3.000
|
$2.030
|
$1.920
|
$1.000
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
23.000
|
$30.000
|
$5.500
|
$10.900
|
$10.000
|
$31.570
|
$30.000
|
$10.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
5.000
|
$40.000
|
$5.500
|
$16.400
|
$15.000
|
$35.780
|
$34.000
|
$15.000
|
|
|
SP MIXES SP-C SAC-A PG70-22
|
TON
|
5,805.000
|
$160.000
|
$134.690
|
$113.000
|
$128.000
|
$145.000
|
$146.000
|
$185.000
|
|
|
UNDERSEAL COURSE
|
GAL
|
10,096.000
|
$5.000
|
$4.440
|
$4.000
|
$5.000
|
$5.500
|
$4.640
|
$4.110
|
|
|
INSTALL BRIDGE IDENTIFICATION NUMBERS
|
EA
|
2.000
|
$1,000.000
|
$275.000
|
$1,100.000
|
$300.000
|
$263.050
|
$250.000
|
$1,000.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$12,500.000
|
$18,000.000
|
$15,000.000
|
$5,500.000
|
$26,119.800
|
$23,815.000
|
$15,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
65.000
|
$250.000
|
$225.000
|
$710.000
|
$150.000
|
$243.480
|
$270.620
|
$175.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
86.000
|
$550.000
|
$100.000
|
$710.000
|
$150.000
|
$991.170
|
$119.070
|
$425.000
|
|
Totals: |
$5,100,796.570
|
$3,751,987.900
|
$3,991,116.200
|
$3,999,852.520
|
$4,444,444.444
|
$4,833,613.251
|
$5,092,300.708
|