PREPARING ROW
|
STA
|
21.810
|
$13,500.000
|
$19,000.000
|
$14,000.000
|
$20,000.000
|
|
|
REMOV CONC (PAV)
|
SY
|
224.000
|
$55.000
|
$20.000
|
$30.000
|
$50.000
|
|
|
REMOV CONC (SIDEWALK, RAMP OR SUP)
|
SY
|
95.000
|
$30.000
|
$25.000
|
$30.000
|
$50.000
|
|
|
REMOV CONC (CURB)
|
LF
|
35.000
|
$50.000
|
$15.000
|
$50.000
|
$50.000
|
|
|
REMOV CONC (CURB & GUTTER)
|
LF
|
199.000
|
$50.000
|
$25.000
|
$50.000
|
$50.000
|
|
|
REMOV CONC (FLUME)
|
SY
|
11.000
|
$130.000
|
$45.000
|
$100.000
|
$50.000
|
|
|
RMV (2"-6") TRT/UNTRT BASE & ASPH PAV
|
SY
|
29.000
|
$20.000
|
$15.000
|
$35.000
|
$20.000
|
|
|
RMV (8"-12") TRT/UNTRT BASE & ASPH PAV
|
SY
|
301.000
|
$20.000
|
$17.000
|
$45.000
|
$30.000
|
|
|
RMV (14"-18") TRT/UNTRT BASE & ASPH PAV
|
SY
|
1,097.000
|
$20.000
|
$24.000
|
$25.000
|
$40.000
|
|
|
EXCAV (ROADWAY)
|
CY
|
5,335.000
|
$30.000
|
$30.000
|
$8.000
|
$30.000
|
|
|
EXCAV (CHANNEL)
|
CY
|
5,875.000
|
$25.000
|
$27.000
|
$17.000
|
$50.000
|
|
|
SUBGR WIDEN (OC)
|
STA
|
3.850
|
$1,200.000
|
$10,000.000
|
$1,500.000
|
$650.000
|
|
|
EMBANK (FNL)(OC)(TY A)
|
CY
|
204.000
|
$25.000
|
$40.000
|
$75.000
|
$80.000
|
|
|
EMBANK (FNL)(OC)(TY C)
|
CY
|
1,863.000
|
$30.000
|
$25.000
|
$20.000
|
$80.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
21.810
|
$402.000
|
$600.000
|
$600.000
|
$650.000
|
|
|
ROAD GRADER WORK (ORD COMP)
|
STA
|
21.810
|
$200.000
|
$350.000
|
$100.000
|
$450.000
|
|
|
FURN & PLACE TOPSOIL (4")
|
SY
|
10,327.000
|
$4.500
|
$2.000
|
$4.000
|
$10.000
|
|
|
BLOCK SODDING
|
SY
|
2,517.000
|
$10.000
|
$4.500
|
$5.000
|
$10.000
|
|
|
DRILL SEED (TEMP_WARM_COOL)
|
SY
|
3,408.000
|
$0.330
|
$0.400
|
$0.150
|
$1.000
|
|
|
HYDRO MULCH SEED (PERM_URBAN_CLAY)
|
SY
|
10,327.000
|
$1.000
|
$0.450
|
$1.050
|
$1.000
|
|
|
VEGETATIVE WATERING
|
TGL
|
2,418.000
|
$10.000
|
$0.010
|
$3.000
|
$20.000
|
|
|
FL BS (CMP IN PLC)(TY D GR 1-2) (10")
|
SY
|
7,598.000
|
$20.000
|
$35.000
|
$30.000
|
$30.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
1,514.000
|
$11.000
|
$11.000
|
$12.000
|
$10.000
|
|
|
SP MIXES SP-B PG64-22
|
TON
|
2,914.000
|
$160.000
|
$143.000
|
$143.500
|
$180.000
|
|
|
SP MIXES SP-C SAC-B PG64-22
|
TON
|
832.000
|
$175.000
|
$155.000
|
$166.750
|
$220.000
|
|
|
TACK COAT
|
GAL
|
454.000
|
$5.760
|
$2.000
|
$2.000
|
$10.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
1,256.000
|
$21.000
|
$1.000
|
$6.000
|
$10.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
45.000
|
$800.000
|
$600.000
|
$900.000
|
$550.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
2,152.000
|
$370.000
|
$140.000
|
$215.000
|
$185.000
|
|
|
CONC BOX CULV (10 FT X 8 FT)
|
LF
|
280.000
|
$1,200.000
|
$1,885.000
|
$1,000.000
|
$1,650.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
108.000
|
$150.000
|
$200.000
|
$150.000
|
$120.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
310.000
|
$250.000
|
$225.000
|
$170.000
|
$165.000
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
141.000
|
$420.000
|
$275.000
|
$220.000
|
$250.000
|
|
|
JCTBOX(COMPL)(PJB)(5FTX5FT)
|
EA
|
2.000
|
$6,000.000
|
$5,400.000
|
$10,000.000
|
$12,500.000
|
|
|
INLET (COMPL)(PCO)(5FT)(NONE)
|
EA
|
1.000
|
$6,000.000
|
$5,400.000
|
$12,000.000
|
$12,500.000
|
|
|
INLET (COMPL)(PCO)(5FT)(LEFT)
|
EA
|
1.000
|
$8,000.000
|
$5,600.000
|
$13,000.000
|
$12,500.000
|
|
|
INL(CMP)(PAZD-CZ)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
2.000
|
$8,000.000
|
$6,000.000
|
$10,000.000
|
$12,500.000
|
|
|
WINGWALL (PW - 1) (HW=8 FT)
|
EA
|
1.000
|
$35,000.000
|
$45,000.000
|
$55,000.000
|
$65,000.000
|
|
|
WINGWALL (PW - 1) (HW=9 FT)
|
EA
|
2.000
|
$42,500.000
|
$55,000.000
|
$75,000.000
|
$75,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$2,080.000
|
$2,500.000
|
$1,500.000
|
$2,250.000
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (C)
|
EA
|
1.000
|
$6,000.000
|
$4,000.000
|
$6,000.000
|
$3,500.000
|
|
|
SET (TY II) (42 IN) (RCP) (6: 1) (P)
|
EA
|
1.000
|
$5,000.000
|
$8,000.000
|
$7,500.000
|
$8,500.000
|
|
|
ADJUSTING MANHOLES
|
EA
|
1.000
|
$1,500.000
|
$1,500.000
|
$3,000.000
|
$2,500.000
|
|
|
REMOV STR (INLET)
|
EA
|
4.000
|
$1,000.000
|
$2,000.000
|
$2,000.000
|
$2,500.000
|
|
|
REMOV STR (MANHOLE)
|
EA
|
3.000
|
$1,500.000
|
$2,000.000
|
$3,000.000
|
$2,500.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
2.000
|
$2,448.000
|
$2,000.000
|
$10,000.000
|
$2,500.000
|
|
|
REMOV STR (PIPE)
|
LF
|
2,768.000
|
$5.000
|
$10.000
|
$50.000
|
$50.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
228.000
|
$322.000
|
$100.000
|
$125.000
|
$200.000
|
|
|
REMOVE STR (BOLLARD)
|
EA
|
2.000
|
$432.000
|
$250.000
|
$250.000
|
$500.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$398,340.000
|
$415,000.000
|
$450,000.000
|
$500,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
10.000
|
$15,000.000
|
$3,478.630
|
$20,000.000
|
$15,000.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$12,000.000
|
$10,000.000
|
$7,500.000
|
$20,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
60.000
|
$450.000
|
$183.330
|
$150.000
|
$250.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
2.000
|
$214.000
|
$900.000
|
$1,000.000
|
$550.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
28.000
|
$30.000
|
$50.000
|
$60.000
|
$50.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
28.000
|
$15.000
|
$20.000
|
$30.000
|
$20.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
5,153.000
|
$5.000
|
$3.600
|
$3.000
|
$4.000
|
|
|
TEMP SDMT CONT FENCE (INLET PROTECTION)
|
LF
|
86.000
|
$8.000
|
$8.000
|
$6.000
|
$6.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
5,239.500
|
$3.000
|
$1.200
|
$2.000
|
$2.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
500.000
|
$7.000
|
$6.000
|
$6.000
|
$18.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
500.000
|
$3.000
|
$1.250
|
$3.000
|
$9.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
354.000
|
$140.000
|
$37.680
|
$75.000
|
$85.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
252.000
|
$140.000
|
$107.250
|
$175.000
|
$100.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
43.000
|
$90.000
|
$92.090
|
$175.000
|
$72.000
|
|
|
CURB RAMPS (TY 7)
|
EA
|
2.000
|
$3,000.000
|
$2,625.830
|
$3,750.000
|
$3,850.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
236.000
|
$30.000
|
$39.000
|
$32.250
|
$50.000
|
|
|
SHORT RADIUS (28")
|
LF
|
187.000
|
$35.000
|
$51.000
|
$32.250
|
$85.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
3.000
|
$1,390.000
|
$1,525.000
|
$1,400.000
|
$1,850.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
26.000
|
$30.000
|
$4.000
|
$35.000
|
$5.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
3.000
|
$3,500.000
|
$3,100.000
|
$3,400.000
|
$3,850.000
|
|
|
CHAIN LINK FENCE (REMOVE)
|
LF
|
290.000
|
$5.000
|
$6.250
|
$12.500
|
$20.000
|
|
|
REMOVE AND INSTALL EXISTING GATE
|
EA
|
1.000
|
$2,000.000
|
$6,252.920
|
$3,000.000
|
$10,000.000
|
|
|
WIRE FENCE (REMOVE)
|
LF
|
583.000
|
$20.000
|
$2.250
|
$2.750
|
$3.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
14.000
|
$1,200.000
|
$775.000
|
$850.000
|
$1,500.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
5.000
|
$95.000
|
$55.000
|
$60.000
|
$100.000
|
|
|
INSTL OM ASSM (OM-3R)(WFLX)SRF(BI)
|
EA
|
19.000
|
$300.000
|
$450.000
|
$485.000
|
$100.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
456.000
|
$2.000
|
$3.000
|
$2.150
|
$6.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
124.000
|
$10.000
|
$26.000
|
$16.700
|
$20.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
4.000
|
$175.000
|
$750.000
|
$215.000
|
$250.000
|
|
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
|
EA
|
2.000
|
$250.000
|
$750.000
|
$350.000
|
$500.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
4.000
|
$200.000
|
$750.000
|
$270.000
|
$250.000
|
|
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
|
LF
|
46.000
|
$10.000
|
$26.000
|
$14.000
|
$20.000
|
|
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
|
LF
|
3,299.000
|
$1.000
|
$1.500
|
$1.350
|
$3.000
|
|
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
|
LF
|
3,567.000
|
$1.000
|
$1.500
|
$1.350
|
$3.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
18.000
|
$6.000
|
$10.000
|
$27.000
|
$6.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
63.000
|
$6.000
|
$10.000
|
$27.000
|
$6.000
|
|
|
FULL - WIDTH MOWING
|
CYC
|
3.000
|
$2,000.000
|
$550.000
|
$2,500.000
|
$5,000.000
|
|
|
WATER MAIN PIPE(PVC)(12IN)(DR 18)(C900)
|
LF
|
174.000
|
$250.000
|
$150.000
|
$525.000
|
$200.000
|
|
|
CASING STEEL (30IN)
|
LF
|
47.000
|
$400.000
|
$600.000
|
$945.000
|
$850.000
|
|
|
CASING STEEL (24IN)
|
LF
|
234.000
|
$160.000
|
$575.000
|
$630.000
|
$650.000
|
|
|
WATER MAIN PIPE (PVC)(18IN)(DR18)(C900)
|
LF
|
198.000
|
$350.000
|
$250.000
|
$630.000
|
$250.000
|
|
|
12” GATE VALVE
|
EA
|
1.000
|
$6,000.000
|
$15,000.000
|
$7,350.000
|
$12,500.000
|
|
|
18” GATE VALVE (VERTICAL)
|
EA
|
1.000
|
$25,000.000
|
$35,000.000
|
$36,750.000
|
$30,000.000
|
|
|
5’ DROP MANHOLE (PRE-CAST)
|
EA
|
3.000
|
$4,000.000
|
$15,000.000
|
$21,000.000
|
$15,000.000
|
|
|
18” X 18” CUT-IN-TEE
|
EA
|
1.000
|
$20,000.000
|
$25,000.000
|
$21,000.000
|
$20,000.000
|
|
|
18” HORIZONTAL BEND
|
EA
|
3.000
|
$2,000.000
|
$5,000.000
|
$6,300.000
|
$20,000.000
|
|
|
12” HORIZONTAL BEND
|
EA
|
2.000
|
$2,000.000
|
$4,000.000
|
$3,675.000
|
$12,500.000
|
|
|
18”X12” REDUCER
|
EA
|
1.000
|
$2,000.000
|
$3,000.000
|
$9,450.000
|
$15,000.000
|
|
|
12” TO 8” REDUCER
|
EA
|
1.000
|
$2,000.000
|
$2,700.000
|
$6,300.000
|
$12,500.000
|
|
|
PIPE (PVC)(SDR-26)(15IN)
|
LF
|
345.000
|
$150.000
|
$250.000
|
$262.500
|
$150.000
|
|
|
FIRE HYDRANT REMOVE AND REPLACE
|
EA
|
2.000
|
$1,500.000
|
$10,000.000
|
$15,750.000
|
$20,000.000
|
|
Totals: |
$4,381,737.300
|
$4,164,553.250
|
$4,424,423.350
|
$5,358,745.500
|