Job Info for 6441-25-001

County: KAUFMAN Highway: IH0020 Date: 08/03/2023 (1 year ago) Engineer's Estimate: $1,608,110 Control Number: 6441-25-001
Project: RMC - 644125001 District: DALLAS Time: 365 CALENDAR DAYS Type: METAL BEAM GUARD FENCE REPAIR
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13
Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $1,608,110.00
FIREMAN EXCAVATING, INC.   $1,042,858.50 1
-35.15% | -$565,251.50
ROSS SA ENTERPRISE LLC   $1,450,286.00 2
-9.81% | -$157,824.00
39.07% | $407,427.50
ROY JORGENSEN ASSOCIATES, INC.   $2,525,309.00 3
57.04% | $917,199.00
142.15% | $1,482,450.50
74.12% | $1,075,023.00
VANN/ELLI, INC.   $3,265,276.00 4
103.05% | $1,657,166.00
213.11% | $2,222,417.50
29.30% | $739,967.00

Bid Items

Items: 42, 0 filtered
KAUFMAN IH0020  |  DALLAS  |  6441-25-001  |  08/03/2023  |  $1,608,110  |  RMC - 644125001  |  METAL BEAM GUARD FENCE REPAIR  |  365 CALENDAR DAYS
Item code Description Unit Quantity Engineer's Estimate FIREMAN EXCAVATING, INC. ROSS SA ENTERPRISE LLC ROY JORGENSEN ASSOCIATES, INC. VANN/ELLI, INC.
429 6007 CONC STR REPAIR (VERTICAL & OVERHEAD) SF 50.000 $200.000 $50.000 $100.000 $150.000 $750.000
500 6033 MOBILIZATION (CALLOUT) EA 250.000 $55.000 $2,000.000 $1.000 $1,500.000 $250.000
770 6001 REPAIR RAIL ELEMENT (W - BEAM) LF 10,000.000 $20.000 $5.000 $20.000 $30.000 $20.000
770 6002 REPAIR RAIL ELEMENT (THRIE - BEAM) LF 50.000 $55.000 $350.000 $50.000 $30.000 $400.000
770 6003 REP RAIL ELMNT(THRIE-BM TRANS TO W -BM) LF 25.000 $55.000 $350.000 $50.000 $30.000 $60.000
770 6005 REM/REPAIR RAIL ELEMENT (CURVED RAIL) LF 350.000 $20.000 $6.500 $30.000 $25.000 $65.000
770 6012 REM / REPL TIMBER POST W / O CONC FND EA 1,668.000 $50.000 $1.000 $1.000 $40.000 $52.000
770 6013 REM / REPL STEEL POST W / O CONC FND EA 100.000 $50.000 $1.000 $35.000 $50.000 $85.000
770 6015 REM / REPL STEEL POST W / CONC FND EA 20.000 $40.000 $1.000 $100.000 $50.000 $95.000
770 6017 REALIGN POSTS EA 700.000 $50.000 $1.000 $125.000 $15.000 $25.000
770 6019 REMOVE & REPLACE BLOCKOUT EA 1,668.000 $120.000 $1.000 $1.000 $18.000 $30.000
770 6021 REPLACE SINGLE GDRAIL TERMINAL RAIL LF 3,000.000 $35.000 $5.000 $30.000 $28.000 $40.000
770 6022 REPLACE SINGLE GDRAIL TERMINAL POST EA 480.000 $75.000 $1.000 $1.000 $60.000 $500.000
770 6027 REMOVE GDRAIL END TRT / REPL WITH SGT EA 80.000 $3,000.000 $3,000.000 $3,750.000 $4,000.000 $4,000.000
770 6028 REPL SINGLE GDRAIL TERM IMPACT HEAD EA 100.000 $1,200.000 $500.000 $500.000 $1,500.000 $1,200.000
770 6029 REM & RESET SGT IMPACT HEAD EA 40.000 $175.000 $500.000 $100.000 $200.000 $350.000
770 6030 REPLACE SGT CABLE ASSEMBLY EA 100.000 $75.000 $20.000 $10.000 $90.000 $125.000
770 6031 REPLACE SGT CABLE ANCHOR EA 100.000 $55.000 $20.000 $10.000 $90.000 $100.000
770 6032 REPLACE SGT STRUT EA 50.000 $60.000 $20.000 $30.000 $90.000 $90.000
770 6033 REPLACE SGT OBJECT MARKER EA 50.000 $25.000 $10.000 $30.000 $30.000 $40.000
770 6052 REPAIR STEEL POST WITH BASE PLATE EA 100.000 $150.000 $100.000 $100.000 $375.000 $550.000
770 6057 REMOVE & REPLACE STL BLOCKOUT EA 100.000 $50.000 $100.000 $50.000 $18.000 $200.000
770 6060 REMOVE AND REPLACE DAT EA 22.000 $1,100.000 $800.000 $1,450.000 $1,550.000 $2,600.000
771 6001 REPLACE POSTS (TL-3) EA 500.000 $50.000 $1.000 $1.000 $150.000 $350.000
771 6002 REPLACE POSTS (TL-4) EA 2,500.000 $85.000 $1.000 $200.000 $275.000 $400.000
771 6003 CABLE SPLICE / TURNBUCKLE (TL-3) EA 2.000 $150.000 $20.000 $100.000 $250.000 $500.000
771 6004 CABLE SPLICE / TURNBUCKLE (TL-4) EA 50.000 $175.000 $20.000 $50.000 $400.000 $500.000
771 6006 REPAIR CONCRETE FOUNDATION (TL-4) EA 25.000 $110.000 $800.000 $50.000 $300.000 $125.000
771 6007 REPR OR REPLC CABLE BARR TERM SEC(TL-3) EA 5.000 $1,200.000 $100.000 $1.000 $500.000 $4,000.000
771 6008 REPR OR REPLC CABLE BARR TERM SEC(TL-4) EA 30.000 $900.000 $500.000 $1,000.000 $1,500.000 $4,200.000
771 6009 REPLACE CABLE (TL-3) LF 75.000 $10.000 $1.000 $10.000 $5.000 $7.000
771 6010 REPLACE CABLE (TL-4) LF 500.000 $5.000 $1.000 $5.000 $4.000 $7.000
771 6011 CHECK / RE-TENSION CABLE EA 300.000 $200.000 $6.000 $25.000 $300.000 $250.000
772 6005 POST AND CABLE FENCE(REMV / REPL POSTS) EA 25.000 $115.000 $5.000 $50.000 $40.000 $200.000
772 6006 POST AND CABLE FENCE(RMV/REPL CNC ANCH) EA 5.000 $100.000 $1.000 $50.000 $100.000 $1,000.000
772 6007 POST AND CABLE FENCE (REMV/ REPL CABLE) LF 50.000 $10.000 $0.500 $20.000 $50.000 $20.000
772 6009 POST AND CABLE FENCE (REPAIR) LF 250.000 $10.000 $0.500 $10.000 $20.000 $20.000
774 6044 REMOVE AND REPLACE (SMTC) (N) EA 2.000 $17,000.000 $20,000.000 $35,000.000 $27,500.000 $42,000.000
774 6059 REPAIR (TRACC) (BAY) EA 10.000 $800.000 $400.000 $500.000 $2,500.000 $7,500.000
774 6068 REPAIR (SMTC) (N) LF 50.000 $200.000 $50.000 $200.000 $150.000 $1,000.000
776 6032 REPAIR(STEEL POST W/ CHANNEL IRON RAIL) LF 25.000 $100.000 $1.500 $100.000 $125.000 $700.000
6185 6002 TMA (STATIONARY) DAY 365.000 $200.000 $1.000 $1.000 $1.000 $300.000
Totals: $1,608,110.00 $1,042,858.50 $1,450,286.00 $2,525,309.00 $3,265,276.00