Show Job Controls
Bid Cobra

KAUFMAN IH0020 (6441-25-001)

Items: 42

County: KAUFMAN
Length: N/A
Highway: IH0020
District: DALLAS
Control Number: 6441-25-001
DBE Goal: N/A
Project: RMC - 644125001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $1,608,110.00
Date: 08/03/2023 (2 years ago)
Contract Number: N/A
Type: METAL BEAM GUARD FENCE REPAIR
Mail/Deliver Bids To: N/A
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (4)
E
Engineer's Estimate
$1,608,110.00
$1,042,858.50
Over/Under Est: -35.15% -$565,251.50
$1,450,286.00
Over/Under Est: -9.81% -$157,824.00
Amt Left: 39.07% $407,427.50
Over/Under Est: 57.04% $917,199.00
Amt Left: 142.15% $1,482,450.50
Delta: -74.12% -$1,075,023.00
$3,265,276.00
Over/Under Est: 103.05% $1,657,166.00
Amt Left: 213.11% $2,222,417.50
Delta: -29.30% -$739,967.00

Bid Items & Bid Tabulations

42 Total 0 of 42
KAUFMAN  |  IH0020  |  DALLAS  |  6441-25-001  |  08/03/2023  |  $1,608,110.00  |  RMC - 644125001  |  METAL BEAM GUARD FENCE REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
FIREMAN EXCAVATING, INC.
ROSS SA ENTERPRISE LLC
ROY JORGENSEN ASSOCIATES, INC.
VANN/ELLI, INC.
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 50.000 $200.000 $50.000 $100.000 $150.000 $750.000
MOBILIZATION (CALLOUT)
EA 250.000 $55.000 $2,000.000 $1.000 $1,500.000 $250.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 10,000.000 $20.000 $5.000 $20.000 $30.000 $20.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 50.000 $55.000 $350.000 $50.000 $30.000 $400.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 25.000 $55.000 $350.000 $50.000 $30.000 $60.000
REM/REPAIR RAIL ELEMENT (CURVED RAIL)
LF 350.000 $20.000 $6.500 $30.000 $25.000 $65.000
REM / REPL TIMBER POST W / O CONC FND
EA 1,668.000 $50.000 $1.000 $1.000 $40.000 $52.000
REM / REPL STEEL POST W / O CONC FND
EA 100.000 $50.000 $1.000 $35.000 $50.000 $85.000
REM / REPL STEEL POST W / CONC FND
EA 20.000 $40.000 $1.000 $100.000 $50.000 $95.000
REALIGN POSTS
EA 700.000 $50.000 $1.000 $125.000 $15.000 $25.000
REMOVE & REPLACE BLOCKOUT
EA 1,668.000 $120.000 $1.000 $1.000 $18.000 $30.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 3,000.000 $35.000 $5.000 $30.000 $28.000 $40.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 480.000 $75.000 $1.000 $1.000 $60.000 $500.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 80.000 $3,000.000 $3,000.000 $3,750.000 $4,000.000 $4,000.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 100.000 $1,200.000 $500.000 $500.000 $1,500.000 $1,200.000
REM & RESET SGT IMPACT HEAD
EA 40.000 $175.000 $500.000 $100.000 $200.000 $350.000
REPLACE SGT CABLE ASSEMBLY
EA 100.000 $75.000 $20.000 $10.000 $90.000 $125.000
REPLACE SGT CABLE ANCHOR
EA 100.000 $55.000 $20.000 $10.000 $90.000 $100.000
REPLACE SGT STRUT
EA 50.000 $60.000 $20.000 $30.000 $90.000 $90.000
REPLACE SGT OBJECT MARKER
EA 50.000 $25.000 $10.000 $30.000 $30.000 $40.000
REPAIR STEEL POST WITH BASE PLATE
EA 100.000 $150.000 $100.000 $100.000 $375.000 $550.000
REMOVE & REPLACE STL BLOCKOUT
EA 100.000 $50.000 $100.000 $50.000 $18.000 $200.000
REMOVE AND REPLACE DAT
EA 22.000 $1,100.000 $800.000 $1,450.000 $1,550.000 $2,600.000
REPLACE POSTS (TL-3)
EA 500.000 $50.000 $1.000 $1.000 $150.000 $350.000
REPLACE POSTS (TL-4)
EA 2,500.000 $85.000 $1.000 $200.000 $275.000 $400.000
CABLE SPLICE / TURNBUCKLE (TL-3)
EA 2.000 $150.000 $20.000 $100.000 $250.000 $500.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 50.000 $175.000 $20.000 $50.000 $400.000 $500.000
REPAIR CONCRETE FOUNDATION (TL-4)
EA 25.000 $110.000 $800.000 $50.000 $300.000 $125.000
REPR OR REPLC CABLE BARR TERM SEC(TL-3)
EA 5.000 $1,200.000 $100.000 $1.000 $500.000 $4,000.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 30.000 $900.000 $500.000 $1,000.000 $1,500.000 $4,200.000
REPLACE CABLE (TL-3)
LF 75.000 $10.000 $1.000 $10.000 $5.000 $7.000
REPLACE CABLE (TL-4)
LF 500.000 $5.000 $1.000 $5.000 $4.000 $7.000
CHECK / RE-TENSION CABLE
EA 300.000 $200.000 $6.000 $25.000 $300.000 $250.000
POST AND CABLE FENCE(REMV / REPL POSTS)
EA 25.000 $115.000 $5.000 $50.000 $40.000 $200.000
POST AND CABLE FENCE(RMV/REPL CNC ANCH)
EA 5.000 $100.000 $1.000 $50.000 $100.000 $1,000.000
POST AND CABLE FENCE (REMV/ REPL CABLE)
LF 50.000 $10.000 $0.500 $20.000 $50.000 $20.000
POST AND CABLE FENCE (REPAIR)
LF 250.000 $10.000 $0.500 $10.000 $20.000 $20.000
REMOVE AND REPLACE (SMTC) (N)
EA 2.000 $17,000.000 $20,000.000 $35,000.000 $27,500.000 $42,000.000
REPAIR (TRACC) (BAY)
EA 10.000 $800.000 $400.000 $500.000 $2,500.000 $7,500.000
REPAIR (SMTC) (N)
LF 50.000 $200.000 $50.000 $200.000 $150.000 $1,000.000
REPAIR(STEEL POST W/ CHANNEL IRON RAIL)
LF 25.000 $100.000 $1.500 $100.000 $125.000 $700.000
TMA (STATIONARY)
DAY 365.000 $200.000 $1.000 $1.000 $1.000 $300.000
Totals: $1,608,110.000 $1,042,858.500 $1,450,286.000 $2,525,309.000 $3,265,276.000