Show Job Controls
Bid Cobra

KAUFMAN IH0020 (6396-38-001)

Items: 41

County: KAUFMAN
Length: N/A
Highway: IH0020
District: DALLAS
Control Number: 6396-38-001
DBE Goal: N/A
Project: RMC - 639638001
Guaranty: N/A
Time: 730 CALENDAR DAYS
Engineer's Estimate: $1,360,020.00
Date: 05/04/2022 (4 years ago)
Contract Number: N/A
Type: METAL BEAM GUARD FENCE REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (4)
E
Engineer's Estimate
$1,360,020.00
$1,217,990.00
Over/Under Est: -10.44% -$142,030.00
Over/Under Est: 62.31% $847,455.00
Amt Left: 81.24% $989,485.00
$2,641,075.00
Over/Under Est: 94.19% $1,281,055.00
Amt Left: 116.84% $1,423,085.00
Delta: -19.64% -$433,600.00
$2,733,525.00
Over/Under Est: 100.99% $1,373,505.00
Amt Left: 124.43% $1,515,535.00
Delta: -3.50% -$92,450.00

Bid Items & Bid Tabulations

41 Total 0 of 41
KAUFMAN  |  IH0020  |  DALLAS  |  6396-38-001  |  05/04/2022  |  $1,360,020.00  |  RMC - 639638001  |  METAL BEAM GUARD FENCE REPAIR  |  730 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
FIREMAN EXCAVATING, INC.
ROY JORGENSEN ASSOCIATES, INC.
CATOCON, INC.
VANN/ELLI, INC.
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 150.000 $50.000 $150.000 $185.000 $100.000 $75.000
MOBILIZATION (CALLOUT)
EA 50.000 $300.000 $1.000 $3,500.000 $1,500.000 $2,000.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 10,000.000 $20.000 $9.000 $30.000 $40.000 $25.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 25.000 $50.000 $200.000 $30.000 $60.000 $150.000
REM/REPAIR RAIL ELEMENT (CURVED RAIL)
LF 350.000 $3.000 $20.000 $30.000 $45.000 $45.000
REM / REPL TIMBER POST W / O CONC FND
EA 500.000 $40.000 $500.000 $25.000 $65.000 $65.000
REM / REPL STEEL POST W / O CONC FND
EA 15.000 $12.000 $50.000 $100.000 $100.000 $130.000
REM / REPL TIMBER POST W / CONC FND
EA 75.000 $400.000 $500.000 $45.000 $65.000 $85.000
REM / REPL STEEL POST W / CONC FND
EA 20.000 $15.000 $500.000 $100.000 $150.000 $150.000
REALIGN POSTS
EA 700.000 $10.000 $200.000 $15.000 $40.000 $40.000
REMOVE & REPLACE BLOCKOUT
EA 500.000 $10.000 $10.000 $20.000 $50.000 $25.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 6,000.000 $48.000 $40.000 $30.000 $55.000 $50.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 800.000 $60.000 $1.000 $85.000 $120.000 $100.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 16.000 $2,815.000 $1,200.000 $2,750.000 $4,500.000 $3,850.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 200.000 $800.000 $800.000 $1,300.000 $1,500.000 $1,100.000
REM & RESET SGT IMPACT HEAD
EA 70.000 $50.000 $50.000 $150.000 $300.000 $300.000
REPLACE SGT CABLE ASSEMBLY
EA 150.000 $60.000 $25.000 $85.000 $125.000 $100.000
REPLACE SGT CABLE ANCHOR
EA 150.000 $60.000 $25.000 $85.000 $125.000 $100.000
REPLACE SGT STRUT
EA 100.000 $50.000 $25.000 $80.000 $125.000 $100.000
REPLACE SGT OBJECT MARKER
EA 120.000 $25.000 $25.000 $20.000 $100.000 $40.000
REPAIR STEEL POST WITH BASE PLATE
EA 100.000 $300.000 $100.000 $300.000 $500.000 $500.000
REMOVE & REPLACE STL BLOCKOUT
EA 200.000 $20.000 $50.000 $20.000 $40.000 $150.000
REMOVE AND REPLACE DAT
EA 16.000 $1,850.000 $1,200.000 $1,700.000 $2,000.000 $1,500.000
REPLACE POSTS (TL-3)
EA 275.000 $55.000 $1.000 $150.000 $200.000 $220.000
REPLACE POSTS (TL-4)
EA 2,500.000 $110.000 $1.000 $200.000 $200.000 $310.000
CABLE SPLICE / TURNBUCKLE (TL-3)
EA 5.000 $20.000 $100.000 $250.000 $300.000 $500.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 50.000 $200.000 $50.000 $250.000 $300.000 $500.000
REPAIR CONCRETE FOUNDATION (TL-4)
EA 25.000 $100.000 $1,000.000 $500.000 $400.000 $100.000
REPR OR REPLC CABLE BARR TERM SEC(TL-3)
EA 10.000 $200.000 $1,200.000 $2,000.000 $500.000 $5,000.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 30.000 $1,500.000 $1,000.000 $3,200.000 $3,000.000 $5,000.000
REPLACE CABLE (TL-3)
LF 50.000 $3.000 $100.000 $10.000 $6.000 $6.000
REPLACE CABLE (TL-4)
LF 50.000 $3.000 $700.000 $10.000 $8.000 $6.000
CHECK / RE-TENSION CABLE
EA 200.000 $100.000 $10.000 $250.000 $100.000 $300.000
POST AND CABLE FENCE(REMV / REPL POSTS)
EA 25.000 $60.000 $50.000 $60.000 $400.000 $150.000
POST AND CABLE FENCE(RMV/REPL CNC ANCH)
EA 1.000 $300.000 $1,000.000 $500.000 $5,000.000 $500.000
POST AND CABLE FENCE (REMV/ REPL CABLE)
LF 100.000 $3.000 $10.000 $10.000 $10.000 $8.000
POST AND CABLE FENCE (REPAIR)
LF 50.000 $4.000 $10.000 $25.000 $60.000 $15.000
REPAIR (TRACC) (BAY)
EA 20.000 $200.000 $100.000 $450.000 $3,000.000 $2,500.000
REPAIR (SMTC) (N)
LF 162.000 $200.000 $300.000 $250.000 $500.000 $1,200.000
REPAIR(STEEL POST W/ CHANNEL IRON RAIL)
LF 50.000 $50.000 $100.000 $100.000 $200.000 $120.000
TMA (STATIONARY)
DAY 365.000 $75.000 $1.000 $550.000 $550.000 $150.000
Totals: $1,360,020.000 $1,217,990.000 $2,207,475.000 $2,641,075.000 $2,733,525.000