KAUFMAN FM 2932 (2981-01-007)

Items: 85

County: KAUFMAN
Length: N/A
Highway: FM 2932
District: DALLAS
Control Number: 2981-01-007
DBE Goal: N/A
Project: STP 2017(731)
Guaranty: N/A
Time: 206 WORKING DAYS
Engineer's Estimate: $5,461,477.50
Date: 02/03/2017 (9 years ago)
Contract Number: N/A
Type: BASE REPAIR,LEVEL UP,OVERLAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$5,461,477.50
$4,016,437.41
Over/Under Est: -26.46% -$1,445,040.09
$4,427,515.20
Over/Under Est: -18.93% -$1,033,962.30
Amt Left: 10.23% $411,077.79
Over/Under Est: -9.71% -$530,268.58
Amt Left: 22.78% $914,771.51
Delta: -11.38% -$503,693.72
Over/Under Est: -8.1% -$442,255.87
Amt Left: 24.97% $1,002,784.22
Delta: -1.78% -$88,012.71
$6,086,605.40
Over/Under Est: 11.45% $625,127.90
Amt Left: 51.54% $2,070,167.99
Delta: -21.27% -$1,067,383.77

Bid Items & Bid Tabulations

85 Total 0 of 85
KAUFMAN  |  FM 2932  |  DALLAS  |  2981-01-007  |  02/03/2017  |  $5,461,477.50  |  STP 2017(731)  |  BASE REPAIR,LEVEL UP,OVERLAY  |  206 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
OLDCASTLE MATERIALS TEXAS, INC.
A. L. HELMCAMP, INC.
AUSTIN BRIDGE & ROAD SERVICES, LP
ED BELL CONSTRUCTION COMPANY
FNH CONSTRUCTION, LLC
PREPARING ROW
STA 184.500 $3,250.000 $987.210 $811.000 $2,175.000 $1,266.000 $3,000.000
REMOVING CONC (RIPRAP)
SY 67.000 $15.000 $16.000 $33.000 $25.000 $20.000 $20.000
REMOVING CONC (MEDIANS)
SY 48.000 $20.000 $22.000 $46.000 $38.560 $20.000 $20.000
REMOVING CONC (DRIVEWAYS)
SY 260.000 $16.000 $16.000 $30.000 $41.520 $20.000 $20.000
REMOVING STAB BASE AND ASPH PAV (2"-6")
SY 66.000 $7.800 $17.000 $16.000 $22.500 $20.000 $20.000
REMOVING STAB BASE & ASPH PAV(14")
SY 37,215.000 $18.350 $2.200 $4.500 $2.970 $4.250 $7.000
REMOVING STAB BASE AND ASPH PAV (10")
SY 503.000 $12.000 $6.000 $11.000 $13.480 $10.500 $20.000
EXCAVATION (ROADWAY)
CY 81.000 $20.000 $20.000 $40.000 $26.320 $13.650 $20.000
SUBGRADE WIDENING (ORD COMP)
STA 180.000 $460.000 $335.000 $300.000 $278.120 $420.000 $450.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 6,137.000 $10.000 $21.000 $9.000 $13.390 $17.850 $25.000
BACKFILL (TY A OR B)
STA 178.000 $170.000 $185.000 $165.000 $105.140 $210.000 $450.000
ROAD GRADER WORK (ORD COMP)
STA 180.000 $220.000 $0.010 $300.000 $256.830 $840.000 $450.000
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 139,565.000 $0.120 $0.120 $0.150 $0.170 $0.180 $0.350
DRILL SEED (TEMP)(WARM OR COOL)
SY 20,522.000 $0.120 $0.130 $0.200 $0.270 $0.180 $0.350
VEGETATIVE WATERING
MG 4,027.000 $16.500 $0.010 $10.000 $0.010 $6.000 $25.000
FL BS (RDWY DEL) (TY D GR 1-2)
TON 1,498.000 $29.000 $18.000 $26.000 $29.640 $21.000 $25.000
FL BS (CMP IN PLC)(TY D GR1-2)(12")
SY 55,872.000 $16.000 $15.500 $19.000 $18.700 $17.850 $16.500
FL BS (CMP IN PLC)(TY D GR 1-2)(18 )
SY 903.000 $32.000 $32.000 $29.000 $34.630 $31.500 $38.000
REWORK BS MTL (TY C) (8") (ORD COMP)
SY 7,714.000 $2.960 $4.600 $2.000 $1.430 $4.200 $3.500
LIME (HYDRATED LIME (SLURRY))
TON 988.100 $150.000 $150.000 $160.000 $147.000 $157.500 $171.000
LIME TRT (EXST MATL) (6")
SY 48,884.000 $8.000 $3.000 $3.200 $3.660 $2.100 $3.500
CEMENT
TON 56.600 $148.000 $150.000 $135.000 $129.540 $220.000 $171.000
CEMENT TREAT (MX EXST MTL & NW BS) (6")
SY 10,834.000 $2.600 $2.000 $2.500 $1.620 $2.100 $4.250
SALV HAUL & STKPL RCL APH PV (6")
SY 7,944.000 $3.000 $3.500 $3.000 $3.630 $5.250 $10.000
EMULS ASPH (BS OR SUBGR TRT)(MS-2)
GAL 11,584.000 $2.850 $2.750 $3.500 $2.780 $3.170 $4.000
ASPH (CRS-2P)
GAL 9,655.000 $3.500 $3.000 $3.500 $1.950 $3.170 $4.000
ASPH (RC-250)
GAL 9,654.000 $3.500 $0.001 $4.500 $2.800 $3.940 $5.000
AGGR (TY-B GR-5 OR TY-L GR-5)
CY 180.000 $150.000 $135.000 $150.000 $196.710 $167.430 $200.000
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
GAL 9,654.000 $3.500 $3.600 $4.000 $2.200 $2.840 $4.000
AGGR (TY-B GR-3 OR TY-L GR-3)(SAC-B)
CY 360.000 $150.000 $142.000 $150.000 $156.090 $188.900 $180.000
SUPERPAVE MIXTURES SP-B PG64-22
TON 313.000 $72.000 $76.000 $95.200 $101.350 $105.180 $100.000
SUPERPAVE MIXTURES SP-D PG64-22
TON 6,455.500 $75.000 $65.000 $82.540 $75.000 $83.180 $80.000
PLANE ASPH CONC PAV (2")
SY 3,187.000 $1.500 $2.600 $3.500 $5.770 $4.010 $10.000
TEMPORARY SPL SHORING
SF 1,380.000 $20.000 $30.000 $31.000 $85.000 $52.500 $45.000
RIPRAP (CONC)(5 IN)
CY 133.500 $450.000 $625.000 $630.000 $588.940 $630.000 $650.000
RIPRAP (MOW STRIP)(4 IN)
CY 18.500 $450.000 $680.000 $680.000 $545.240 $735.000 $650.000
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
LF 36.000 $1,000.000 $680.000 $680.000 $450.000 $840.000 $1,000.000
CONC BOX CULV (9 FT X 7 FT)(EXTEND)
LF 69.000 $1,050.000 $950.000 $950.000 $850.000 $1,260.000 $1,000.000
CONC BOX CULV (10 FT X 10 FT)(EXTEND)
LF 92.000 $1,600.000 $1,275.000 $1,300.000 $1,150.000 $1,575.000 $1,350.000
RC PIPE (CL III)(18 IN)
LF 387.000 $50.000 $56.000 $56.000 $35.000 $84.000 $85.000
RC PIPE (CL III)(24 IN)
LF 18.000 $80.000 $132.000 $130.000 $75.000 $94.500 $105.000
WINGWALL (FW - S) (HW=5 FT)
EA 2.000 $6,300.000 $8,500.000 $8,500.000 $13,750.000 $21,000.000 $15,000.000
SET (TY I)(S=10 FT)(HW=10 FT)(3:1)(C)
EA 2.000 $32,000.000 $14,100.000 $17,000.000 $25,500.000 $33,000.000 $58,000.000
SET (TY I)(S=10 FT)(HW=11 FT)(3:1)(C)
EA 8.000 $9,500.000 $13,100.000 $14,000.000 $27,500.000 $14,000.000 $30,000.000
SET (TY I)(S= 8 FT)(HW= 10 FT(3:1) (C)
EA 4.000 $9,750.000 $12,700.000 $14,000.000 $24,500.000 $17,500.000 $35,000.000
SET (TY I)(S= 8 FT)(HW= 7 FT)(3:1) (C)
EA 2.000 $10,000.000 $9,500.000 $10,000.000 $22,750.000 $27,500.000 $35,000.000
SET (TY I)(S= 9 FT)(HW= 8 FT)(3:1) (C)
EA 6.000 $11,400.000 $10,300.000 $12,000.000 $23,750.000 $15,500.000 $25,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 22.000 $1,000.000 $950.000 $1,000.000 $1,100.000 $750.000 $850.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 2.000 $1,200.000 $1,060.000 $1,100.000 $1,350.000 $1,155.000 $1,250.000
CLEAN EXIST CULVERTS
EA 7.000 $650.000 $2,650.000 $2,600.000 $2,000.000 $3,150.000 $850.000
REMOV STR (SET)
EA 24.000 $371.000 $690.000 $700.000 $500.000 $420.000 $1,500.000
REMOV STR (WINGWALL)
EA 12.000 $900.000 $2,100.000 $2,000.000 $1,200.000 $2,100.000 $1,500.000
REMOV STR (PIPE)
LF 182.000 $10.000 $31.500 $31.000 $10.000 $31.500 $30.000
MOBILIZATION
LS 1.000 $502,995.000 $400,000.000 $378,000.000 $490,000.000 $482,000.000 $600,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $10,250.000 $12,500.000 $13,000.000 $10,000.000 $21,000.000 $8,500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 840.000 $28.000 $30.000 $29.000 $22.100 $25.760 $30.000
ROCK FILTER DAMS (REMOVE)
LF 840.000 $6.000 $12.000 $5.000 $6.150 $10.730 $15.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 1,200.000 $22.000 $28.260 $8.000 $23.060 $19.320 $45.000
CONSTRUCTION EXITS (REMOVE)
SY 1,200.000 $7.500 $8.340 $2.000 $6.000 $11.810 $20.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,475.000 $1.500 $2.550 $2.700 $2.880 $1.770 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,475.000 $0.400 $1.250 $0.500 $0.440 $0.540 $2.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 1,710.000 $3.000 $5.100 $4.000 $3.000 $4.020 $12.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,710.000 $0.400 $1.250 $0.700 $0.500 $1.070 $8.000
DRIVEWAYS (ACP)
SY 222.000 $50.000 $51.000 $90.000 $78.740 $55.000 $42.000
DRIVEWAYS (BASE)
SY 658.000 $35.000 $36.000 $34.000 $32.140 $55.000 $35.000
DRIVEWAYS (CONC) (HES)
SY 128.000 $125.000 $195.000 $185.000 $90.000 $126.000 $125.000
MTL W-BEAM GD FEN (TIM POST)
LF 400.000 $15.000 $17.000 $18.000 $21.250 $17.440 $25.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,000.000 $2,150.000 $2,500.000 $2,075.000 $2,200.270 $2,850.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 35.000 $185.000 $190.000 $240.000 $225.000 $193.190 $650.000
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 2.000 $216.000 $280.000 $300.000 $275.000 $284.430 $650.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 26.000 $348.000 $480.000 $470.000 $440.000 $440.050 $650.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 10.000 $470.000 $520.000 $560.000 $525.000 $529.140 $650.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 4.000 $700.000 $800.000 $780.000 $740.000 $786.730 $650.000
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND(BI)
EA 16.000 $50.000 $48.000 $70.000 $65.000 $48.300 $650.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 252.000 $1.160 $1.030 $3.000 $0.450 $2.550 $10.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 22.000 $6.600 $5.750 $5.800 $5.500 $5.900 $20.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 34,784.000 $0.350 $0.370 $0.370 $0.350 $0.380 $0.500
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 1,305.000 $0.450 $0.470 $0.500 $0.450 $0.480 $0.750
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 9,707.000 $0.400 $0.370 $0.400 $0.350 $0.380 $0.500
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 22,818.000 $0.350 $0.370 $0.400 $0.350 $0.380 $0.500
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 1,305.000 $0.440 $0.470 $0.500 $0.450 $0.480 $0.500
REFL PAV MRKR TY II-A-A
EA 252.000 $5.000 $3.150 $3.500 $3.000 $3.220 $15.000
PAV SURF PREP FOR MRK (4")
LF 2,340.000 $0.150 $0.160 $0.150 $0.150 $0.160 $0.500
FULL - WIDTH MOWING
CYC 1.000 $2,000.000 $2,100.000 $3,000.000 $7,500.000 $7,350.000 $5,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $12,200.000 $17,000.000 $5,000.000 $21,500.000 $10,500.000 $16,500.000
Totals: $5,461,477.500 $4,016,437.419 $4,427,515.200 $4,931,208.924 $5,019,221.630 $6,086,605.400