County: KAUFMAN Highway: FM 148 Date: 10/05/2023 (1 year ago) Engineer's Estimate: $8,260,263 Control Number: 0751-03-043
Project: F 2024(168) District: DALLAS Time: 223 WORKING DAYS Type: REHABILITATE EXISTING ROADWAY
HCS
Plans

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $8,260,263.48
FNH CONSTRUCTION, LLC   $11,589,085.19 1
40.3% | $3,328,821.71
A. L. HELMCAMP, INC.   $12,321,796.76 2
49.17% | $4,061,533.28
6.32% | $732,711.57
FLUOR HEAVY CIVIL, LLC   $12,583,663.02 3
52.34% | $4,323,399.54
8.58% | $994,577.83
2.13% | $261,866.26

Bid Items

Items: 110, 0 filtered
KAUFMAN FM 148  |  DALLAS  |  0751-03-043  |  10/05/2023  |  $8,260,263  |  F 2024(168)  |  REHAB EXIST ROADWAY  |  223 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate FNH CONSTRUCTION, LLC A. L. HELMCAMP, INC. FLUOR HEAVY CIVIL, LLC
100 6002 PREPARING ROW STA 250.640 $1,000.000 $3,271.000 $600.000 $6,400.000
104 6017 REMOVING CONC (DRIVEWAYS) SY 51.000 $25.000 $50.000 $55.000 $16.330
105 6043 REMOVING STAB BASE & ASPH PAV (0-6") SY 6,221.000 $6.000 $20.000 $25.000 $8.330
105 6137 REMOVE TRT BASE & ASPH PAV (12"-20") SY 14,956.000 $7.500 $15.000 $20.000 $14.680
110 6001 EXCAVATION (ROADWAY) CY 936.300 $13.250 $20.000 $50.000 $71.750
112 6001 SUBGRADE WIDENING (ORD COMP) STA 188.330 $205.000 $450.000 $600.000 $248.290
132 6005 EMBANKMENT (FINAL)(ORD COMP)(TY C) CY 5,376.750 $10.000 $30.000 $70.000 $6.920
134 6004 BACKFILL (TY A OR B) STA 249.420 $175.000 $450.000 $300.000 $460.270
152 6001 ROAD GRADER WORK (ORD COMP) STA 249.420 $150.000 $450.000 $300.000 $230.000
161 6017 COMPOST MANUF TOPSOIL (4") SY 144,802.000 $0.600 $6.000 $2.500 $1.200
164 6035 DRILL SEEDING (PERM) (RURAL) (CLAY) SY 144,802.000 $0.150 $0.500 $0.180 $0.220
164 6051 DRILL SEED (TEMP)(WARM OR COOL) SY 144,802.000 $0.150 $0.500 $0.170 $0.140
168 6001 VEGETATIVE WATERING MG 43,085.000 $0.100 $2.000 $1.000 $0.010
247 6073 FL BS (CMP IN PLC)(TY D GR 1-2) (6") SY 18,691.000 $14.000 $18.000 $25.000 $16.700
247 6313 FL BS (CMP IN PLC)(TY D GR1-2)(12") SY 76,039.000 $29.000 $25.000 $38.000 $35.370
251 6073 REWRKING BS MATL (TY C)(10")(ORD COMP) SY 50,220.000 $2.600 $4.000 $5.000 $2.710
275 6001 CEMENT TON 479.000 $225.000 $300.000 $325.000 $317.620
275 6002 CEMENT TREAT (EXIST MATL) (6") SY 62,775.000 $2.000 $6.000 $4.000 $6.170
275 6003 CEMENT TREAT (NEW BASE) (6") SY 18,691.000 $2.200 $6.000 $6.000 $4.690
314 6021 EMULS ASPH (PRIME)(MS-2 OR SS-1) GAL 15,213.000 $4.600 $6.000 $7.000 $8.740
316 6024 ASPH (CRS-2P) GAL 37,548.000 $4.100 $6.000 $6.000 $4.530
316 6419 ASPH (AC-15P, AC-20-5TR OR AC-20XP) GAL 15,972.000 $4.100 $6.000 $6.000 $4.770
316 6435 AGGR (TY-B GR-4 OR TY-L GR-4 SAC-B) CY 356.000 $125.000 $300.000 $550.000 $174.010
316 6440 AGGR (TY-B GR-3 OR TY-L GR-3)(SAC-B) CY 727.000 $125.000 $300.000 $350.000 $187.720
351 6002 FLEXIBLE PAVEMENT STRUCTURE REPAIR(6") SY 197.000 $85.000 $85.000 $400.000 $175.060
354 6045 PLANE ASPH CONC PAV (2") SY 1,958.000 $3.500 $20.000 $10.000 $8.200
400 6008 CUT & RESTORE ASPH PAVING SY 72.000 $100.000 $200.000 $220.000 $155.620
402 6001 TRENCH EXCAVATION PROTECTION LF 128.000 $8.000 $10.000 $11.000 $13.830
403 6001 TEMPORARY SPL SHORING SF 4,754.000 $45.000 $55.000 $55.000 $35.540
432 6002 RIPRAP (CONC)(5 IN) CY 29.600 $650.000 $650.000 $1,045.000 $785.250
432 6026 RIPRAP (STONE COMMON)(DRY)(18 IN) CY 367.000 $200.000 $250.000 $275.000 $229.540
462 6045 CONC BOX CULV (3 FT X 2 FT)(EXTEND) LF 19.000 $600.000 $1,000.000 $715.000 $816.590
462 6046 CONC BOX CULV (3 FT X 3 FT)(EXTEND) LF 14.000 $700.000 $1,000.000 $770.000 $1,043.210
462 6048 CONC BOX CULV (4 FT X 3 FT)(EXTEND) LF 16.000 $740.000 $1,000.000 $825.000 $1,218.580
462 6049 CONC BOX CULV (4 FT X 4 FT)(EXTEND) LF 18.000 $720.000 $1,250.000 $880.000 $1,137.490
462 6050 CONC BOX CULV (5 FT X 2 FT)(EXTEND) LF 14.000 $750.000 $1,500.000 $880.000 $1,216.750
462 6051 CONC BOX CULV (5 FT X 3 FT)(EXTEND) LF 40.000 $800.000 $1,600.000 $935.000 $1,191.520
462 6054 CONC BOX CULV (6 FT X 3 FT)(EXTEND) LF 30.000 $850.000 $1,700.000 $990.000 $1,484.040
462 6056 CONC BOX CULV (6 FT X 5 FT)(EXTEND) LF 45.000 $900.000 $1,800.000 $1,100.000 $1,648.210
462 6057 CONC BOX CULV (6 FT X 6 FT)(EXTEND) LF 28.000 $900.000 $1,900.000 $1,320.000 $1,631.420
462 6095 CONC BOX CULV (6 FT X 2 FT) (EXTEND) LF 14.000 $750.000 $1,500.000 $990.000 $1,428.760
464 6003 RC PIPE (CL III)(18 IN) LF 1,466.000 $60.000 $85.000 $71.500 $113.050
464 6005 RC PIPE (CL III)(24 IN) LF 308.000 $80.000 $125.000 $165.000 $150.700
464 6008 RC PIPE (CL III)(36 IN) LF 38.000 $125.000 $165.000 $275.000 $304.690
464 6018 RC PIPE (CL IV)(24 IN) LF 117.000 $130.000 $160.000 $176.000 $184.300
464 6019 RC PIPE (CL IV)(30 IN) LF 98.000 $190.000 $185.000 $247.500 $264.190
466 6097 HEADWALL (CH - PW - 0) (DIA= 24 IN) EA 2.000 $5,500.000 $3,500.000 $5,500.000 $6,420.980
466 6099 HEADWALL (CH - PW - 0) (DIA= 30 IN) EA 2.000 $6,500.000 $4,500.000 $7,150.000 $8,597.530
466 6192 WINGWALL (PW - 2) (HW=3 FT) EA 2.000 $18,000.000 $8,500.000 $7,150.000 $3,895.880
466 6193 WINGWALL (PW - 2) (HW=4 FT) EA 4.000 $20,000.000 $12,500.000 $9,900.000 $8,248.840
466 6194 WINGWALL (PW - 2) (HW=5 FT) EA 2.000 $22,000.000 $15,000.000 $14,300.000 $14,988.390
466 6195 WINGWALL (PW - 2) (HW=6 FT) EA 2.000 $23,000.000 $18,500.000 $24,200.000 $22,031.840
466 6196 WINGWALL (PW - 2) (HW=7 FT) EA 2.000 $27,000.000 $22,000.000 $31,900.000 $29,744.660
467 6111 SET (TY I)(S=3 FT)(HW= 4 FT)(3:1)(C) EA 2.000 $7,185.830 $12,500.000 $9,350.000 $17,091.770
467 6144 SET (TY I)(S= 4 FT)(HW= 4 FT)(4:1) (C) EA 2.000 $10,670.020 $14,500.000 $9,900.000 $22,212.770
467 6171 SET (TY I)(S= 5 FT)(HW= 3 FT)(3:1) (C) EA 2.000 $7,450.550 $17,500.000 $9,350.000 $12,080.770
467 6204 SET (TY I)(S= 6 FT)(HW= 3 FT)(3:1) (C) EA 2.000 $4,700.000 $18,500.000 $13,200.000 $12,144.890
467 6211 SET (TY I)(S= 6 FT)(HW= 4 FT)(3:1) (C) EA 2.000 $1,900.000 $19,000.000 $15,400.000 $19,250.730
467 6363 SET (TY II) (18 IN) (RCP) (6: 1) (P) EA 117.000 $750.000 $1,250.000 $1,100.000 $1,941.510
467 6390 SET (TY II) (24 IN) (RCP) (4: 1) (C) EA 4.000 $1,100.000 $2,200.000 $1,320.000 $1,826.130
467 6395 SET (TY II) (24 IN) (RCP) (6: 1) (P) EA 28.000 $1,300.000 $2,200.000 $2,750.000 $2,948.000
467 6419 SET (TY II) (30 IN) (RCP) (4: 1) (C) EA 2.000 $1,500.000 $3,650.000 $3,850.000 $3,137.830
467 6454 SET (TY II) (36 IN) (RCP) (6: 1) (P) EA 2.000 $3,200.000 $4,500.000 $6,050.000 $7,698.410
480 6001 CLEAN EXIST CULVERTS EA 12.000 $1,600.000 $1,500.000 $2,750.000 $1,844.240
496 6004 REMOV STR (SET) EA 72.000 $150.000 $500.000 $1,320.000 $143.380
496 6005 REMOV STR (WINGWALL) EA 22.000 $1,600.000 $1,000.000 $2,200.000 $4,097.470
496 6007 REMOV STR (PIPE) LF 175.800 $15.000 $50.000 $55.000 $18.500
496 6016 REMOV STR (PIPE) EA 60.000 $500.000 $500.000 $1,320.000 $195.850
500 6001 MOBILIZATION LS 1.000 $738,193.950 $1,000,000.000 $1,000,000.000 $1,250,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 14.000 $10,000.000 $8,500.000 $10,000.000 $38,450.870
506 6003 ROCK FILTER DAMS (INSTALL) (TY 3) LF 1,170.000 $65.000 $30.000 $60.500 $153.640
506 6011 ROCK FILTER DAMS (REMOVE) LF 1,170.000 $10.000 $15.000 $16.500 $23.320
506 6020 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 328.000 $20.000 $50.000 $29.700 $49.330
506 6024 CONSTRUCTION EXITS (REMOVE) SY 328.000 $5.000 $20.000 $16.500 $14.130
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 2,042.000 $3.000 $4.000 $3.470 $4.590
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 2,042.000 $0.300 $2.000 $0.550 $1.110
506 6041 BIODEG EROSN CONT LOGS (INSTL) (12") LF 2,111.000 $6.000 $18.000 $4.400 $6.330
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 2,111.000 $1.000 $9.000 $1.100 $1.110
530 6005 DRIVEWAYS (ACP) SY 5,791.000 $60.000 $40.000 $100.000 $84.860
530 6017 DRIVEWAYS (CONC) (HES) SY 52.000 $150.000 $150.000 $275.000 $235.740
533 6003 RUMBLE STRIPS (SHOULDER) ASPHALT LF 49,535.000 $0.150 $0.500 $0.240 $0.140
533 6004 RUMBLE STRIPS (CENTERLINE) ASPHALT LF 25,062.000 $0.150 $0.500 $0.270 $0.140
542 6001 REMOVE METAL BEAM GUARD FENCE LF 375.000 $3.000 $3.000 $15.000 $3.020
544 6003 GUARDRAIL END TREATMENT (REMOVE) EA 4.000 $250.000 $1,500.000 $350.000 $252.000
560 6011 MAILBOX INSTALL-S (TWW-POST) TY 4 EA 40.000 $260.000 $850.000 $330.000 $277.190
560 6012 MAILBOX INSTALL-D (TWW-POST) TY 4 EA 6.000 $320.000 $850.000 $385.000 $297.350
560 6013 MAILBOX INSTALL-M (TWW-POST) TY 4 EA 3.000 $725.000 $850.000 $660.000 $750.940
644 6001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 52.000 $725.000 $1,150.000 $687.500 $700.550
644 6004 IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA 1.000 $1,000.000 $1,150.000 $770.000 $670.310
644 6007 IN SM RD SN SUP&AM TY10BWG(1)SA(U) EA 4.000 $1,100.000 $1,150.000 $935.000 $937.420
644 6033 IN SM RD SN SUP&AM TYS80(1)SA(U) EA 1.000 $1,250.000 $1,150.000 $825.000 $957.580
644 6036 IN SM RD SN SUP&AM TYS80(1)SA(U-BM) EA 5.000 $1,500.000 $1,150.000 $110.000 $1,305.330
658 6100 INSTL OM ASSM (OM-2Z)(WFLX)GND(BI) EA 44.000 $70.000 $100.000 $71.500 $44.350
662 6111 WK ZN PAV MRK SHT TERM (TAB)TY Y-2 EA 3,133.000 $1.630 $6.000 $0.820 $2.620
666 6048 REFL PAV MRK TY I (W)24"(SLD)(100MIL) LF 140.000 $10.350 $9.000 $12.050 $11.040
666 6174 REFL PAV MRK TY II (W) 6" (SLD) LF 126,185.000 $0.330 $0.500 $0.290 $0.260
666 6208 REFL PAV MRK TY II (Y) 6" (BRK) LF 7,025.000 $0.330 $0.750 $0.310 $0.280
666 6210 REFL PAV MRK TY II (Y) 6" (SLD) LF 73,443.000 $0.330 $0.500 $0.290 $0.260
666 6225 PAVEMENT SEALER 6" LF 366.000 $0.300 $6.000 $1.100 $1.010
666 6309 RE PM W/RET REQ TY I (W)6"(SLD)(100MIL) LF 49,535.000 $1.040 $1.000 $0.780 $0.720
666 6318 RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL) LF 2,789.000 $0.620 $1.500 $0.790 $0.730
666 6321 RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL) LF 29,338.000 $1.040 $1.500 $0.780 $0.720
672 6009 REFL PAV MRKR TY II-A-A EA 562.000 $5.950 $6.000 $6.550 $6.000
678 6002 PAV SURF PREP FOR MRK (6") LF 366.000 $0.030 $6.000 $1.100 $1.010
730 6107 FULL - WIDTH MOWING CYC 3.000 $3,100.000 $5,000.000 $6,500.000 $3,124.740
3077 6013 SP MIXES SP-C SAC-B PG64-22 TON 8,588.000 $145.000 $145.000 $175.000 $134.880
3077 6075 TACK COAT GAL 4,788.000 $4.450 $6.000 $5.000 $1.050
6001 6002 PORTABLE CHANGEABLE MESSAGE SIGN EA 3.000 $12,000.000 $16,500.000 $25,000.000 $24,695.380
6185 6002 TMA (STATIONARY) DAY 223.000 $300.000 $250.000 $300.000 $117.060
6185 6005 TMA (MOBILE OPERATION) DAY 20.000 $200.000 $550.000 $850.000 $700.900
Totals: $8,260,263.49 $11,589,085.19 $12,321,796.76 $12,583,663.03