Show Job Controls
Bid Cobra

KAUFMAN SH 34 (0173-02-077)

Items: 98

County: KAUFMAN
Length: N/A
Highway: SH 34
District: DALLAS
Control Number: 0173-02-077
DBE Goal: N/A
Project: STP 2023(438)HES
Guaranty: N/A
Time: 302 WORKING DAYS
Engineer's Estimate: $11,623,858.11
Date: 02/02/2023 (3 years ago)
Contract Number: N/A
Type: REHABILITATE EXISTING ROADWAY
Mail/Deliver Bids To: N/A
LANE SELMAN
NICHOLAS WADLINGTON
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$11,623,858.11
$11,469,432.70
Over/Under Est: -1.33% -$154,425.41
$13,183,216.50
Over/Under Est: 13.42% $1,559,358.39
Amt Left: 14.94% $1,713,783.80
Over/Under Est: 41.95% $4,875,712.19
Amt Left: 43.86% $5,030,137.60
Delta: -25.16% -$3,316,353.80
Subcontractor Percentage Amount
J & M CONTRACTING, COMPANY 13.45% $1,558,812.36
J. H. ODEN CONTRACTING COMPANY 2.93% $339,577.71
COLD CREEK CONSTRUCTION, LTD 1.33% $154,142.78
TRP CONSTRUCTION GROUP, LLC 0.58% $67,220.16
MARCOMS CONSTRUCTION LLC 0.45% $52,153.57
BARRICADES UNLIMITED 0.27% $31,292.14
FORTSON CONTRACTING, INC. 0.19% $22,020.40
Total: 19.20% $2,225,219.12

Bid Items & Bid Tabulations

98 Total 0 of 98
KAUFMAN  |  SH 34  |  DALLAS  |  0173-02-077  |  02/02/2023  |  $11,623,858.11  |  STP 2023(438)HES  |  REHAB EXIST ROADWAY  |  302 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
A. L. HELMCAMP, INC.
FNH CONSTRUCTION, LLC
ED BELL CONSTRUCTION COMPANY
PREPARING ROW
STA 256.800 $1,100.000 $3,000.000 $3,500.000 $300.000
REMOVING CONC (DRIVEWAYS)
SY 907.000 $15.000 $25.000 $20.000 $34.400
REMOVING CONCRETE(MOW STRIP)
LF 450.000 $15.000 $15.000 $50.000 $13.700
REMOVING STAB BASE & ASPH PAV (0-6")
SY 5,176.000 $7.000 $7.000 $20.000 $9.450
REMOVING STAB BASE & ASPH PAV(26"-32")
SY 667.000 $14.500 $24.000 $50.000 $11.550
EXCAVATION (ROADWAY)
CY 160.500 $15.000 $50.000 $20.000 $45.290
SUBGRADE WIDENING (ORD COMP)
STA 250.000 $200.000 $230.000 $250.000 $2,104.160
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 20,466.500 $12.000 $18.000 $35.000 $51.040
BACKFILL (TY A OR B)
STA 256.800 $160.000 $210.000 $250.000 $49.550
ROAD GRADER WORK (ORD COMP)
STA 256.800 $160.000 $150.000 $250.000 $111.110
COMPOST MANUF TOPSOIL (4")
SY 177,540.000 $0.900 $0.800 $5.000 $0.750
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 177,540.000 $0.170 $0.140 $0.500 $0.200
DRILL SEED (TEMP)(WARM OR COOL)
SY 53,266.000 $0.150 $0.120 $0.500 $0.140
VEGETATIVE WATERING
MG 34,341.000 $0.450 $0.100 $10.000 $1.000
FL BS (CMP IN PLC)(TY D GR1-2)(12")
SY 59,279.000 $29.000 $32.000 $25.000 $71.330
PRIME COAT(MC-30 OR AE-P)
GAL 11,857.000 $4.300 $6.500 $8.000 $5.320
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 6,850.000 $75.000 $66.000 $85.000 $60.610
PLAN & TEXT ASPH CONC PAV(0" TO 2")
SY 69,993.000 $1.750 $2.000 $5.000 $2.660
TEMPORARY SPL SHORING
SF 3,618.000 $45.000 $54.000 $55.000 $74.790
RIPRAP (CONC)(4 IN)
CY 40.000 $550.000 $690.000 $500.000 $734.670
RIPRAP (CONC)(5 IN)
CY 6.200 $200.000 $800.000 $650.000 $815.220
RIPRAP (STONE COMMON)(DRY)(18 IN)
CY 491.000 $600.000 $240.000 $185.000 $204.820
RIPRAP (MOW STRIP)(4 IN)
CY 32.000 $550.000 $800.000 $550.000 $815.220
CONC BOX CULV (3 FT X 2 FT)
LF 235.000 $740.000 $640.000 $450.000 $640.000
CONC BOX CULV (4 FT X 3 FT)
LF 27.000 $780.000 $690.000 $550.000 $860.000
CONC BOX CULV (4 FT X 4 FT)
LF 85.000 $820.000 $800.000 $650.000 $880.000
CONC BOX CULV (5 FT X 4 FT)
LF 32.000 $900.000 $900.000 $600.000 $1,080.000
CONC BOX CULV (6 FT X 6 FT)
LF 39.000 $850.000 $960.000 $700.000 $1,785.000
CONC BOX CULV (6 FT X 2 FT)
LF 21.000 $10,000.000 $820.000 $600.000 $1,240.000
RC PIPE (CL III)(18 IN)
LF 576.000 $60.000 $60.000 $85.000 $173.440
RC PIPE (CL III)(24 IN)
LF 272.000 $70.000 $133.000 $105.000 $192.550
RC PIPE (CL III)(30 IN)
LF 48.000 $110.000 $210.000 $125.000 $203.770
RC PIPE (CL IV)(18 IN)
LF 260.000 $100.000 $69.000 $105.000 $178.160
WINGWALL (FW - S) (HW=3 FT)
EA 2.000 $15,000.000 $4,800.000 $12,500.000 $9,000.000
WINGWALL (FW - S) (HW=5 FT)
EA 2.000 $53,000.000 $9,600.000 $15,000.000 $17,850.000
WINGWALL (PW - 1) (HW=11 FT)
EA 1.000 $55,000.000 $72,000.000 $30,000.000 $73,500.000
WINGWALL (PW - 1) (HW=12 FT)
EA 1.000 $15,000.000 $87,000.000 $50,000.000 $84,000.000
WINGWALL (PW - 2) (HW=4 FT)
EA 14.000 $20,000.000 $9,000.000 $11,500.000 $12,000.000
WINGWALL (PW - 2) (HW=5 FT)
EA 3.000 $22,000.000 $11,000.000 $13,500.000 $15,000.000
WINGWALL (PW - 2) (HW=6 FT)
EA 4.000 $1,600.000 $14,000.000 $18,500.000 $18,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 39.000 $750.000 $1,000.000 $1,850.000 $1,155.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 16.000 $1,300.000 $1,300.000 $2,250.000 $1,575.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 2.000 $2,800.000 $3,200.000 $3,200.000 $3,150.000
CLEAN EXIST CULVERTS
EA 14.000 $1,100.000 $2,200.000 $2,500.000 $3,500.000
REMOV STR (BOX CULVERT)
EA 3.000 $2,500.000 $8,000.000 $1,500.000 $5,000.000
REMOV STR (SET)
EA 18.000 $110.000 $800.000 $500.000 $300.000
REMOV STR (WINGWALL)
EA 35.000 $1,100.000 $1,600.000 $2,500.000 $3,000.000
REMOV STR (PIPE)
EA 26.000 $400.000 $1,300.000 $500.000 $200.000
MOBILIZATION
LS 1.000 $1,029,738.920 $975,000.000 $1,200,000.000 $1,633,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 18.000 $15,000.000 $14,000.000 $8,500.000 $31,500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 240.000 $38.000 $32.000 $30.000 $53.170
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 230.000 $65.000 $54.000 $30.000 $69.110
ROCK FILTER DAMS (REMOVE)
LF 470.000 $10.000 $10.000 $15.000 $34.560
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 328.000 $25.000 $5.000 $40.000 $26.580
CONSTRUCTION EXITS (REMOVE)
SY 328.000 $10.000 $1.000 $20.000 $13.290
TEMP SEDMT CONT FENCE (INSTALL)
LF 18,420.000 $3.000 $3.250 $4.000 $2.660
TEMP SEDMT CONT FENCE (REMOVE)
LF 18,420.000 $0.350 $0.150 $2.000 $0.530
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 6,300.000 $6.000 $4.800 $18.000 $12.760
BIODEG EROSN CONT LOGS (REMOVE)
LF 6,300.000 $1.000 $0.800 $9.000 $1.060
DRIVEWAYS (ACP)
SY 4,006.000 $60.000 $60.000 $42.000 $73.230
DRIVEWAYS (CONC) (HES)
SY 708.000 $115.000 $160.000 $150.000 $143.440
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 49,465.000 $0.150 $0.180 $0.500 $0.150
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 24,271.000 $0.150 $0.180 $0.500 $0.150
MTL W-BEAM GD FEN (TIM POST)
LF 450.000 $22.000 $21.000 $40.000 $31.900
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $1,820.000 $1,900.000 $1,850.000 $4,238.660
REMOVE METAL BEAM GUARD FENCE
LF 525.000 $2.800 $2.200 $3.000 $10.630
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 2.000 $200.000 $215.000 $500.000 $797.480
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $3,200.000 $2,900.000 $3,500.000 $3,721.550
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $250.000 $240.000 $1,500.000 $372.160
WIRE FENCE (TY A)
LF 145.000 $80.000 $25.000 $5.000 $53.170
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 11.000 $650.000 $280.000 $850.000 $265.830
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 36.000 $650.000 $730.000 $850.000 $797.480
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 6.000 $760.000 $840.000 $850.000 $850.640
IN SM RD SN SUP&AM TY10BWG(1)SA(T-2EXT)
EA 1.000 $1,100.000 $950.000 $1,500.000 $1,169.630
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 3.000 $1,100.000 $950.000 $850.000 $903.810
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 2.000 $1,100.000 $970.000 $850.000 $956.970
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 4.000 $1,300.000 $1,100.000 $1,500.000 $1,063.300
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 5.000 $1,300.000 $1,100.000 $850.000 $1,169.630
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
EA 1.000 $1,800.000 $2,500.000 $1,500.000 $1,435.460
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 7.000 $25.000 $27.000 $100.000 $53.170
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
EA 51.000 $125.000 $80.000 $100.000 $212.660
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,284.000 $1.500 $2.500 $5.000 $6.120
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 170.000 $5.200 $8.000 $20.000 $7.440
REFL PAV MRK TY II (W) 4" (SLD)
LF 50,265.000 $0.160 $0.200 $0.500 $0.270
REFL PAV MRK TY II (Y) 4" (SLD)
LF 61,559.000 $0.160 $0.200 $0.500 $0.270
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 48,523.000 $0.580 $0.500 $0.500 $0.580
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 1,742.000 $0.750 $0.720 $6.000 $1.060
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 6,009.000 $0.580 $0.600 $0.500 $0.580
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 7,008.000 $0.580 $0.520 $0.500 $0.580
REFL PAV MRKR TY II-A-A
EA 385.000 $5.250 $5.000 $5.000 $4.250
FULL - WIDTH MOWING
CYC 3.000 $3,500.000 $3,000.000 $3,000.000 $9,000.000
SP MIXES SP-B PG64-22
TON 12,223.000 $130.000 $120.000 $100.000 $138.360
SP MIXES SP-C PG64-22
TON 6,112.000 $135.000 $120.000 $110.000 $139.420
SP MIXES SP-C SAC-B PG70-22
TON 13,811.000 $140.000 $125.000 $120.000 $153.240
TACK COAT
GAL 14,366.000 $4.000 $4.000 $6.000 $4.520
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $15,000.000 $13,000.000 $16,500.000 $10,000.000
TMA (STATIONARY)
DAY 302.000 $250.000 $150.000 $250.000 $105.000
TMA (MOBILE OPERATION)
DAY 60.000 $200.000 $50.000 $550.000 $525.000
Totals: $11,623,858.110 $11,469,432.700 $13,183,216.500 $16,499,570.317