Bid Cobra

KAUFMAN IH 20 (0095-14-029)

Items: 105

County: KAUFMAN
Length: N/A
Highway: IH 20
District: DALLAS
Control Number: 0095-14-029
DBE Goal: N/A
Project: NH 2019(928)
Guaranty: N/A
Time: 201 WORKING DAYS
Engineer's Estimate: $16,456,438.85
Date: 05/07/2019 (7 years ago)
Contract Number: N/A
Type: BRDG DECK REPL,RUBBLIZE,OVERLAY,PAV RPR, PAV MRK
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (1)
E
Engineer's Estimate
$16,456,438.85
$22,030,032.93
Over/Under Est: 33.87% $5,573,594.08

Bid Items & Bid Tabulations

105 Total 0 of 105
KAUFMAN  |  IH 20  |  DALLAS  |  0095-14-029  |  05/07/2019  |  $16,456,438.85  |  NH 2019(928)  |  BRDG DECK REPL,RUBBLIZE,OVERLAY,PAV...  |  201 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TEXAS MATERIALS GROUP, INC.
REMOVING CONCRETE(MOW STRIP)
LF 5,385.000 $3.000 $7.000
BACKFILL (TY A OR B)
STA 719.210 $150.000 $331.000
BLADING
STA 719.210 $50.000 $76.000
COMPOST MANUF TOPSOIL (4")
SY 47,947.000 $0.850 $0.900
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 47,947.000 $0.120 $0.130
VEGETATIVE WATERING
MG 4,160.000 $12.000 $0.010
FL BS (CMP IN PLC)(TY D GR1-2)(12")
SY 1,412.000 $20.000 $45.000
SUPERPAVE MIXTURES SP-B PG64-22
TON 800.000 $73.000 $115.000
STONE-MTRX-ASPH SMA-C SAC-A PG76-22
TON 27,212.030 $95.000 $130.000
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
TON 41,264.720 $95.000 $130.000
FLEX PAVEMENT STRUCTURE REPAIR (8"-12")
SY 2,200.000 $75.000 $110.000
PLAN & TEXT ASPH CONC PAV(10" TO 12")
SY 7,649.000 $2.000 $5.100
PLAN & TEXT ASPH CONC PAV(0" TO 6")
SY 92,038.000 $1.800 $2.650
PLAN & TEXT CONC PAV(0" TO 2")
SY 27,809.000 $5.200 $1.600
FULL - DEPTH REPAIR CPCD (12")
SY 800.000 $155.000 $320.000
FULL - DEPTH REPAIR CPCD (13")
SY 2,800.000 $170.000 $330.000
REINF CONC SLAB (HPC)
SF 33,191.000 $19.500 $29.000
APPROACH SLAB (HPC)
CY 427.000 $550.000 $525.000
RIPRAP (MOW STRIP)(4 IN)
CY 1,193.000 $460.000 $500.000
RAIL (TY SSTR)(HPC)
LF 1,126.700 $70.000 $150.000
RETROFIT RAIL (TY SSTR)(HPC)
LF 144.000 $250.000 $200.000
RETROFIT RAIL (TY 501)
LF 13.000 $250.000 $200.000
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
LF 262.000 $100.000 $165.000
REMOV STR (BRIDGE SLAB)
EA 2.000 $150,000.000 $164,000.000
REMOV STR (APPROACH SLAB)
EA 12.000 $15,000.000 $2,000.000
MOBILIZATION
LS 1.000 $1,550,000.000 $2,199,645.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $23,000.000 $39,900.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 468.000 $20.000 $25.000
CONSTRUCTION EXITS (REMOVE)
SY 468.000 $7.000 $8.250
TEMP SEDMT CONT FENCE (INSTALL)
LF 5,364.000 $2.500 $2.650
TEMP SEDMT CONT FENCE (REMOVE)
LF 5,364.000 $0.500 $0.550
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 2,750.000 $4.000 $5.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 2,750.000 $1.000 $1.050
CONSTRUCTING DETOURS
SY 233.000 $80.000 $150.000
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 1,260.000 $30.000 $55.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 1,620.000 $5.000 $11.000
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 1,260.000 $8.000 $15.550
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 47,265.000 $0.120 $0.160
RUMBLE STRIPS (SHOULDER) CONCRETE
LF 400.000 $1.500 $24.000
MTL W-BEAM GD FEN (TIM POST)
LF 4,470.000 $18.000 $20.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 20.000 $1,725.000 $1,500.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 8.000 $1,450.000 $1,100.000
REMOVE METAL BEAM GUARD FENCE
LF 3,975.000 $2.750 $3.050
REMOVE TERMINAL ANCHOR SECTION
EA 6.000 $260.000 $115.000
CABLE BARRIER SYSTEM (TL-4)
LF 21,480.000 $11.000 $12.350
CABLE BARRIER TERMINAL SECTION (TL-4)
EA 10.000 $2,350.000 $3,000.000
GUARDRAIL END TREATMENT (INSTALL)
EA 26.000 $2,500.000 $2,800.000
GUARDRAIL END TREATMENT (REMOVE)
EA 27.000 $240.000 $275.000
CRASH CUSH ATTEN (INSTL)
EA 2.000 $12,000.000 $8,500.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 3.000 $12,000.000 $1,650.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $800.000 $1,650.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 7.000 $600.000 $685.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 4.000 $2,250.000 $2,100.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
EA 2.000 $2,000.000 $2,150.000
REMOVE SM RD SN SUP&AM
EA 7.000 $80.000 $80.000
REMOVE BRDG MNT CLEARANCE SIGN ASSM
EA 6.000 $500.000 $550.000
RELOCATE LRSS (SIGN ONLY)
EA 2.000 $900.000 $1,600.000
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
EA 197.000 $70.000 $54.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 43.000 $25.000 $30.000
INSTL DEL ASSM (D-SY)SZ 1(FLX)GND
EA 31.000 $70.000 $54.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 43.000 $19.000 $30.000
INSTL DEL ASSM (D-DW)SZ 1(FLX)GND
EA 104.000 $70.000 $54.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 59.000 $27.000 $36.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 48.000 $23.000 $36.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 78,957.000 $0.290 $0.420
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 78,925.000 $0.310 $0.420
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 4,016.000 $0.900 $1.050
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 285.000 $1.800 $4.200
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 4,045.000 $0.900 $1.050
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 2,220.000 $0.730 $1.040
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 240.000 $1.500 $1.550
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 25,526.000 $1.100 $0.780
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 1,775.000 $4.200 $3.300
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 78.000 $6.000 $6.450
PAVEMENT SEALER 4"
LF 5,480.000 $0.150 $0.260
PAVEMENT SEALER 6"
LF 2,760.000 $0.200 $0.380
PAVEMENT SEALER 8"
LF 835.000 $0.600 $0.520
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 86,984.000 $0.320 $0.480
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 22,200.000 $0.480 $0.680
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 86,475.000 $0.320 $0.490
REFL PAV MRK TY I (W)12"(DOT)(100MIL)
LF 60.000 $2.000 $5.450
REFL PAV MRKR TY II-A-A
EA 22.000 $4.500 $6.450
REFL PAV MRKR TY II-C-R
EA 895.000 $3.000 $4.300
ELIM EXT PAV MRK & MRKS (4")
LF 44,219.000 $0.400 $0.540
ELIM EXT PAV MRK & MRKS (8")
LF 835.000 $0.750 $1.050
PAV SURF PREP FOR MRK (4")
LF 5,480.000 $0.100 $0.260
PAV SURF PREP FOR MRK (6")
LF 2,760.000 $0.100 $0.260
PAV SURF PREP FOR MRK (8")
LF 835.000 $0.200 $0.260
LITTER REMOVAL
CYC 4.000 $2,500.000 $1,200.000
DEBRIS REMOVAL (CNTR MEDIANS/MAINLANES)
CYC 36.000 $2,300.000 $1,200.000
CLEANING / SWEEPING (CENTER MEDIAN)
CYC 6.000 $2,000.000 $1,700.000
POST AND CABLE FENCE (REMOVAL)
LF 21,480.000 $4.000 $3.100
POST AND CABLE FENCE (REMV CONC ANCHOR)
EA 10.000 $1,300.000 $545.000
BRIDGE JOINT REPAIR (ARMOR)
LF 324.000 $350.000 $160.000
NO. OF DAYS MILESTONE 1
$/D 8,000.000 $56.000 $56.000
NO. OF DAYS MILESTONE 2
$/D 8,000.000 $56.000 $56.000
CAM (ASPHALT) PG(76-22)
TON 1,375.480 $98.000 $165.000
CAM (AGGREGATE)
TON 17,194.330 $98.000 $165.000
MEMBRANE UNDERSEAL
GAL 33,450.000 $2.500 $2.000
RUBBILIZING EXISTING CONCRETE PAVEMENT
SY 132,991.110 $2.500 $2.890
PORTABLE CHANGEABLE MESSAGE SIGN
EA 6.000 $13,000.000 $12,000.000
TMA (STATIONARY)
EA 6.000 $14,000.000 $0.100
TMA (MOBILE OPERATION)
HR 96.000 $65.000 $55.000
TEMP Q-DETECT SYS
EA 1.000 $100,000.000 $75,000.000
TEMP Q-DETECT SYS (RELOCATE)
EA 2.000 $15,000.000 $1,500.000
Totals: $16,456,438.855 $22,030,032.938