Show Job Controls
Bid Cobra

KAUFMAN US 80 (0095-04-072)

Items: 51

County: KAUFMAN
Length: N/A
Highway: US 80
District: DALLAS
Control Number: 0095-04-072
DBE Goal: N/A
Project: F 2022(483)
Guaranty: N/A
Time: 320 WORKING DAYS
Engineer's Estimate: $2,258,908.36
Date: 05/04/2022 (4 years ago)
Contract Number: N/A
Type: INSTALL/REPLACE SIGNS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (3)
E
Engineer's Estimate
$2,258,908.36
$2,575,586.67
Over/Under Est: 14.02% $316,678.31
Over/Under Est: 21.92% $495,115.86
Amt Left: 6.93% $178,437.55
Over/Under Est: 48.48% $1,095,014.89
Amt Left: 30.22% $778,336.58
Delta: -21.78% -$599,899.03

Bid Items & Bid Tabulations

51 Total 0 of 51
KAUFMAN  |  US 80  |  DALLAS  |  0095-04-072  |  05/04/2022  |  $2,258,908.36  |  F 2022(483)  |  INSTL/REPLACE SIGNS  |  320 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
MICA CORPORATION
CREATIVE DESIGN CONCEPTS, INC.
HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, INC.
REMOVING CONC (FOUNDATIONS)
CY 3.300 $200.000 $880.000 $1,000.000 $1,264.000
DRILL SHAFT (SIGN MTS) (24 IN)
LF 91.000 $280.000 $202.000 $125.000 $232.750
DRILL SHAFT (SIGN MTS) (48 IN)
LF 33.000 $425.000 $741.000 $500.000 $613.000
RIPRAP (MOW STRIP)(4 IN)
CY 13.700 $400.000 $990.000 $750.000 $850.750
MOBILIZATION
LS 1.000 $129,078.330 $150,500.000 $118,000.000 $331,727.760
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 16.000 $8,500.000 $15,855.000 $7,750.000 $12,243.600
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 720.000 $4.000 $11.250 $1.000 $9.150
BIODEG EROSN CONT LOGS (REMOVE)
LF 720.000 $1.000 $5.750 $1.000 $3.950
MTL W-BEAM GD FEN (STEEL POST)
LF 175.000 $25.000 $37.100 $42.000 $169.100
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,550.000 $1,410.000 $1,758.000 $4,778.000
GUARDRAIL END TREATMENT (INSTALL)
EA 1.000 $2,650.000 $3,680.000 $3,407.000 $7,058.000
ALUMINUM SIGNS (TY G)
SF 1,468.500 $27.500 $28.750 $30.000 $40.030
ALUMINUM SIGNS (TY O)
SF 352.250 $25.500 $30.350 $34.000 $41.770
REPLACE EXISTING ALUMINUM SIGNS(TY A)
SF 678.600 $25.000 $35.350 $24.000 $43.240
REPLACE EXISTING ALUMINUM SIGNS(TY G)
SF 2,030.250 $31.000 $26.800 $36.000 $47.930
REPLACE EXISTING ALUMINUM SIGNS(TY O)
SF 30,944.240 $38.230 $35.600 $45.750 $49.670
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 4.000 $535.000 $699.000 $700.000 $856.480
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 25.000 $704.000 $893.000 $1,000.000 $1,058.460
IN SM RD SN SUP&AM TY10BWG(1)SA(T-2EXT)
EA 4.000 $830.000 $1,099.000 $1,250.000 $1,227.790
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 7.000 $780.000 $1,070.000 $1,300.000 $1,241.910
IN SM RD SN SUP&AM TY10BWG(1)SB(T)
EA 2.000 $730.000 $977.000 $1,100.000 $1,078.360
IN SM RD SN SUP&AM TY10BWG(2)SA(P-EXAL)
EA 14.000 $1,200.000 $2,203.000 $2,200.000 $1,897.400
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 24.000 $636.000 $535.000 $700.000 $978.660
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 4.000 $990.000 $1,370.000 $1,700.000 $1,491.890
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 22.000 $1,125.000 $1,600.000 $2,200.000 $1,735.200
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
EA 33.000 $1,810.000 $2,988.000 $3,300.000 $2,539.100
IN SM RD SN SUP&AM TYS80(2)SB(P-EXAL)
EA 35.000 $1,100.000 $3,164.000 $3,300.000 $2,509.940
REMOVE SM RD SN SUP&AM
EA 144.000 $145.000 $206.250 $100.000 $474.000
INSTALL LRSS (STRUCT STEEL)
LB 6,639.000 $6.000 $6.770 $10.000 $10.820
REMOVE LRSA
EA 23.000 $750.000 $774.000 $500.000 $1,580.000
INS OH SN SUP(35 FT CANT)
EA 1.000 $25,900.000 $29,330.000 $110,000.000 $34,711.000
INS OH SN SUP(40 FT CANT)
EA 1.000 $62,000.000 $31,555.000 $112,000.000 $36,953.230
REMOVE SIGN WALKWAY
EA 37.000 $1,250.000 $1,405.000 $500.000 $1,580.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 3.000 $25.000 $56.100 $31.000 $50.130
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 1,419.000 $1.130 $6.550 $2.920 $1.600
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,675.000 $0.950 $1.980 $1.730 $1.600
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 240.000 $7.150 $23.100 $10.500 $8.780
REFL PAV MRK TY II (W) (ARROW)
EA 6.000 $60.000 $385.000 $99.750 $113.700
REFL PAV MRK TY II (W) (WORD)
EA 6.000 $62.000 $388.000 $131.250 $143.700
REFL PAV MRK TY II (Y) 4" (SLD)
LF 44,520.000 $0.200 $0.620 $0.380 $0.440
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 44,520.000 $0.460 $1.050 $1.050 $1.140
REFL PAV MRKR TY I-C
EA 86.000 $4.000 $14.850 $8.400 $5.590
REFL PAV MRKR TY II-A-A
EA 589.000 $3.750 $14.850 $8.400 $5.590
PAV SURF PREP FOR MRK (4")
LF 59,796.000 $0.150 $0.010 $0.260 $0.140
PAV SURF PREP FOR MRK (6")
LF 28,251.000 $0.130 $0.020 $0.370 $0.200
PAV SURF PREP FOR MRK (8")
LF 17,944.000 $0.290 $0.070 $0.470 $0.260
PAV SURF PREP FOR MRK (24")
LF 240.000 $1.160 $0.490 $2.100 $3.190
PAV SURF PREP FOR MRK (ARROW)
EA 6.000 $30.000 $11.920 $47.250 $67.900
PAV SURF PREP FOR MRK (WORD)
EA 6.000 $68.000 $14.120 $57.750 $67.900
TMA (STATIONARY)
DAY 348.200 $95.000 $154.700 $10.000 $260.000
LEAD LED CHEVRON
EA 24.000 $5,550.000 $6,395.000 $3,000.000 $7,056.250
Totals: $2,258,908.360 $2,575,586.686 $2,754,024.220 $3,353,923.270