KAUFMAN US 80 (0095-03-093)

Items: 69

County: KAUFMAN
Length: N/A
Highway: US 80
District: DALLAS
Control Number: 0095-03-093
DBE Goal: N/A
Project: C 95-3-93
Guaranty: N/A
Time: 170 WORKING DAYS
Engineer's Estimate: $9,842,840.31
Date: 06/05/2018 (8 years ago)
Contract Number: N/A
Type: BASE REPAIR AND OVERLAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (6)
E
Engineer's Estimate
$9,842,840.31
$11,461,243.20
Over/Under Est: 16.44% $1,618,402.89
Over/Under Est: 16.8% $1,653,259.07
Amt Left: 0.3% $34,856.18
Over/Under Est: 22.5% $2,214,457.10
Amt Left: 5.2% $596,054.21
Delta: -4.88% -$561,198.03
$12,294,652.06
Over/Under Est: 24.91% $2,451,811.75
Amt Left: 7.27% $833,408.86
Delta: -1.97% -$237,354.65
$12,510,962.78
Over/Under Est: 27.11% $2,668,122.47
Amt Left: 9.16% $1,049,719.58
Delta: -1.76% -$216,310.72
Over/Under Est: 37.89% $3,729,593.38
Amt Left: 18.42% $2,111,190.49
Delta: -8.48% -$1,061,470.91

Bid Items & Bid Tabulations

69 Total 0 of 69
KAUFMAN  |  US 80  |  DALLAS  |  0095-03-093  |  06/05/2018  |  $9,842,840.31  |  C 95-3-93  |  BASE REPAIR AND OVERLAY  |  170 WORKING DAYS
Alt
Item Code
Description
Unit
Quantity
Engineer's Estimate
OLDCASTLE MATERIALS TEXAS, INC.
JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY
AUSTIN BRIDGE & ROAD SERVICES, LP
RK HALL, LLC
A. L. HELMCAMP, INC.
PEACHTREE CONSTRUCTION, LTD.
PREPARING ROW
STA 123.520 $450.000 $1,000.000 $1,550.000 $600.000 $220.000 $250.000 $1,350.000
REMOVING CONC (DRIVEWAYS)
SY 381.000 $10.000 $16.000 $15.000 $20.390 $44.000 $30.000 $23.000
EXCAVATION (ROADWAY)
CY 58.000 $5.250 $50.000 $18.000 $70.110 $100.000 $30.000 $27.000
SUBGRADE WIDENING (ORD COMP)
STA 50.350 $250.000 $255.000 $150.000 $1,110.900 $590.000 $550.000 $750.000
EMBANKMENT (FINAL) (DENS CONT) (TY C1)
CY 717.000 $8.000 $16.000 $8.000 $46.950 $32.000 $33.000 $27.000
BACKFILL (TY A OR B)
STA 1,335.940 $210.000 $155.000 $95.000 $137.950 $180.000 $75.000 $240.000
ROAD GRADER WORK (ORD COMP)
STA 119.540 $200.000 $0.011 $350.000 $245.450 $340.000 $175.000 $800.000
DRILL SEEDING (PERM) (URBAN) (CLAY)
SY 26,562.000 $0.100 $0.100 $0.120 $0.300 $0.130 $0.200 $0.270
DRILL SEED (TEMP)(WARM OR COOL)
SY 6,641.000 $0.100 $0.230 $0.280 $0.500 $0.160 $0.180 $0.480
VEGETATIVE WATERING
MG 2,882.000 $1.000 $0.010 $18.000 $1.000 $20.000 $7.000 $25.000
FL BS (CMP IN PLC)(TY D GR 1-2) (6")
SY 23,567.000 $7.800 $9.000 $12.000 $10.500 $12.000 $11.000 $13.600
FL BS (CMP IN PLACE) (TY D GR 1-2)(10")
SY 1,843.000 $12.000 $15.000 $16.000 $18.300 $21.000 $19.000 $27.000
REWORK BS MTL (TY A) (6") (ORD COMP)
STA 66.260 $1.600 $370.000 $155.000 $674.900 $825.000 $800.000 $440.000
CEMENT
TON 80.000 $124.000 $133.000 $180.000 $150.000 $140.000 $210.000 $210.000
CEMENT TREAT (EXIST MATL) (5")
SY 18,416.000 $1.900 $1.650 $1.350 $1.650 $2.850 $3.400 $3.200
SALV,HAUL& STKPL RCL APH PV(VAR DEPTH)
SY 1,843.000 $3.500 $5.050 $5.000 $8.550 $5.300 $20.000 $5.500
EMULS ASPH (BS OR SUBGR TRT)(MS-2)
GAL 5,170.000 $2.500 $5.500 $3.700 $13.050 $6.200 $4.500 $4.000
ASPH (CRS-2P)
GAL 4,630.000 $3.500 $3.480 $2.500 $7.000 $3.600 $3.000 $3.620
ASPH (RC-250)
GAL 1,871.000 $3.800 $3.480 $3.400 $8.000 $5.200 $3.000 $4.060
AGGR (TY-B GR-5 OR TY-L GR-5)
CY 53.000 $80.000 $149.000 $100.000 $400.000 $235.000 $100.000 $620.000
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
GAL 3,889.000 $3.000 $3.520 $2.500 $7.500 $3.900 $4.000 $3.920
AGGR (TY-B GR-3 OR TY-L GR-3)(SAC-B)
CY 179.000 $60.000 $135.000 $100.000 $375.000 $215.000 $100.000 $230.000
SUPERPAVE MIXTURES SP-C PG64-22
TON 4,388.000 $77.000 $75.000 $80.000 $77.500 $89.340 $85.000 $82.000
SUPERPAVE MIXTURES SP-B SAC-B PG64-22
TON 2,720.000 $64.000 $72.000 $78.000 $72.000 $83.670 $76.000 $92.000
STONE-MTRX-ASPH SMA-C SAC-A PG76-22
TON 61,598.300 $100.000 $107.760 $112.000 $105.000 $115.960 $133.000 $120.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
SY 1,725.000 $60.000 $68.000 $48.000 $72.000 $95.350 $80.000 $85.000
PLANE ASPH CONC PAV(0" TO 2")
SY 513,270.000 $1.290 $1.820 $1.500 $2.250 $1.900 $1.200 $2.100
FULL - DEPTH REPAIR CPCD (10")
SY 300.000 $175.000 $400.000 $225.000 $380.000 $402.800 $250.000 $420.000
RC PIPE (CL III)(18 IN)
LF 180.000 $35.000 $52.000 $58.000 $60.000 $53.000 $60.000 $105.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 8.000 $525.000 $900.000 $968.000 $750.000 $954.000 $1,000.000 $850.000
REMOV STR (SET)
EA 6.000 $270.000 $255.000 $490.000 $450.000 $265.000 $900.000 $450.000
REMOV STR (PIPE)
LF 142.000 $10.000 $6.000 $20.000 $30.000 $5.300 $39.000 $26.000
MOBILIZATION
LS 1.000 $405,000.000 $700,307.000 $650,000.000 $980,526.000 $672,000.000 $550,000.000 $750,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $10,500.000 $19,200.000 $8,500.000 $15,000.000 $2,500.000 $10,000.000 $10,000.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 240.000 $28.000 $20.000 $24.000 $18.500 $22.260 $40.000 $20.000
ROCK FILTER DAMS (REMOVE)
LF 240.000 $6.000 $12.000 $6.000 $6.000 $7.420 $5.000 $6.500
TEMP SEDMT CONT FENCE (INSTALL)
LF 10,565.000 $1.900 $1.900 $2.000 $2.000 $1.700 $3.500 $2.200
TEMP SEDMT CONT FENCE (REMOVE)
LF 10,565.000 $0.500 $0.500 $0.600 $0.350 $0.480 $1.000 $0.370
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 120.000 $5.600 $5.000 $6.000 $6.000 $4.510 $10.000 $6.500
BIODEG EROSN CONT LOGS (REMOVE)
LF 120.000 $0.500 $1.000 $1.250 $3.000 $0.800 $4.000 $3.200
DRIVEWAYS (ACP)
SY 283.000 $35.000 $48.000 $35.000 $60.100 $34.710 $69.000 $58.000
DRIVEWAYS (CONC) (HES)
SY 459.000 $85.000 $135.000 $95.000 $135.700 $159.000 $110.000 $130.000
RUMBLE STRIPS (SHOULDER)
LF 209,105.000 $0.160 $0.100 $0.200 $0.100 $0.120 $0.150 $0.180
MTL W-BEAM GD FEN (TIM POST)
LF 12,875.000 $18.700 $20.000 $19.910 $22.000 $17.490 $19.000 $24.500
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 32.000 $1,385.000 $1,500.000 $1,459.740 $1,521.000 $1,282.600 $1,400.000 $1,700.000
MTL BEAM GD FEN TRANS (T101)
EA 38.000 $950.000 $810.000 $1,085.760 $1,230.000 $954.000 $1,000.000 $1,350.000
REMOVE METAL BEAM GUARD FENCE
LF 11,350.000 $2.800 $2.850 $3.620 $3.700 $3.180 $4.000 $4.100
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 22.000 $258.000 $180.000 $361.920 $220.000 $318.000 $350.000 $240.000
RM MTL BM GD FEN TRANS (T101)
EA 27.000 $125.000 $180.000 $361.920 $220.000 $318.000 $350.000 $240.000
GUARDRAIL END TREATMENT (INSTALL)
EA 105.000 $1,385.000 $2,600.000 $3,076.320 $2,225.000 $2,703.000 $3,000.000 $2,480.000
GUARDRAIL END TREATMENT (REMOVE)
EA 94.000 $300.000 $330.000 $482.560 $220.000 $424.000 $450.000 $240.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 2.000 $200.000 $490.000 $361.920 $500.000 $318.000 $340.000 $525.000
INSTL OM ASSM (OM-3L)(FLX)GND
EA 41.000 $175.000 $280.000 $60.320 $350.000 $53.000 $56.000 $300.000
INSTL OM ASSM (OM-3R)(FLX)GND
EA 53.000 $175.000 $280.000 $60.320 $350.000 $53.000 $56.000 $300.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 232.000 $30.000 $40.000 $60.320 $45.000 $53.000 $56.000 $42.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 8,542.000 $0.700 $1.020 $1.030 $0.800 $1.120 $0.600 $2.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 102.000 $4.800 $14.200 $16.890 $5.500 $6.040 $6.000 $15.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 4.000 $110.000 $155.000 $180.960 $140.000 $106.000 $106.000 $160.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 8.000 $140.000 $165.000 $193.020 $220.000 $106.000 $106.000 $170.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 29,160.000 $0.340 $0.400 $0.480 $0.450 $0.450 $0.450 $0.450
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 137,393.000 $0.570 $0.350 $0.420 $0.600 $0.530 $0.530 $0.370
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 14,815.000 $0.550 $0.850 $1.030 $0.550 $0.450 $0.450 $0.900
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 134,682.000 $0.290 $0.420 $0.510 $0.450 $0.320 $0.320 $0.460
REFL PAV MRKR TY II-C-R
EA 1,557.000 $3.200 $5.000 $6.030 $4.000 $3.710 $3.710 $5.500
FULL - WIDTH MOWING
CYC 6.000 $1,500.000 $1,200.000 $750.000 $2,254.000 $1,272.000 $2,500.000 $2,600.000
TRACKLESS TACK COAT
GAL 99,553.000 $3.350 $3.600 $3.530 $0.000 $4.300 $3.000 $7.350
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $9,500.000 $10,500.000 $5,000.000 $22,000.000 $5,466.340 $6,000.000 $25,000.000
TMA (STATIONARY)
EA 2.000 $12,000.000 $26,300.000 $5,000.000 $41,500.000 $50,606.440 $20,000.000 $35,000.000
1
MEMBRANE UNDERSEAL
GAL 99,553.000 $2.450 $0.000 $0.000 $3.050 $0.000 $0.000 $0.000
Totals: $10,176,342.856 $11,461,243.213 $11,496,099.380 $12,057,297.425 $12,294,652.068 $12,510,962.780 $13,572,433.690