Job Info for 0095-03-093

County: KAUFMAN Highway: US 80 Date: 06/05/2018 (6 years ago) Engineer's Estimate: $9,842,840 Control Number: 0095-03-093
Project: C 95-3-93 District: DALLAS Time: 170 WORKING DAYS Type: BASE REPAIR AND OVERLAY

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $9,842,840.31
OLDCASTLE MATERIALS TEXAS, INC.   $11,461,243.20 1
16.44% | $1,618,402.89
JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY   $11,496,099.38 2
16.8% | $1,653,259.07
0.3% | $34,856.18
AUSTIN BRIDGE & ROAD SERVICES, LP   $12,057,297.41 3
22.5% | $2,214,457.10
5.2% | $596,054.21
4.88% | $561,198.03
RK HALL, LLC   $12,294,652.06 4
24.91% | $2,451,811.75
7.27% | $833,408.86
1.97% | $237,354.65
A. L. HELMCAMP, INC.   $12,510,962.78 5
27.11% | $2,668,122.47
9.16% | $1,049,719.58
1.76% | $216,310.72
PEACHTREE CONSTRUCTION, LTD.   $13,572,433.69 6
37.89% | $3,729,593.38
18.42% | $2,111,190.49
8.48% | $1,061,470.91

Bid Items

Items: 69, 0 filtered
KAUFMAN US 80  |  DALLAS  |  0095-03-093  |  06/05/2018  |  $9,842,840  |  C 95-3-93  |  BASE REPAIR AND OVERLAY  |  170 WORKING DAYS
Alt Item code Description Unit Quantity Engineer's Estimate OLDCASTLE MATERIALS TEXAS, INC. JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY AUSTIN BRIDGE & ROAD SERVICES, LP RK HALL, LLC A. L. HELMCAMP, INC. PEACHTREE CONSTRUCTION, LTD.
100 6002 PREPARING ROW STA 123.520 $450.000 $1,000.000 $1,550.000 $600.000 $220.000 $250.000 $1,350.000
104 6017 REMOVING CONC (DRIVEWAYS) SY 381.000 $10.000 $16.000 $15.000 $20.390 $44.000 $30.000 $23.000
110 6001 EXCAVATION (ROADWAY) CY 58.000 $5.250 $50.000 $18.000 $70.110 $100.000 $30.000 $27.000
112 6001 SUBGRADE WIDENING (ORD COMP) STA 50.350 $250.000 $255.000 $150.000 $1,110.900 $590.000 $550.000 $750.000
132 6025 EMBANKMENT (FINAL) (DENS CONT) (TY C1) CY 717.000 $8.000 $16.000 $8.000 $46.950 $32.000 $33.000 $27.000
134 6004 BACKFILL (TY A OR B) STA 1,335.940 $210.000 $155.000 $95.000 $137.950 $180.000 $75.000 $240.000
152 6001 ROAD GRADER WORK (ORD COMP) STA 119.540 $200.000 $0.011 $350.000 $245.450 $340.000 $175.000 $800.000
164 6039 DRILL SEEDING (PERM) (URBAN) (CLAY) SY 26,562.000 $0.100 $0.100 $0.120 $0.300 $0.130 $0.200 $0.270
164 6051 DRILL SEED (TEMP)(WARM OR COOL) SY 6,641.000 $0.100 $0.230 $0.280 $0.500 $0.160 $0.180 $0.480
168 6001 VEGETATIVE WATERING MG 2,882.000 $1.000 $0.010 $18.000 $1.000 $20.000 $7.000 $25.000
247 6073 FL BS (CMP IN PLC)(TY D GR 1-2) (6") SY 23,567.000 $7.800 $9.000 $12.000 $10.500 $12.000 $11.000 $13.600
247 6304 FL BS (CMP IN PLACE) (TY D GR 1-2)(10") SY 1,843.000 $12.000 $15.000 $16.000 $18.300 $21.000 $19.000 $27.000
251 6001 REWORK BS MTL (TY A) (6") (ORD COMP) STA 66.260 $1.600 $370.000 $155.000 $674.900 $825.000 $800.000 $440.000
275 6001 CEMENT TON 80.000 $124.000 $133.000 $180.000 $150.000 $140.000 $210.000 $210.000
275 6026 CEMENT TREAT (EXIST MATL) (5") SY 18,416.000 $1.900 $1.650 $1.350 $1.650 $2.850 $3.400 $3.200
305 6014 SALV,HAUL& STKPL RCL APH PV(VAR DEPTH) SY 1,843.000 $3.500 $5.050 $5.000 $8.550 $5.300 $20.000 $5.500
314 6006 EMULS ASPH (BS OR SUBGR TRT)(MS-2) GAL 5,170.000 $2.500 $5.500 $3.700 $13.050 $6.200 $4.500 $4.000
316 6024 ASPH (CRS-2P) GAL 4,630.000 $3.500 $3.480 $2.500 $7.000 $3.600 $3.000 $3.620
316 6029 ASPH (RC-250) GAL 1,871.000 $3.800 $3.480 $3.400 $8.000 $5.200 $3.000 $4.060
316 6403 AGGR (TY-B GR-5 OR TY-L GR-5) CY 53.000 $80.000 $149.000 $100.000 $400.000 $235.000 $100.000 $620.000
316 6419 ASPH (AC-15P, AC-20-5TR OR AC-20XP) GAL 3,889.000 $3.000 $3.520 $2.500 $7.500 $3.900 $4.000 $3.920
316 6440 AGGR (TY-B GR-3 OR TY-L GR-3)(SAC-B) CY 179.000 $60.000 $135.000 $100.000 $375.000 $215.000 $100.000 $230.000
344 6034 SUPERPAVE MIXTURES SP-C PG64-22 TON 4,388.000 $77.000 $75.000 $80.000 $77.500 $89.340 $85.000 $82.000
344 6167 SUPERPAVE MIXTURES SP-B SAC-B PG64-22 TON 2,720.000 $64.000 $72.000 $78.000 $72.000 $83.670 $76.000 $92.000
346 6002 STONE-MTRX-ASPH SMA-C SAC-A PG76-22 TON 61,598.300 $100.000 $107.760 $112.000 $105.000 $115.960 $133.000 $120.000
351 6008 FLEXIBLE PAVEMENT STRUCTURE REPAIR(12") SY 1,725.000 $60.000 $68.000 $48.000 $72.000 $95.350 $80.000 $85.000
354 6021 PLANE ASPH CONC PAV(0" TO 2") SY 513,270.000 $1.290 $1.820 $1.500 $2.250 $1.900 $1.200 $2.100
361 6035 FULL - DEPTH REPAIR CPCD (10") SY 300.000 $175.000 $400.000 $225.000 $380.000 $402.800 $250.000 $420.000
464 6003 RC PIPE (CL III)(18 IN) LF 180.000 $35.000 $52.000 $58.000 $60.000 $53.000 $60.000 $105.000
467 6363 SET (TY II) (18 IN) (RCP) (6: 1) (P) EA 8.000 $525.000 $900.000 $968.000 $750.000 $954.000 $1,000.000 $850.000
496 6004 REMOV STR (SET) EA 6.000 $270.000 $255.000 $490.000 $450.000 $265.000 $900.000 $450.000
496 6007 REMOV STR (PIPE) LF 142.000 $10.000 $6.000 $20.000 $30.000 $5.300 $39.000 $26.000
500 6001 MOBILIZATION LS 1.000 $405,000.000 $700,307.000 $650,000.000 $980,526.000 $672,000.000 $550,000.000 $750,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 10.000 $10,500.000 $19,200.000 $8,500.000 $15,000.000 $2,500.000 $10,000.000 $10,000.000
506 6001 ROCK FILTER DAMS (INSTALL) (TY 1) LF 240.000 $28.000 $20.000 $24.000 $18.500 $22.260 $40.000 $20.000
506 6011 ROCK FILTER DAMS (REMOVE) LF 240.000 $6.000 $12.000 $6.000 $6.000 $7.420 $5.000 $6.500
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 10,565.000 $1.900 $1.900 $2.000 $2.000 $1.700 $3.500 $2.200
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 10,565.000 $0.500 $0.500 $0.600 $0.350 $0.480 $1.000 $0.370
506 6041 BIODEG EROSN CONT LOGS (INSTL) (12") LF 120.000 $5.600 $5.000 $6.000 $6.000 $4.510 $10.000 $6.500
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 120.000 $0.500 $1.000 $1.250 $3.000 $0.800 $4.000 $3.200
530 6005 DRIVEWAYS (ACP) SY 283.000 $35.000 $48.000 $35.000 $60.100 $34.710 $69.000 $58.000
530 6017 DRIVEWAYS (CONC) (HES) SY 459.000 $85.000 $135.000 $95.000 $135.700 $159.000 $110.000 $130.000
533 6001 RUMBLE STRIPS (SHOULDER) LF 209,105.000 $0.160 $0.100 $0.200 $0.100 $0.120 $0.150 $0.180
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 12,875.000 $18.700 $20.000 $19.910 $22.000 $17.490 $19.000 $24.500
540 6006 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 32.000 $1,385.000 $1,500.000 $1,459.740 $1,521.000 $1,282.600 $1,400.000 $1,700.000
540 6008 MTL BEAM GD FEN TRANS (T101) EA 38.000 $950.000 $810.000 $1,085.760 $1,230.000 $954.000 $1,000.000 $1,350.000
542 6001 REMOVE METAL BEAM GUARD FENCE LF 11,350.000 $2.800 $2.850 $3.620 $3.700 $3.180 $4.000 $4.100
542 6004 RM MTL BM GD FENCE TRANS (THRIE-BEAM) EA 22.000 $258.000 $180.000 $361.920 $220.000 $318.000 $350.000 $240.000
542 6005 RM MTL BM GD FEN TRANS (T101) EA 27.000 $125.000 $180.000 $361.920 $220.000 $318.000 $350.000 $240.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 105.000 $1,385.000 $2,600.000 $3,076.320 $2,225.000 $2,703.000 $3,000.000 $2,480.000
544 6003 GUARDRAIL END TREATMENT (REMOVE) EA 94.000 $300.000 $330.000 $482.560 $220.000 $424.000 $450.000 $240.000
560 6011 MAILBOX INSTALL-S (TWW-POST) TY 4 EA 2.000 $200.000 $490.000 $361.920 $500.000 $318.000 $340.000 $525.000
658 6052 INSTL OM ASSM (OM-3L)(FLX)GND EA 41.000 $175.000 $280.000 $60.320 $350.000 $53.000 $56.000 $300.000
658 6056 INSTL OM ASSM (OM-3R)(FLX)GND EA 53.000 $175.000 $280.000 $60.320 $350.000 $53.000 $56.000 $300.000
658 6061 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2 EA 232.000 $30.000 $40.000 $60.320 $45.000 $53.000 $56.000 $42.000
662 6109 WK ZN PAV MRK SHT TERM (TAB)TY W EA 8,542.000 $0.700 $1.020 $1.030 $0.800 $1.120 $0.600 $2.000
666 6048 REFL PAV MRK TY I (W)24"(SLD)(100MIL) LF 102.000 $4.800 $14.200 $16.890 $5.500 $6.040 $6.000 $15.000
666 6054 REFL PAV MRK TY I (W)(ARROW)(100MIL) EA 4.000 $110.000 $155.000 $180.960 $140.000 $106.000 $106.000 $160.000
666 6078 REFL PAV MRK TY I (W)(WORD)(100MIL) EA 8.000 $140.000 $165.000 $193.020 $220.000 $106.000 $106.000 $170.000
666 6300 RE PM W/RET REQ TY I (W)4"(BRK)(100MIL) LF 29,160.000 $0.340 $0.400 $0.480 $0.450 $0.450 $0.450 $0.450
666 6306 RE PM W/RET REQ TY I (W)6"(BRK)(100MIL) LF 137,393.000 $0.570 $0.350 $0.420 $0.600 $0.530 $0.530 $0.370
666 6309 RE PM W/RET REQ TY I (W)6"(SLD)(100MIL) LF 14,815.000 $0.550 $0.850 $1.030 $0.550 $0.450 $0.450 $0.900
666 6315 RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) LF 134,682.000 $0.290 $0.420 $0.510 $0.450 $0.320 $0.320 $0.460
672 6010 REFL PAV MRKR TY II-C-R EA 1,557.000 $3.200 $5.000 $6.030 $4.000 $3.710 $3.710 $5.500
730 6107 FULL - WIDTH MOWING CYC 6.000 $1,500.000 $1,200.000 $750.000 $2,254.000 $1,272.000 $2,500.000 $2,600.000
3019 6001 TRACKLESS TACK COAT GAL 99,553.000 $3.350 $3.600 $3.530 $0.000 $4.300 $3.000 $7.350
6001 6002 PORTABLE CHANGEABLE MESSAGE SIGN EA 2.000 $9,500.000 $10,500.000 $5,000.000 $22,000.000 $5,466.340 $6,000.000 $25,000.000
6185 6001 TMA (STATIONARY) EA 2.000 $12,000.000 $26,300.000 $5,000.000 $41,500.000 $50,606.440 $20,000.000 $35,000.000
1 3002 6001 MEMBRANE UNDERSEAL GAL 99,553.000 $2.450 $0.000 $0.000 $3.050 $0.000 $0.000 $0.000
Totals: $10,176,342.86 $11,461,243.21 $11,496,099.38 $12,057,297.42 $12,294,652.07 $12,510,962.78 $13,572,433.69