PREPARING ROW
|
STA
|
227.190
|
$2,500.000
|
$260.700
|
$500.000
|
$858.500
|
$1,000.000
|
|
|
REMOV STAB BASE AND ASPH PAV (2"-15")
|
SY
|
1,688.000
|
$22.000
|
$6.030
|
$2.000
|
$9.400
|
$5.350
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
20,456.340
|
$22.000
|
$16.040
|
$12.000
|
$25.800
|
$37.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
5,870.560
|
$12.400
|
$25.110
|
$10.000
|
$21.400
|
$21.400
|
|
|
BROADCAST SEED (PERM) (RURAL) (SANDY)
|
SY
|
113,084.470
|
$0.270
|
$0.280
|
$0.280
|
$0.280
|
$0.450
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
113,084.470
|
$0.300
|
$0.320
|
$0.200
|
$0.320
|
$0.350
|
|
|
FERTILIZER
|
TON
|
0.700
|
$1,487.460
|
$2,800.000
|
$3,000.000
|
$2,800.000
|
$1,000.000
|
|
|
VEGETATIVE WATERING
|
MG
|
467.300
|
$21.330
|
$45.000
|
$15.000
|
$24.500
|
$30.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY B)
|
SY
|
113,084.470
|
$1.270
|
$1.090
|
$1.250
|
$1.090
|
$1.390
|
|
|
FL BS (RDWY DEL)(TYA GR 1, 2 OR 5)F POS
|
CY
|
7,908.440
|
$100.000
|
$70.790
|
$85.000
|
$78.320
|
$92.000
|
|
|
CEMENT
|
TON
|
1,152.000
|
$265.000
|
$200.000
|
$215.000
|
$275.000
|
$248.000
|
|
|
CEMENT TREAT (MX EXST MTL & NW BS)(8")
|
SY
|
94,901.020
|
$2.600
|
$2.260
|
$2.250
|
$3.120
|
$2.250
|
|
|
ASPH (MULTI OPTION)
|
GAL
|
33,612.000
|
$3.500
|
$3.930
|
$3.700
|
$4.260
|
$3.950
|
|
|
ASPH (RC-250)
|
GAL
|
17,690.910
|
$7.510
|
$4.820
|
$4.750
|
$6.460
|
$5.100
|
|
|
AGGR(TY-B GR-3 SAC-B)
|
CY
|
802.000
|
$150.000
|
$137.000
|
$115.000
|
$81.920
|
$128.000
|
|
|
AGGR(TY-B GR-5 SAC-B)
|
CY
|
611.000
|
$120.000
|
$119.000
|
$130.000
|
$82.040
|
$183.000
|
|
|
CEM STABIL BKFL
|
CY
|
227.000
|
$100.000
|
$110.000
|
$250.000
|
$217.230
|
$183.000
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
331.000
|
$166.000
|
$42.670
|
$200.000
|
$176.390
|
$64.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
41.000
|
$3.000
|
$20.000
|
$16.000
|
$9.350
|
$8.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
3,523.000
|
$50.000
|
$15.000
|
$16.000
|
$27.420
|
$23.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
26.000
|
$752.500
|
$502.000
|
$725.000
|
$762.420
|
$642.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
47.000
|
$147.000
|
$232.000
|
$250.000
|
$256.000
|
$275.000
|
|
|
CMP (GAL STL 12 IN)
|
LF
|
300.000
|
$70.000
|
$55.600
|
$65.000
|
$77.230
|
$65.000
|
|
|
CMP (GAL STL 18 IN)
|
LF
|
280.000
|
$280.000
|
$63.600
|
$85.000
|
$96.190
|
$81.000
|
|
|
CONC BOX CULV (4 FT X 4 FT)
|
LF
|
60.000
|
$386.000
|
$680.000
|
$500.000
|
$512.410
|
$432.000
|
|
|
CONC BOX CULV (5 FT X 2 FT)
|
LF
|
86.000
|
$460.000
|
$702.000
|
$575.000
|
$552.110
|
$465.000
|
|
|
CONC BOX CULV (5 FT X 3 FT)
|
LF
|
147.000
|
$477.500
|
$757.670
|
$625.000
|
$578.250
|
$487.000
|
|
|
CONC BOX CULV (7 FT X 4 FT)
|
LF
|
82.000
|
$781.000
|
$1,088.280
|
$1,050.000
|
$1,094.250
|
$922.000
|
|
|
CONC BOX CULV (6 FT X 2 FT)
|
LF
|
225.000
|
$600.000
|
$813.700
|
$725.000
|
$645.420
|
$544.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
373.000
|
$85.500
|
$72.170
|
$75.000
|
$92.700
|
$79.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
336.000
|
$120.000
|
$83.300
|
$90.000
|
$113.490
|
$96.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
49.000
|
$183.000
|
$120.300
|
$120.000
|
$151.910
|
$128.000
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
84.000
|
$247.400
|
$200.000
|
$275.000
|
$262.980
|
$222.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 42 IN)
|
EA
|
1.000
|
$13,700.000
|
$8,105.000
|
$10,000.000
|
$12,297.790
|
$10,355.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 5 FT)(3:1) (C)
|
EA
|
1.000
|
$8,370.000
|
$7,595.000
|
$7,000.000
|
$16,741.410
|
$14,100.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 5 FT)(4:1) (C)
|
EA
|
1.000
|
$11,581.000
|
$8,028.000
|
$8,000.000
|
$17,758.930
|
$14,950.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 3 FT)(3:1) (C)
|
EA
|
4.000
|
$10,707.000
|
$7,025.000
|
$7,000.000
|
$8,581.120
|
$7,225.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 4 FT)(3:1) (C)
|
EA
|
6.000
|
$10,333.000
|
$6,018.000
|
$7,000.000
|
$11,358.290
|
$9,600.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 3 FT)(4:1) (C)
|
EA
|
10.000
|
$12,638.000
|
$6,982.000
|
$8,000.000
|
$10,709.360
|
$9,015.000
|
|
|
SET (TY I)(S= 7 FT)(HW= 4 FT)(3:1) (C)
|
EA
|
4.000
|
$7,490.000
|
$9,258.000
|
$8,500.000
|
$17,218.150
|
$14,500.000
|
|
|
SET (TY II) (12 IN) (CMP) (6: 1) (P)
|
EA
|
12.000
|
$2,200.000
|
$1,234.000
|
$1,500.000
|
$1,550.190
|
$1,305.000
|
|
|
SET (TY II) (18 IN) (CMP) (6: 1) (P)
|
EA
|
16.000
|
$1,645.000
|
$1,234.000
|
$1,600.000
|
$1,851.720
|
$1,559.000
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (P)
|
EA
|
12.000
|
$1,816.420
|
$1,702.000
|
$1,600.000
|
$2,007.680
|
$1,690.000
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
4.000
|
$2,667.000
|
$2,107.000
|
$1,700.000
|
$2,522.350
|
$2,125.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
14.000
|
$2,356.830
|
$2,075.000
|
$2,200.000
|
$2,765.760
|
$2,330.000
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (P)
|
EA
|
2.000
|
$4,808.090
|
$4,122.000
|
$4,000.000
|
$5,490.000
|
$5,500.000
|
|
|
SET (TY II) (42 IN) (RCP) (3: 1) (C)
|
EA
|
6.000
|
$4,765.000
|
$4,400.000
|
$5,000.000
|
$8,163.610
|
$6,875.000
|
|
|
SET (TY II) (42 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$5,267.000
|
$6,315.000
|
$5,500.000
|
$8,964.000
|
$7,546.000
|
|
|
SET (TY II) (54 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$12,500.000
|
$9,951.000
|
$9,000.000
|
$12,035.000
|
$12,050.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
6.000
|
$5,576.000
|
$850.000
|
$2,000.000
|
$3,113.240
|
$2,621.000
|
|
|
REMOV STR (SET)
|
EA
|
24.000
|
$113.000
|
$1,000.000
|
$2,500.000
|
$625.210
|
$636.000
|
|
|
REMOV STR (PIPE)
|
EA
|
26.000
|
$300.000
|
$560.000
|
$5,000.000
|
$1,154.240
|
$1,215.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$825,827.850
|
$428,800.000
|
$600,000.000
|
$794,725.820
|
$725,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
10.000
|
$13,500.000
|
$6,278.000
|
$20,000.000
|
$4,406.880
|
$10,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
1,340.000
|
$48.600
|
$44.000
|
$40.000
|
$44.000
|
$45.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
500.000
|
$60.000
|
$78.000
|
$50.000
|
$78.000
|
$100.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
1,540.000
|
$18.180
|
$25.000
|
$10.000
|
$20.000
|
$20.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
780.000
|
$7.060
|
$23.000
|
$10.000
|
$25.000
|
$38.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,840.000
|
$4.270
|
$4.500
|
$7.000
|
$4.500
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,840.000
|
$1.580
|
$1.500
|
$2.000
|
$1.500
|
$1.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
2,294.000
|
$113.000
|
$67.690
|
$80.000
|
$102.280
|
$102.000
|
|
|
TURNOUTS (ACP)
|
SY
|
192.000
|
$87.500
|
$75.000
|
$100.000
|
$50.600
|
$76.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
56,691.240
|
$0.550
|
$0.100
|
$0.100
|
$0.170
|
$0.100
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
33,014.650
|
$0.710
|
$0.100
|
$0.150
|
$0.200
|
$0.150
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
9.000
|
$358.680
|
$260.000
|
$300.000
|
$260.000
|
$260.000
|
|
|
MAILBOX INSTALL-D (TWW-POST) TY 4
|
EA
|
2.000
|
$397.440
|
$295.000
|
$325.000
|
$295.000
|
$295.000
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
1.000
|
$709.800
|
$500.000
|
$550.000
|
$500.000
|
$500.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
36.000
|
$847.230
|
$775.000
|
$850.000
|
$775.000
|
$775.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
10.000
|
$1,100.000
|
$875.000
|
$900.000
|
$875.000
|
$875.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
7.000
|
$1,350.000
|
$950.000
|
$1,000.000
|
$950.000
|
$950.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
53.000
|
$111.000
|
$75.000
|
$100.000
|
$75.000
|
$75.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
26.000
|
$75.000
|
$75.000
|
$100.000
|
$75.000
|
$75.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
49,680.000
|
$0.500
|
$0.320
|
$0.350
|
$0.400
|
$0.350
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
54,680.000
|
$0.540
|
$0.320
|
$0.350
|
$0.400
|
$0.350
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
120.000
|
$9.030
|
$12.800
|
$15.000
|
$12.000
|
$8.500
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
9,936.000
|
$1.950
|
$1.750
|
$1.000
|
$1.630
|
$1.250
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
|
LF
|
56,691.242
|
$0.830
|
$0.580
|
$0.600
|
$0.720
|
$0.710
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(090MIL)
|
LF
|
4,915.261
|
$1.210
|
$0.650
|
$0.700
|
$0.720
|
$1.060
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
|
LF
|
42,367.336
|
$0.850
|
$0.650
|
$0.700
|
$0.720
|
$0.710
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
775.354
|
$3.000
|
$3.900
|
$4.000
|
$6.000
|
$4.440
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
4.000
|
$319.740
|
$650.000
|
$700.000
|
$650.000
|
$650.000
|
|
|
REMOVE RDSD FLASH BEACON ASSEMBLY
|
EA
|
2.000
|
$986.530
|
$665.000
|
$700.000
|
$665.000
|
$665.000
|
|
|
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
|
EA
|
2.000
|
$8,562.530
|
$11,500.000
|
$12,000.000
|
$11,500.000
|
$11,500.000
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
19,459.920
|
$105.500
|
$93.000
|
$90.000
|
$97.900
|
$101.000
|
|
|
D-GR HMA TY-D SAC-B PG70-22
|
TON
|
9,730.040
|
$115.000
|
$109.500
|
$102.000
|
$108.900
|
$119.000
|
|
|
TACK COAT
|
GAL
|
7,076.400
|
$3.700
|
$4.300
|
$5.000
|
$4.090
|
$3.650
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$18,000.000
|
$25,000.000
|
$11,665.430
|
$12,500.000
|
|
|
TMA (STATIONARY)
|
DAY
|
179.000
|
$200.000
|
$250.000
|
$250.000
|
$270.630
|
$250.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
240.000
|
$76.000
|
$50.000
|
$20.000
|
$108.250
|
$95.000
|
|
Totals: |
$9,413,783.334
|
$7,291,794.130
|
$7,680,464.411
|
$8,621,077.856
|
$8,915,101.370
|