Show Job Controls
Bid Cobra

KARNES SH 72 (0270-03-075)

Items: 101

County: KARNES
Length: N/A
Highway: SH 72
District: CORPUS CHRISTI
Control Number: 0270-03-075
DBE Goal: N/A
Project: STP 1802(559)
Guaranty: N/A
Time: 547 WORKING DAYS
Engineer's Estimate: $19,433,998.84
Date: 08/08/2018 (7 years ago)
Contract Number: N/A
Type: REHABILITATE ROADWAY AND ADD PASSING LANES
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$19,433,998.84
$18,309,293.78
Over/Under Est: -5.79% -$1,124,705.06
Over/Under Est: 1.22% $236,794.65
Amt Left: 7.44% $1,361,499.71
Over/Under Est: 13.15% $2,556,296.44
Amt Left: 20.1% $3,681,001.50
Delta: -11.79% -$2,319,501.79
$22,734,450.84
Over/Under Est: 16.98% $3,300,452.00
Amt Left: 24.17% $4,425,157.06
Delta: -3.38% -$744,155.56

Bid Items & Bid Tabulations

101 Total 0 of 101
KARNES  |  SH 72  |  CORPUS CHRISTI  |  0270-03-075  |  08/08/2018  |  $19,433,998.84  |  STP 1802(559)  |  REHAB ROADWAY AND ADD PASSING LANES  |  547 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HUNTER INDUSTRIES, LTD.
ANGEL BROTHERS HOLDINGS CORP.
CURRAN CONTRACTING COMPANY
RAY FARIS, INC.
PREPARING ROW
STA 533.300 $800.000 $216.450 $270.000 $1,000.000 $532.500
REMOVING CONC (RIPRAP)
SY 154.000 $14.000 $14.550 $15.000 $8.300 $15.890
REMOVING STAB BASE AND ASPH PAV (5")
SY 265,700.000 $2.000 $1.910 $1.850 $2.180 $2.630
REMOVING STAB BASE & ASPH PAV (1.5")
SY 40,804.000 $4.000 $1.220 $1.090 $1.200 $1.660
EXCAVATION (ROADWAY)
CY 65,664.000 $6.000 $11.040 $9.300 $12.000 $10.630
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 27,563.000 $16.000 $5.610 $6.150 $15.110 $8.950
FURNISHING AND PLACING TOPSOIL (4")
SY 42,397.000 $0.800 $0.830 $1.000 $3.640 $0.680
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 169,587.000 $0.120 $0.150 $0.160 $0.130 $0.150
BROADCAST SEED (TEMP) (WARM)
SY 127,191.000 $0.050 $0.080 $0.090 $0.130 $0.080
BROADCAST SEED (TEMP) (COOL)
SY 42,397.000 $0.100 $0.080 $0.090 $0.130 $0.080
VEGETATIVE WATERING
MG 1,695.900 $10.000 $16.650 $17.000 $29.120 $19.080
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 4,825.000 $0.850 $0.760 $0.800 $1.330 $0.760
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 75,823.000 $50.000 $46.100 $53.500 $59.470 $52.120
CEMENT
TON 5,101.000 $140.000 $131.250 $149.000 $141.820 $140.000
CEMENT TREAT (NEW BASE) (8")
SY 291,630.000 $2.000 $1.600 $1.050 $2.600 $1.780
CEMENT TREAT(EXIST MATL)(8")
SY 294,621.000 $2.000 $1.600 $1.150 $2.350 $1.780
PRIME COAT (MC-30)
GAL 56,810.000 $3.500 $4.450 $3.700 $4.890 $4.660
ASPH (MULTI OPTION)
GAL 113,620.000 $2.500 $3.150 $2.800 $2.600 $7.340
AGGR (MULTI OPTION)
CY 3,342.000 $68.000 $61.840 $85.000 $125.000 $82.740
D-GR HMA TY B SAC-B PG (64-22)
TON 56,545.000 $63.000 $65.210 $70.000 $66.340 $72.440
SUPERPAVE MIXTURES SP-D SAC-B PG70-22
TON 32,751.000 $60.000 $74.660 $78.500 $80.750 $81.030
TEMPORARY SPL SHORING
SF 1,700.000 $20.000 $29.400 $40.000 $26.670 $40.000
RIPRAP (CONC)(4 IN)
CY 39.400 $590.000 $425.250 $478.000 $342.830 $500.000
RIPRAP (MOW STRIP)(5 IN)
CY 350.300 $430.000 $435.750 $500.000 $516.660 $500.000
CLEANING AND SEALING EXISTING JOINTS
LF 700.000 $40.000 $28.000 $30.000 $31.750 $30.000
CMP (GAL STL 18 IN)
LF 1,548.000 $60.000 $65.030 $47.000 $58.200 $50.000
CMP (GAL STL 24 IN)
LF 354.000 $74.000 $71.530 $49.500 $86.240 $89.000
CONC BOX CULV (3 FT X 3 FT)(EXTEND)
LF 20.000 $310.000 $876.750 $1,190.000 $1,166.720 $400.000
CONC BOX CULV (10 FT X 10 FT)(EXTEND)
LF 10.000 $900.000 $997.500 $3,000.000 $2,132.670 $1,200.000
CONC BOX CULV (5 FT X 6.5 FT)(EXTEND)
LF 14.000 $1,000.000 $892.500 $1,600.000 $1,830.920 $550.000
RC PIPE (CL III)(24 IN)
LF 70.000 $76.000 $95.550 $109.000 $107.940 $125.000
WINGWALL (PW - 2) (HW=12 FT)
EA 2.000 $40,000.000 $27,824.910 $37,000.000 $43,000.000 $40,000.000
WINGWALL (PW - 2) (HW=13 FT)
EA 1.000 $50,000.000 $35,699.880 $44,000.000 $45,683.710 $48,000.000
WINGWALL (PW - 2) (HW=5 FT)
EA 1.000 $12,000.000 $10,196.520 $12,500.000 $6,228.600 $6,000.000
WINGWALL (PW - 2) (HW=7 FT)
EA 1.000 $20,000.000 $11,831.780 $23,000.000 $17,118.420 $11,000.000
WINGWALL (PW - 2) (HW=8 FT)
EA 2.000 $25,000.000 $12,723.120 $29,000.000 $18,091.700 $15,000.000
SET (TY I)(S=3 FT)(HW= 4 FT)(3:1)(C)
EA 2.000 $4,500.000 $7,448.780 $13,500.000 $6,338.680 $6,500.000
SET (TY II) (18 IN) (CMP) (6: 1) (P)
EA 82.000 $800.000 $971.250 $1,400.000 $332.280 $900.000
SET (TY II) (24 IN) (CMP) (6: 1) (P)
EA 20.000 $1,200.000 $997.500 $1,500.000 $395.770 $1,000.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 1.000 $1,000.000 $1,260.000 $1,875.000 $1,016.940 $900.000
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 1.000 $1,700.000 $1,260.000 $3,150.000 $1,248.680 $1,000.000
CLEAN EXIST CULVERTS
EA 30.000 $1,000.000 $1,574.990 $2,300.000 $2,407.830 $1,200.000
REMOV STR (PIPE)
LF 68.000 $14.000 $21.000 $20.000 $16.930 $30.000
REMOV STR (DRIVEWAY CULVERT)
EA 52.000 $380.000 $1,064.700 $400.000 $191.540 $750.000
MOBILIZATION
LS 1.000 $1,090,000.000 $1,273,772.520 $1,485,600.000 $1,300,000.000 $2,500,771.790
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 24.000 $3,500.000 $1,998.820 $3,000.000 $9,000.000 $4,500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 2,540.000 $31.000 $22.000 $23.000 $32.160 $22.000
ROCK FILTER DAMS (REMOVE)
LF 2,540.000 $8.000 $7.000 $7.000 $7.750 $7.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 42,226.000 $3.000 $1.700 $1.800 $2.070 $1.700
TEMP SEDMT CONT FENCE (REMOVE)
LF 42,226.000 $1.000 $0.500 $0.500 $0.810 $0.500
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 3,540.000 $6.000 $3.250 $3.500 $5.200 $3.250
BIODEG EROSN CONT LOGS (REMOVE)
LF 3,540.000 $1.000 $1.000 $1.000 $0.570 $1.000
CONSTRUCTING DETOURS
SY 41,641.000 $50.000 $27.860 $30.550 $34.070 $47.240
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 780.000 $25.000 $18.900 $25.000 $28.600 $70.000
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 780.000 $7.000 $18.900 $14.000 $11.420 $20.000
INTRSCT, DRVWAYS, & TURNOUT (ACP)
SY 9,639.000 $35.000 $31.710 $44.000 $43.460 $35.700
RUMBLE STRIPS (SHOULDER)
LF 95,970.000 $0.100 $0.180 $0.200 $0.280 $0.100
RUMBLE STRIPS (CENTERLINE)
LF 46,975.000 $0.150 $0.200 $0.200 $0.320 $0.100
MTL W-BEAM GD FEN (TIM POST)
LF 975.000 $25.000 $22.740 $24.400 $24.060 $23.960
MTL W-BEAM GD FEN (STEEL POST)
LF 2,825.000 $25.000 $23.400 $25.000 $24.760 $28.140
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 8.000 $1,600.000 $1,975.000 $2,000.000 $1,560.850 $1,466.000
REMOVE METAL BEAM GUARD FENCE
LF 3,188.000 $5.000 $1.000 $1.000 $1.060 $1.700
REMOVE TERMINAL ANCHOR SECTION
EA 2.000 $500.000 $125.000 $125.000 $132.280 $325.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 8.000 $36.000 $150.000 $150.000 $158.730 $106.000
GUARDRAIL END TREATMENT (INSTALL)
EA 32.000 $2,600.000 $2,664.000 $2,900.000 $2,819.060 $2,846.000
GUARDRAIL END TREATMENT (REMOVE)
EA 30.000 $440.000 $150.000 $150.000 $158.730 $106.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $600.000 $1,000.000 $800.000 $396.060 $375.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $8,000.000 $7,500.000 $8,500.000 $6,290.790 $6,485.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 63.000 $400.000 $495.000 $530.000 $546.560 $495.000
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
EA 10.000 $600.000 $580.000 $620.000 $647.520 $580.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 8.000 $530.000 $620.000 $660.000 $684.020 $620.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 5.000 $650.000 $680.000 $720.000 $763.500 $680.000
REMOVE SM RD SN SUP&AM
EA 70.000 $58.000 $50.000 $50.000 $68.780 $50.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 61.000 $58.000 $54.000 $57.000 $41.800 $54.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 74.000 $30.000 $28.000 $30.000 $14.550 $28.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 195,040.000 $0.150 $0.150 $0.300 $0.180 $0.200
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 199,747.000 $0.150 $0.150 $0.300 $0.180 $0.260
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 23,779.000 $0.500 $0.820 $0.430 $0.960 $0.650
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 28,904.000 $0.500 $0.820 $0.430 $0.960 $0.700
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 3,000.000 $1.000 $1.760 $0.820 $0.950 $1.180
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 4,950.000 $1.000 $1.760 $0.820 $0.950 $1.180
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
LF 1,295.000 $0.300 $1.030 $0.320 $1.200 $1.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,455.000 $0.750 $2.060 $0.640 $2.390 $0.750
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 10,040.000 $0.400 $0.310 $0.320 $0.360 $0.400
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 105,855.000 $0.250 $0.310 $0.300 $0.360 $0.340
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 245.000 $0.250 $0.310 $0.320 $0.360 $1.000
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 114,575.000 $0.250 $0.310 $0.300 $0.360 $0.340
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 260.000 $10.000 $10.280 $11.750 $11.970 $13.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 10.000 $180.000 $205.540 $185.000 $239.390 $225.000
PREFAB PAV MRK TY C (W) (LNDP ARROW)
EA 6.000 $450.000 $411.070 $412.000 $478.770 $585.000
PREFAB PAV MRK TY C (W) (WORD)
EA 8.000 $250.000 $256.920 $260.000 $299.230 $330.000
PREFAB PAV MRK TY C (Y) (MED NOSE)
EA 4.000 $250.000 $411.070 $650.000 $478.780 $465.000
REFL PAV MRKR TY I-C
EA 559.000 $2.500 $5.140 $3.450 $5.980 $4.000
REFL PAV MRKR TY II-A-A
EA 2,028.000 $2.500 $5.140 $3.450 $5.980 $3.500
ELIM EXT PAV MRK & MRKS (4")
LF 88,904.000 $1.000 $1.030 $0.850 $0.610 $0.600
ELIM EXT PAV MRK & MRKS (6")
LF 3,645.000 $0.500 $0.510 $1.000 $0.650 $0.650
TREE TRIMMING / BRUSH REMOVAL
MI 10.106 $15,000.000 $10,500.000 $10,500.000 $10,250.040 $9,692.000
TREE TRIMMING / BRUSH REMOVAL(CHANNELS)
AC 1.500 $5,000.000 $1,050.000 $23,000.000 $22,751.410 $21,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 8.000 $7,000.000 $7,624.670 $5,500.000 $11,455.070 $7,000.000
TMA (STATIONARY)
EA 4.000 $5,550.000 $8,641.300 $13,500.000 $7,100.000 $12,000.000
TMA (MOBILE OPERATION)
HR 160.000 $45.000 $101.660 $20.000 $37.000 $50.000
Totals: $19,433,998.840 $18,309,293.795 $19,670,793.490 $21,990,295.307 $22,734,450.844