Job Info for 0270-03-074

County: KARNES Highway: SH 72 Date: 01/04/2017 (7 years ago) Engineer's Estimate: $4,807,491 Control Number: 0270-03-074
Project: STP 2017(305) District: CORPUS CHRISTI Time: 232 WORKING DAYS Type: BASE REPAIR, SURFACE AND RESTRIPE ROADWAY

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $4,807,490.60
HUNTER INDUSTRIES, LTD.   $5,186,387.04 1
7.88% | $378,896.44
CURRAN CONTRACTING COMPANY   $5,451,747.33 2
13.4% | $644,256.73
5.12% | $265,360.29
DEAN WORD COMPANY, LTD.   $5,520,600.82 3
14.83% | $713,110.22
6.44% | $334,213.78
1.26% | $68,853.49
ANGEL BROTHERS HOLDINGS CORP.   $5,546,964.30 4
15.38% | $739,473.70
6.95% | $360,577.26
0.48% | $26,363.48
AUSTIN MATERIALS, LLC   $5,887,845.11 5
22.47% | $1,080,354.51
13.52% | $701,458.07
6.15% | $340,880.81
SALINAS CONSTRUCTION TECHNOLOGIES, LTD.   $6,108,187.04 6
27.06% | $1,300,696.44
17.77% | $921,800.00
3.74% | $220,341.93
RAY FARIS, INC.   $7,047,799.93 7
46.6% | $2,240,309.33
35.89% | $1,861,412.89
15.38% | $939,612.89
J. CARROLL WEAVER, INC.   $7,742,442.38 8
61.05% | $2,934,951.78
49.28% | $2,556,055.34
9.86% | $694,642.45

Bid Items

Items: 86, 0 filtered
KARNES SH 72  |  CORPUS CHRISTI  |  0270-03-074  |  01/04/2017  |  $4,807,491  |  STP 2017(305)  |  BASE REPAIR, SURF AND RESTRIPE ROADWAY  |  232 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate HUNTER INDUSTRIES, LTD. CURRAN CONTRACTING COMPANY DEAN WORD COMPANY, LTD. ANGEL BROTHERS HOLDINGS CORP. AUSTIN MATERIALS, LLC SALINAS CONSTRUCTION TECHNOLOGIES, LTD. RAY FARIS, INC. J. CARROLL WEAVER, INC.
100 6002 PREPARING ROW STA 98.200 $200.000 $618.000 $214.750 $1,329.094 $1,925.000 $317.130 $317.130 $1,037.000 $114.000
104 6015 REMOVING CONC (SIDEWALKS) SY 383.000 $12.000 $15.000 $5.850 $21.000 $10.000 $19.950 $19.950 $37.180 $12.210
104 6022 REMOVING CONC (CURB AND GUTTER) LF 10,205.000 $6.000 $7.500 $1.850 $8.579 $3.750 $6.030 $6.030 $7.780 $6.100
104 6028 REMOVING CONC (MISC) SY 53.000 $30.000 $40.000 $25.000 $40.950 $25.000 $43.680 $43.680 $37.180 $27.780
110 6001 EXCAVATION (ROADWAY) CY 37,435.000 $14.000 $11.130 $9.100 $12.222 $11.600 $11.210 $11.210 $26.340 $25.080
132 6003 EMBANKMENT (FINAL)(ORD COMP)(TY B) CY 521.000 $18.000 $12.360 $28.300 $11.519 $8.500 $20.420 $20.420 $33.900 $33.490
161 6017 COMPOST MANUF TOPSOIL (4") SY 8,493.000 $2.000 $1.300 $1.450 $3.380 $2.000 $1.360 $6.460 $4.690 $3.310
162 6002 BLOCK SODDING SY 8,493.000 $5.000 $4.500 $4.300 $4.460 $4.400 $4.050 $4.750 $4.500 $4.670
168 6001 VEGETATIVE WATERING MG 154.800 $15.000 $29.970 $30.100 $24.990 $19.000 $28.400 $64.420 $28.560 $38.800
216 6001 PROOF ROLLING HR 20.000 $50.000 $42.180 $124.500 $61.005 $90.000 $58.570 $58.570 $56.500 $87.740
247 6041 FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS) CY 21,696.000 $50.000 $55.250 $60.650 $55.535 $55.000 $67.240 $62.110 $68.680 $64.200
310 6013 PRIME COAT (SS-1) GAL 26,037.000 $3.000 $2.800 $2.100 $1.609 $3.100 $1.760 $3.110 $0.200 $3.270
316 6001 ASPH (MULTI OPTION) GAL 25,388.000 $2.000 $2.570 $3.900 $2.192 $2.500 $2.550 $2.830 $2.610 $3.400
316 6002 AGGR (MULTI OPTION) CY 598.000 $50.000 $66.070 $153.700 $86.142 $100.000 $115.000 $152.020 $90.900 $210.720
341 6008 D-GR HMA TY-B PG64-22 TON 19,950.000 $55.000 $63.970 $73.150 $60.201 $66.500 $66.000 $78.620 $72.670 $90.730
341 6042 D-GR HMA TY-D SAC-B PG70-22 TON 6,955.000 $60.000 $69.680 $83.400 $67.485 $71.500 $71.000 $81.010 $78.690 $93.290
354 6037 PLANE CONC PAV(0" TO 2") SY 138.000 $4.000 $25.380 $32.150 $31.763 $4.000 $11.050 $52.110 $45.200 $85.400
420 6132 CL A CONC (STEPS) CY 2.000 $1,200.000 $428.420 $1,233.100 $672.000 $1,500.000 $1,426.920 $1,426.920 $2,000.000 $1,710.000
432 6001 RIPRAP (CONC)(4 IN) CY 3.000 $400.000 $455.200 $671.100 $567.000 $1,100.000 $694.420 $694.420 $2,000.000 $1,140.000
451 6004 RETROFIT RAIL (TY T131RC) LF 90.000 $120.000 $176.720 $154.900 $164.738 $130.000 $245.950 $245.950 $185.280 $188.100
460 6004 CMP (GAL STL 30 IN) LF 8.000 $100.000 $69.620 $265.750 $107.100 $160.000 $205.210 $205.210 $225.000 $652.220
467 6408 SET (TY II) (30 IN) (CMP) (4: 1) (C) EA 1.000 $1,800.000 $1,660.130 $2,319.950 $1,457.400 $2,400.000 $1,863.840 $1,863.840 $1,500.000 $1,710.000
496 6002 REMOV STR (INLET) EA 2.000 $300.000 $428.420 $622.800 $603.750 $540.000 $309.280 $309.280 $1,200.000 $2,603.350
496 6004 REMOV STR (SET) EA 1.000 $500.000 $267.760 $311.400 $577.500 $540.000 $340.530 $340.530 $1,200.000 $5,206.700
496 6007 REMOV STR (PIPE) LF 80.000 $25.000 $7.500 $15.550 $26.250 $23.000 $17.200 $17.200 $15.000 $65.080
500 6001 MOBILIZATION LS 1.000 $250,000.000 $452,731.390 $300,000.000 $548,472.616 $555,000.000 $585,000.000 $360,700.000 $775,278.180 $802,796.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 13.000 $4,500.000 $4,100.000 $10,400.850 $6,037.520 $3,700.000 $13,781.000 $2,480.000 $18,312.000 $2,375.540
506 6001 ROCK FILTER DAMS (INSTALL) (TY 1) LF 120.000 $25.000 $22.000 $31.550 $24.257 $21.000 $29.770 $26.680 $22.000 $62.700
506 6011 ROCK FILTER DAMS (REMOVE) LF 120.000 $10.000 $7.000 $16.200 $8.704 $6.000 $15.300 $10.070 $7.000 $22.800
506 6020 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 444.000 $20.000 $12.000 $26.750 $15.244 $30.000 $25.240 $16.490 $12.000 $28.500
506 6024 CONSTRUCTION EXITS (REMOVE) SY 444.000 $10.000 $3.000 $10.500 $5.974 $6.000 $9.910 $6.590 $3.000 $17.100
506 6030 BACKHOE WORK (EROSION & SEDMT CONT) HR 20.000 $115.000 $57.000 $185.500 $103.436 $115.000 $81.070 $81.070 $62.000 $51.300
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 3,217.000 $2.000 $1.850 $5.350 $2.575 $2.300 $5.050 $3.040 $1.850 $3.990
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 3,217.000 $0.250 $0.500 $0.600 $0.515 $0.500 $0.570 $0.840 $0.500 $0.570
506 6041 BIODEG EROSN CONT LOGS (INSTL) (12") LF 132.000 $4.500 $5.500 $6.350 $6.077 $4.500 $6.010 $7.200 $5.500 $6.840
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 132.000 $1.000 $1.000 $1.800 $1.236 $2.500 $1.710 $2.030 $1.000 $1.140
510 6003 ONE-WAY TRAF CONT (PORT TRAF SIG) MO 4.000 $5,000.000 $5,640.000 $3,097.950 $4,480.500 $5,700.000 $4,250.000 $11,436.320 $4,000.000 $5,700.000
512 6009 PORT CTB (FUR & INST)(LOW PROF)(TY 1) LF 2,960.000 $35.000 $10.500 $27.550 $14.910 $20.000 $20.000 $62.010 $22.000 $68.760
512 6010 PORT CTB (FUR & INST)(LOW PROF)(TY 2) LF 480.000 $35.000 $15.000 $20.450 $27.878 $20.000 $20.000 $75.930 $22.000 $82.140
512 6033 PORT CTB (MOVE)(LOW PROF)(TY 1) LF 7,440.000 $9.000 $7.000 $4.250 $9.188 $7.500 $10.000 $7.110 $10.000 $20.820
512 6034 PORT CTB (MOVE)(LOW PROF)(TY 2) LF 1,040.000 $9.000 $13.000 $17.900 $12.338 $7.500 $10.000 $7.490 $10.000 $25.740
512 6057 PORT CTB (REMOVE)(LOW PROF)(TY 1) LF 2,960.000 $9.000 $8.500 $9.150 $12.863 $14.000 $12.000 $13.990 $15.000 $35.140
512 6058 PORT CTB (REMOVE)(LOW PROF)(TY 2) LF 480.000 $9.000 $8.500 $6.150 $12.863 $14.000 $12.000 $20.110 $15.000 $24.690
529 6008 CONC CURB & GUTTER (TY II) LF 12,621.000 $20.000 $19.280 $17.750 $27.143 $17.500 $17.340 $17.340 $23.010 $24.850
529 6020 CONC CURB & GUTTER (ARMOR CURB) LF 28.000 $125.000 $128.530 $245.850 $273.000 $165.000 $312.680 $312.680 $150.000 $142.500
530 6004 DRIVEWAYS (CONC) SY 1,024.000 $60.000 $67.480 $75.300 $63.000 $63.000 $69.280 $69.280 $64.150 $103.740
530 6006 DRIVEWAYS (SURF TREAT) SY 564.000 $25.000 $18.660 $16.850 $19.491 $23.000 $16.000 $38.900 $26.560 $17.100
530 6016 DRIVEWAYS (BASE) SY 333.000 $15.000 $9.900 $10.300 $15.971 $11.000 $32.030 $32.030 $22.560 $17.100
531 6001 CONC SIDEWALKS (4") SY 403.000 $45.000 $52.480 $76.750 $52.500 $53.000 $55.950 $55.950 $61.150 $88.920
531 6004 CURB RAMPS (TY 1) EA 2.000 $1,500.000 $1,392.370 $1,497.250 $1,197.000 $2,000.000 $1,885.430 $1,885.430 $1,200.000 $2,166.000
531 6008 CURB RAMPS (TY 5) EA 4.000 $1,500.000 $1,767.240 $3,387.500 $1,470.000 $2,250.000 $1,994.410 $1,994.410 $1,200.000 $1,938.000
531 6010 CURB RAMPS (TY 7) EA 4.000 $1,500.000 $1,553.030 $1,503.700 $1,617.000 $1,500.000 $2,019.410 $2,019.410 $1,200.000 $2,052.000
540 6006 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 4.000 $1,500.000 $2,050.000 $2,114.600 $1,897.098 $1,800.000 $1,995.000 $2,498.290 $1,408.590 $2,741.700
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 4.000 $2,000.000 $2,225.000 $2,787.650 $2,482.300 $2,500.000 $2,630.000 $2,058.290 $2,410.000 $2,479.500
560 6001 MAILBOX INSTALL-S (TWG-POST) TY 1 EA 10.000 $275.000 $115.000 $265.000 $118.450 $115.000 $250.000 $135.820 $115.000 $148.200
644 6027 IN SM RD SN SUP&AM TYS80(1)SA(P) EA 118.000 $490.000 $455.000 $498.200 $468.650 $460.000 $470.000 $510.760 $455.000 $530.100
644 6030 IN SM RD SN SUP&AM TYS80(1)SA(T) EA 6.000 $550.000 $575.000 $736.650 $592.250 $575.000 $695.000 $640.260 $575.000 $706.800
644 6033 IN SM RD SN SUP&AM TYS80(1)SA(U) EA 3.000 $675.000 $660.000 $620.050 $679.800 $675.000 $585.000 $735.320 $660.000 $803.700
644 6070 RELOCATE SM RD SN SUP&AM TY S80 EA 1.000 $360.000 $375.000 $529.950 $386.250 $400.000 $500.000 $421.820 $375.000 $609.900
644 6076 REMOVE SM RD SN SUP&AM EA 16.000 $65.000 $60.000 $238.500 $61.800 $60.000 $225.000 $71.820 $60.000 $74.100
662 6016 WK ZN PAV MRK NON-REMOV (W)24"(SLD) LF 96.000 $2.350 $3.000 $6.350 $3.090 $3.100 $6.000 $7.570 $3.000 $3.420
662 6048 WK ZN PAV MRK REMOV (REFL) TY I-C EA 1,914.000 $3.500 $2.000 $2.550 $2.060 $2.100 $2.400 $2.690 $2.000 $2.280
662 6050 WK ZN PAV MRK REMOV (REFL) TY II-A-A EA 1,914.000 $3.500 $2.000 $2.550 $2.060 $2.100 $2.400 $2.690 $2.000 $2.280
662 6056 WK ZN PAV MRK REMOV (TRAF BTN) TY W EA 7,940.000 $2.000 $1.500 $2.250 $1.545 $1.550 $2.100 $2.320 $1.500 $1.710
662 6058 WK ZN PAV MRK REMOV (TRAF BTN) TY Y EA 7,940.000 $2.000 $1.500 $2.250 $1.545 $1.550 $2.100 $2.320 $1.500 $1.710
662 6109 WK ZN PAV MRK SHT TERM (TAB)TY W EA 1,044.000 $1.000 $1.550 $0.600 $1.449 $0.800 $2.000 $1.230 $1.380 $0.970
662 6110 WK ZN PAV MRK SHT TERM (TAB)TY Y EA 2,941.000 $1.000 $1.550 $0.600 $1.449 $0.800 $2.000 $1.270 $1.380 $0.970
666 6030 REFL PAV MRK TY I (W)8"(DOT)(100MIL) LF 207.000 $1.200 $0.640 $1.050 $0.659 $0.700 $1.000 $1.550 $0.640 $0.730
666 6036 REFL PAV MRK TY I (W)8"(SLD)(100MIL) LF 1,973.000 $0.750 $0.640 $0.700 $0.659 $0.700 $0.670 $0.780 $0.640 $0.730
666 6303 RE PM W/RET REQ TY I (W)4"(SLD)(100MIL) LF 15,664.000 $0.250 $0.320 $0.350 $0.330 $0.350 $0.340 $0.390 $0.320 $0.360
666 6312 RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL) LF 1,732.000 $0.250 $0.320 $0.350 $0.330 $0.350 $0.340 $0.430 $0.320 $0.360
666 6315 RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) LF 19,408.000 $0.300 $0.320 $0.350 $0.330 $0.350 $0.340 $0.390 $0.320 $0.360
668 6074 PREFAB PAV MRK TY C (W) (12") (SLD) LF 823.000 $6.500 $6.000 $6.700 $6.180 $6.100 $6.330 $7.080 $6.000 $6.840
668 6076 PREFAB PAV MRK TY C (W) (24") (SLD) LF 1,294.000 $12.000 $12.000 $11.050 $12.360 $12.000 $10.430 $11.540 $12.000 $13.680
668 6077 PREFAB PAV MRK TY C (W) (ARROW) EA 28.000 $195.000 $200.000 $212.000 $206.000 $200.000 $200.000 $223.330 $200.000 $228.000
668 6085 PREFAB PAV MRK TY C (W) (WORD) EA 4.000 $250.000 $300.000 $233.200 $309.000 $300.000 $220.000 $265.290 $300.000 $342.000
672 6007 REFL PAV MRKR TY I-C EA 18.000 $3.000 $3.000 $4.250 $3.090 $3.000 $4.000 $4.920 $3.000 $3.420
672 6009 REFL PAV MRKR TY II-A-A EA 446.000 $3.000 $3.000 $3.650 $3.090 $3.000 $3.440 $3.800 $3.000 $3.420
677 6001 ELIM EXT PAV MRK & MRKS (4") LF 9,463.000 $0.500 $0.900 $1.050 $1.029 $0.750 $1.500 $1.140 $0.800 $2.280
760 6001 DITCH CLEANING AND RESHAPING (FOOT) LF 50.000 $1.500 $25.080 $13.300 $23.552 $18.000 $18.600 $18.600 $50.000 $136.670
764 6001 DRAIN INLET CLEANING EA 9.000 $1,500.000 $750.000 $323.300 $262.500 $1,000.000 $1,749.720 $1,749.720 $1,000.000 $1,710.000
764 6009 STORM SEWER CLEANING (PIPE)(25"-30"DIA) LF 290.000 $28.000 $20.000 $20.100 $29.400 $26.000 $50.840 $50.840 $22.000 $34.200
5001 6002 GEOGRID BASE REINFORCEMENT (TY II) SY 65,082.000 $1.600 $1.340 $1.500 $1.404 $1.500 $1.830 $1.830 $1.970 $1.100
6001 6002 PORTABLE CHANGEABLE MESSAGE SIGN EA 8.000 $9,000.000 $7,677.250 $229.500 $10,500.000 $10,000.000 $9,500.000 $19,830.000 $12,000.000 $13,680.000
6172 6001 SOLAR POWERED LED WARNING SIGN EA 4.000 $2,250.000 $2,850.000 $3,020.850 $2,935.500 $3,000.000 $2,850.000 $3,158.290 $2,850.000 $8,550.000
6176 6001 SOLAR POWERED LED STOP SIGN EA 4.000 $2,250.000 $2,850.000 $3,020.850 $2,935.500 $3,000.000 $2,850.000 $3,158.290 $2,850.000 $8,550.000
Totals: $4,807,490.60 $5,186,387.05 $5,451,747.33 $5,520,600.95 $5,546,964.30 $5,887,845.12 $6,108,187.05 $7,047,799.94 $7,742,442.38