Show Job Controls
Bid Cobra

JONES FM 600 (2032-03-013)

Items: 80

County: JONES
Length: N/A
Highway: FM 600
District: ABILENE
Control Number: 2032-03-013
DBE Goal: N/A
Project: F 2021(852)
Guaranty: N/A
Time: 154 WORKING DAYS
Engineer's Estimate: $4,052,876.80
Date: 08/04/2021 (4 years ago)
Contract Number: N/A
Type: REHABILITATION OF EXISTING ROADWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (6)
E
Engineer's Estimate
$4,052,876.80
$3,551,479.94
Over/Under Est: -12.37% -$501,396.86
$3,637,159.55
Over/Under Est: -10.26% -$415,717.25
Amt Left: 2.41% $85,679.61
Over/Under Est: -5.89% -$238,894.45
Amt Left: 7.39% $262,502.41
Delta: -4.86% -$176,822.80
$3,986,501.69
Over/Under Est: -1.64% -$66,375.11
Amt Left: 12.25% $435,021.75
Delta: -4.52% -$172,519.34
Over/Under Est: 0.7% $28,444.71
Amt Left: 14.92% $529,841.57
Delta: -2.38% -$94,819.82
$4,762,834.28
Over/Under Est: 17.52% $709,957.48
Amt Left: 34.11% $1,211,354.34
Delta: -16.70% -$681,512.77

Bid Items & Bid Tabulations

80 Total 0 of 80
JONES  |  FM 600  |  ABILENE  |  2032-03-013  |  08/04/2021  |  $4,052,876.80  |  F 2021(852)  |  REHAB OF EXIST ROADWAY  |  154 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
FOUTSCO PAVING COMPANY, LLC
A. L. HELMCAMP, INC.
NOBLES ROAD CONSTRUCTION, INC.
DUININCK, INC.
J. H. STRAIN & SONS, INC.
GILVIN-TERRILL, LTD.
BACKFILL (TY B)
STA 350.000 $350.000 $120.000 $140.000 $205.000 $240.000 $250.000 $200.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 15,000.000 $50.000 $44.000 $40.000 $48.000 $43.500 $39.500 $40.000
PLANE ASPH CONC PAV(0" TO 2")
SY 3,912.000 $2.000 $2.000 $5.000 $5.000 $5.350 $5.000 $4.500
STRUCT EXCAV
CY 651.000 $20.000 $15.000 $9.000 $18.000 $16.000 $15.000 $15.000
CUT & RESTORING PAV
SY 46.000 $125.000 $55.000 $110.000 $80.000 $58.000 $75.000 $55.000
FLOWABLE BACKFILL
CY 464.000 $160.000 $220.000 $175.000 $240.000 $230.000 $250.000 $220.000
TRENCH EXCAVATION PROTECTION
LF 84.000 $34.000 $25.000 $22.000 $28.000 $26.500 $15.000 $25.000
TEMPORARY SPL SHORING
SF 265.000 $35.000 $55.000 $48.000 $60.000 $58.000 $60.000 $55.000
CL C CONC (RAC-R)
CY 9.000 $1,619.000 $1,400.000 $2,300.000 $9.900 $1,600.000 $950.000 $1,400.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 20.000 $126.000 $125.000 $220.000 $93.000 $170.000 $125.000 $250.000
RIPRAP (MOW STRIP)(4 IN)
CY 30.000 $634.000 $575.000 $640.000 $650.000 $605.000 $775.000 $575.000
RAIL (TY T631)
LF 75.000 $79.000 $77.000 $110.000 $132.000 $94.500 $125.000 $120.000
CMP AR (GAL STL DES 3)
LF 103.000 $65.000 $100.000 $110.000 $110.000 $105.000 $75.000 $100.000
CONC BOX CULV (3 FT X 2 FT)
LF 58.000 $500.000 $315.000 $410.000 $345.000 $330.000 $450.000 $315.000
CONC BOX CULV (4 FT X 2 FT)
LF 176.000 $500.000 $370.000 $430.000 $405.000 $390.000 $475.000 $370.000
RC PIPE (CL III)(18 IN)
LF 190.000 $56.000 $80.000 $68.000 $90.000 $84.500 $250.000 $80.000
RC PIPE (CL III)(24 IN)
LF 58.000 $103.000 $110.000 $82.000 $120.000 $115.000 $375.000 $110.000
RC PIPE (CL III)(36 IN)
LF 58.000 $120.000 $220.000 $116.000 $240.000 $230.000 $425.000 $220.000
SET (TY I)(S=3 FT)(HW=2FT)(4:1)(C)
EA 2.000 $7,000.000 $4,000.000 $3,200.000 $4,400.000 $4,200.000 $10,300.000 $4,000.000
SET (TY I)(S= 4 FT)(HW= 2 FT)(4:1) (C)
EA 6.000 $6,500.000 $4,500.000 $4,250.000 $4,950.000 $4,700.000 $10,500.000 $4,500.000
SET (TY I)(S= 4 FT)(HW= 3 FT)(4:1) (C)
EA 2.000 $7,632.000 $5,800.000 $6,600.000 $6,380.000 $6,100.000 $10,500.000 $5,800.000
SET (TY I)(S= 5 FT)(HW= 2 FT)(4:1) (C)
EA 2.000 $8,000.000 $5,000.000 $5,000.000 $5,500.000 $5,300.000 $10,700.000 $5,000.000
SET (TY I)(S= 5 FT)(HW= 3 FT)(3:1) (C)
EA 4.000 $8,010.000 $5,250.000 $6,500.000 $5,775.000 $5,500.000 $10,700.000 $5,250.000
SET (TY I)(S= 5 FT)(HW= 3 FT)(4:1) (C)
EA 4.000 $6,833.000 $6,750.000 $6,500.000 $7,400.000 $7,100.000 $12,500.000 $6,750.000
SET (TY II) (18 IN) (CMP) (6: 1) (P)
EA 8.000 $978.000 $1,250.000 $850.000 $1,375.000 $1,300.000 $1,500.000 $1,250.000
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 8.000 $998.000 $1,000.000 $900.000 $1,100.000 $1,100.000 $1,375.000 $1,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 2.000 $1,500.000 $1,400.000 $900.000 $1,540.000 $1,500.000 $1,500.000 $1,400.000
SET (TY II) (21 IN) (CMP) (6: 1) (P)
EA 16.000 $1,200.000 $1,200.000 $1,100.000 $1,320.000 $1,300.000 $2,350.000 $1,200.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 2.000 $2,100.000 $1,200.000 $1,000.000 $1,320.000 $1,300.000 $1,900.000 $1,200.000
SET (TY II) (36 IN) (RCP) (4: 1) (C)
EA 2.000 $2,400.000 $3,500.000 $3,200.000 $3,850.000 $3,700.000 $4,550.000 $3,500.000
SET (TY II) (DES 3) (CMP) (6: 1) (P)
EA 8.000 $1,900.000 $3,500.000 $2,200.000 $3,850.000 $3,700.000 $3,800.000 $3,500.000
REMOV STR (SET)
EA 38.000 $1,000.000 $250.000 $320.000 $440.000 $265.000 $500.000 $250.000
REMOV STR (PIPE)
LF 525.000 $26.000 $12.000 $22.000 $13.000 $12.500 $12.000 $12.000
MOBILIZATION
LS 1.000 $305,510.000 $250,000.000 $290,000.000 $320,000.000 $360,000.000 $420,000.000 $480,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $7,500.000 $2,100.000 $8,500.000 $5,335.000 $18,500.000 $3,000.000 $16,500.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 70.000 $25.000 $27.000 $36.000 $27.000 $28.500 $30.000 $25.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 270.000 $28.000 $45.000 $37.000 $50.000 $47.500 $50.000 $35.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 50.000 $43.000 $59.000 $70.000 $62.000 $62.500 $70.000 $50.000
ROCK FILTER DAMS (REMOVE)
LF 390.000 $9.000 $10.000 $11.000 $11.000 $10.500 $10.000 $10.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 840.000 $6.000 $5.000 $5.500 $5.000 $5.300 $7.000 $6.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 840.000 $2.000 $1.250 $1.000 $1.000 $1.300 $2.000 $1.000
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 1.000 $2,780.000 $1.000 $7,500.000 $6,500.000 $10,000.000 $12,000.000 $5,000.000
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
LF 350.000 $25.000 $25.000 $25.000 $27.500 $21.500 $39.000 $25.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 1,050.000 $13.000 $15.000 $25.000 $16.500 $20.500 $25.000 $15.000
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 350.000 $17.000 $25.000 $25.000 $27.500 $21.500 $39.000 $25.000
PORT CTB CONNECT HARDWARE
EA 12.000 $54.000 $100.000 $40.000 $110.000 $130.000 $350.000 $100.000
RUMBLE STRIPS (SHOULDER)
LF 66,111.000 $0.200 $0.100 $0.180 $0.170 $0.070 $0.190 $0.160
RUMBLE STRIPS (CENTERLINE)
LF 35,000.000 $0.300 $0.100 $0.200 $0.170 $0.110 $0.190 $0.260
MTL W-BEAM GD FEN (TIM POST)
LF 100.000 $25.000 $24.000 $37.000 $36.300 $34.000 $30.000 $33.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,888.000 $2,650.000 $3,700.000 $3,740.000 $3,200.000 $3,500.000 $3,400.000
CRASH CUSH ATTEN (DES SOURCE)
EA 2.000 $2,102.000 $3,000.000 $1,500.000 $3,300.000 $4,700.000 $1,750.000 $3,000.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 6.000 $1,200.000 $2,000.000 $800.000 $2,200.000 $2,900.000 $750.000 $2,000.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $700.000 $1,500.000 $1,500.000 $1,650.000 $1,000.000 $750.000 $1,500.000
MAILBOX INSTALL-S (TWG-POST) TY 1
EA 34.000 $213.000 $220.000 $190.000 $290.000 $275.000 $275.000 $260.000
MAILBOX INSTALL-D (TWG-POST) TY 1
EA 7.000 $208.000 $240.000 $270.000 $310.000 $295.000 $300.000 $280.000
MAILBOX INSTALL-M (TWG-POST) TY 1
EA 5.000 $337.000 $300.000 $370.000 $440.000 $420.000 $375.000 $400.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 77.000 $539.000 $530.000 $740.000 $595.000 $570.000 $620.000 $540.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 10.000 $816.000 $680.000 $850.000 $935.000 $895.000 $825.000 $850.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 1.000 $700.000 $680.000 $950.000 $770.000 $740.000 $825.000 $700.000
REMOVE SM RD SN SUP&AM
EA 88.000 $105.000 $20.000 $78.000 $110.000 $105.000 $120.000 $100.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 12.000 $35.000 $23.000 $45.000 $55.000 $36.000 $40.000 $37.500
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 25.000 $78.000 $90.000 $85.000 $100.000 $95.000 $90.000 $90.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 232.000 $0.200 $1.250 $1.310 $1.400 $2.100 $4.400 $2.000
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 158.000 $0.300 $1.250 $1.310 $1.400 $2.100 $4.400 $2.000
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 398.000 $4.000 $6.000 $6.300 $6.600 $5.300 $4.500 $5.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 31,000.000 $2.000 $0.550 $0.580 $0.610 $0.740 $0.330 $0.700
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 768.000 $26.000 $5.350 $5.620 $5.900 $10.500 $3.300 $10.000
WK ZN PAV MRK REMOV (Y)4"(BRK)
LF 190.000 $0.800 $2.000 $2.100 $2.200 $2.100 $3.300 $2.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 6,100.000 $0.600 $1.000 $1.050 $1.100 $1.050 $0.330 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 3,500.000 $0.700 $1.000 $0.900 $1.400 $1.050 $2.100 $1.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 68,068.000 $0.300 $0.390 $0.410 $0.430 $0.460 $0.320 $0.440
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 5,918.000 $0.300 $0.390 $0.410 $0.430 $0.530 $0.320 $0.500
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 28,490.000 $0.400 $0.370 $0.390 $0.410 $0.460 $0.320 $0.440
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 70.000 $11.000 $15.000 $15.750 $16.500 $14.500 $22.000 $13.750
REFL PAV MRKR TY II-A-A
EA 653.000 $3.000 $5.000 $5.250 $5.500 $3.700 $4.400 $3.500
SP MIXES SP-D SAC-B PG70-22
TON 18,310.000 $100.000 $99.000 $94.000 $88.500 $95.550 $95.350 $125.000
TACK COAT
GAL 24,970.000 $3.000 $0.010 $2.500 $3.800 $2.750 $3.000 $12.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $8,000.000 $9,500.000 $13,000.000 $15,000.000 $10,500.000 $14,000.000 $15,000.000
TMA (STATIONARY)
DAY 142.000 $158.000 $1.000 $100.000 $125.000 $210.000 $275.000 $250.000
TMA (MOBILE OPERATION)
DAY 6.000 $103.000 $1.000 $100.000 $5,000.000 $950.000 $275.000 $950.000
Totals: $4,052,876.800 $3,551,479.940 $3,637,159.550 $3,813,982.350 $3,986,501.690 $4,081,321.510 $4,762,834.280