Show Job Controls
Bid Cobra

JONES CR (0908-24-050)

Items: 38

County: JONES
Length: N/A
Highway: CR
District: ABILENE
Control Number: 0908-24-050
DBE Goal: N/A
Project: BR 1902(092)
Guaranty: N/A
Time: 169 WORKING DAYS
Engineer's Estimate: $1,645,975.50
Date: 05/07/2020 (6 years ago)
Contract Number: N/A
Type: BRIDGE REPLACMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$1,645,975.50
$1,790,933.00
Over/Under Est: 8.81% $144,957.50
Over/Under Est: 23.35% $384,328.50
Amt Left: 13.37% $239,371.00
$2,876,259.00
Over/Under Est: 74.74% $1,230,283.50
Amt Left: 60.6% $1,085,326.00
Delta: -41.67% -$845,955.00
$2,906,029.00
Over/Under Est: 76.55% $1,260,053.50
Amt Left: 62.26% $1,115,096.00
Delta: -1.04% -$29,770.00
Over/Under Est: 77.57% $1,276,832.98
Amt Left: 63.2% $1,131,875.48
Delta: -0.58% -$16,779.48

Bid Items & Bid Tabulations

38 Total 0 of 38
JONES  |  CR  |  ABILENE  |  0908-24-050  |  05/07/2020  |  $1,645,975.50  |  BR 1902(092)  |  BRIDGE REPLACMENT  |  169 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
J. H. STRAIN & SONS, INC.
HODGES AND SON CONSTRUCTION COMPANY, INC.
EARTH BUILDERS, L.P.
FNH CONSTRUCTION, LLC
SALINAS CONSTRUCTION TECHNOLOGIES, LTD.
PREPARING ROW
STA 10.570 $1,500.000 $2,500.000 $4,300.000 $15,000.000 $18,950.000 $1,441.390
REMOVING STAB BASE AND ASPH PAV (2"-6")
STA 3.880 $250.000 $4,000.000 $2,500.000 $5,000.000 $11,000.000 $5,331.190
EXCAVATION (ROADWAY AND CHANNEL)
CY 2,426.000 $15.000 $25.000 $30.000 $25.000 $20.000 $19.460
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 1,458.000 $25.000 $25.000 $30.000 $25.000 $30.000 $15.280
SOIL RETENTION BLANKETS (CL 1) (TY D)
SY 1,972.000 $1.500 $2.250 $4.000 $6.000 $6.500 $2.000
FL BS (CMP IN PLC)(TY B GR 3)(FNAL POS)
CY 311.000 $45.000 $34.000 $70.000 $100.000 $60.000 $110.760
STRUCT EXCAV
CY 1,301.000 $15.000 $20.000 $20.000 $25.000 $50.000 $18.140
CEM STABIL BKFL
CY 52.000 $225.000 $225.000 $250.000 $480.000 $350.000 $174.300
TEMPORARY SPL SHORING
SF 1,186.000 $35.000 $50.000 $10.000 $15.000 $85.000 $111.210
DRILL SHAFT (24 IN)
LF 615.000 $150.000 $265.000 $195.000 $350.000 $185.000 $305.980
DRILL SHAFT (30 IN)
LF 60.000 $200.000 $820.000 $600.000 $800.000 $350.000 $1,453.330
CL C CONC (ABUT)
CY 40.800 $1,200.000 $1,000.000 $1,200.000 $1,600.000 $1,500.000 $1,495.570
CL C CONC (BENT)
CY 8.400 $1,200.000 $1,100.000 $1,500.000 $1,600.000 $1,500.000 $2,367.490
CL C CONC (FOOTING)
CY 15.200 $700.000 $1,000.000 $1,200.000 $1,600.000 $1,500.000 $933.550
REINF CONC SLAB (SLAB BEAM)
SF 2,860.000 $15.000 $25.000 $26.000 $30.000 $20.000 $39.400
PRESTR CONC SLAB BEAM (5SB12)
LF 295.000 $200.000 $175.000 $250.000 $250.000 $185.000 $227.100
PRESTR CONC SLAB BEAM (5SB15)
LF 247.500 $215.000 $190.000 $250.000 $250.000 $185.000 $252.600
RIPRAP (CONC)(5 IN)
CY 164.000 $600.000 $750.000 $500.000 $850.000 $550.000 $657.830
RAIL (TY T223)
LF 492.000 $120.000 $130.000 $140.000 $140.000 $185.000 $213.010
ARMOR JOINT (SEALED)
LF 88.000 $160.000 $100.000 $80.000 $130.000 $100.000 $235.810
WINGWALL (PW - 1) (HW=16 FT)
EA 2.000 $60,000.000 $60,000.000 $100,000.000 $100,000.000 $45,000.000 $149,034.170
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 3.000 $20,000.000 $12,000.000 $15,000.000 $30,000.000 $45,000.000 $21,848.310
REMOVE STR (RAIL)
LF 371.000 $25.000 $10.000 $15.000 $30.000 $50.000 $56.740
MOBILIZATION
LS 1.000 $140,000.000 $50,000.000 $180,000.000 $280,000.000 $300,000.000 $548,614.930
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $10,000.000 $2,000.000 $6,000.000 $4,000.000 $8,500.000 $2,537.450
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 284.000 $60.000 $40.000 $5.000 $55.000 $30.000 $49.880
ROCK FILTER DAMS (REMOVE)
LF 284.000 $10.000 $5.000 $1.000 $10.000 $15.000 $9.180
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 2,196.000 $6.000 $5.000 $5.000 $65.000 $18.000 $8.850
BIODEG EROSN CONT LOGS (REMOVE)
LF 2,196.000 $1.500 $1.000 $1.000 $2.000 $9.000 $1.150
MTL W-BEAM GD FEN (STEEL POST)
LF 288.000 $30.000 $31.000 $30.000 $35.000 $35.000 $31.170
MTL BEAM GD FEN TRANS (TL2)
EA 12.000 $1,200.000 $1,485.000 $1,500.000 $2,000.000 $1,850.000 $1,493.970
GUARDRAIL END TREATMENT (INSTALL)
EA 12.000 $3,300.000 $3,300.000 $3,000.000 $3,500.000 $2,850.000 $3,308.970
WIRE FENCE (TY C)
LF 909.000 $15.000 $22.000 $20.000 $35.000 $10.000 $22.120
REMOVE SM RD SN SUP&AM (SIGN ONLY)
EA 6.000 $100.000 $75.000 $100.000 $200.000 $450.000 $120.770
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 18.000 $25.000 $25.000 $50.000 $25.000 $100.000 $27.980
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 36.000 $45.000 $45.000 $50.000 $50.000 $100.000 $46.990
SP MIXES SP-B PG64-22
TON 710.000 $150.000 $200.000 $190.000 $250.000 $200.000 $185.650
PRECST C-SPAN CULV STR(26'X13.125'X48')
EA 1.000 $315,000.000 $410,000.000 $450,000.000 $600,000.000 $850,000.000 $549,506.680
Totals: $1,645,975.500 $1,790,933.000 $2,030,304.000 $2,876,259.000 $2,906,029.000 $2,922,808.502