JONES FM 707 (0484-01-023)

Items: 122

County: JONES
Length: N/A
Highway: FM 707
District: ABILENE
Control Number: 0484-01-023
DBE Goal: N/A
Project: STP 1802(504)HES
Guaranty: N/A
Time: 648 WORKING DAYS
Engineer's Estimate: $15,249,964.55
Date: 08/07/2018 (7 years ago)
Contract Number: N/A
Type: WIDEN ROADWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$15,249,964.55
$13,833,694.00
Over/Under Est: -9.29% -$1,416,270.55
$14,248,301.12
Over/Under Est: -6.57% -$1,001,663.43
Amt Left: 3% $414,607.12
$20,314,748.62
Over/Under Est: 33.21% $5,064,784.07
Amt Left: 46.85% $6,481,054.62
Delta: -42.58% -$6,066,447.50

Bid Items & Bid Tabulations

122 Total 0 of 122
JONES  |  FM 707  |  ABILENE  |  0484-01-023  |  08/07/2018  |  $15,249,964.55  |  STP 1802(504)HES  |  WIDEN ROADWAY  |  648 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
J. H. STRAIN & SONS, INC.
A. L. HELMCAMP, INC.
GILVIN-TERRILL, LTD.
PREPARING ROW
STA 1,724.000 $1,000.000 $75.000 $350.000 $500.000
REMOVING CONC (RIPRAP)
CY 3.000 $492.910 $100.000 $170.000 $110.000
REMOVING CONC (DRIVEWAYS)
SY 72.000 $66.000 $15.000 $40.000 $20.000
OBLITERATING ABANDONED ROAD
STA 4.510 $2,000.000 $3,000.000 $300.000 $1,000.000
EXCAVATION (CHANNEL)
CY 348.000 $15.000 $25.000 $13.000 $30.000
SUBGRADE WIDENING (ORD COMP)
STA 3,443.580 $424.000 $225.000 $80.000 $1,025.000
EMBANKMENT (ORIGINAL)(ORD COMP)(TY B)
CY 72,154.000 $5.000 $15.600 $14.500 $20.000
BACKFILL (TY A OR B)
STA 1,298.000 $119.500 $175.000 $368.000 $600.000
BROADCAST SEED (PERM) (RURAL) (SANDY)
AC 219.500 $361.000 $460.000 $450.000 $550.000
BROADCAST SEED (TEMP) (COOL)
AC 219.500 $445.000 $290.000 $300.000 $500.000
VEGETATIVE WATERING
MG 11,857.950 $59.300 $35.000 $8.000 $25.000
PROOF ROLLING
HR 460.000 $64.300 $75.000 $70.000 $75.000
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
CY 54,458.000 $36.200 $38.000 $54.000 $41.000
FL BS (CMP IN PLC)(TY D GR-1-2)(9")
SY 5,000.000 $9.190 $10.000 $15.000 $14.750
CEMENT
TON 45.000 $155.200 $200.000 $210.000 $160.000
CEM TRT (MX EXST MTL & NEW BS) (9"-13")
SY 5,000.000 $3.500 $4.750 $4.200 $15.000
PRIME COAT & BLOTTER (MC-30)
GAL 78,312.000 $4.100 $5.000 $4.800 $4.000
ASPH (MULTI OPTION)
GAL 84,368.000 $3.850 $4.500 $3.500 $2.750
AGGR(TY-PB GR-3 SAC-B)
CY 1,785.000 $70.000 $105.000 $155.000 $110.000
AGGR(TY-PB GR-4 SAC-B)
CY 3,403.000 $86.000 $105.000 $110.000 $110.000
ASPH (AC-20-5TR OR AC-20XP)
GAL 140,871.000 $3.050 $4.500 $4.200 $3.700
SUPERPAVE MIXTURES SP-D SAC-B PG70-22
TON 8,090.000 $120.000 $103.000 $96.000 $125.000
PLAN & TEXT ASPH CONC PAV(0" TO 2")
SY 14,395.000 $6.960 $3.000 $3.500 $4.000
CUT AND RESTORE PAV (FLEX BASE)
SY 49.000 $92.000 $125.000 $50.000 $125.000
FLOWABLE BACKFILL
CY 186.000 $288.890 $275.000 $300.000 $250.000
TEMPORARY SPL SHORING
SF 405.000 $5.000 $100.000 $40.000 $75.000
RIPRAP (CONC)(5 IN)
CY 64.000 $450.000 $650.000 $550.000 $750.000
RIPRAP (MOW STRIP)(4 IN)
CY 103.000 $695.500 $650.000 $500.000 $600.000
RAIL (TY T223)
LF 105.000 $110.000 $120.000 $160.000 $300.000
GABION MATTRESSES (GALV)(12 IN)
SY 282.000 $167.600 $100.000 $75.000 $150.000
CMP (GAL STL 18 IN)
LF 60.000 $41.400 $65.000 $50.000 $65.000
CMP (GAL STL 24 IN)
LF 1,001.000 $56.580 $70.000 $65.000 $70.000
CMP (GAL STL 30 IN)
LF 21.000 $86.440 $100.000 $80.000 $75.000
CMP (GAL STL 36 IN)
LF 68.000 $120.120 $115.000 $95.000 $80.000
CMP AR (GAL STL DES 3)
LF 1,494.000 $50.000 $80.000 $75.000 $70.000
CMP AR (GAL STL DES 4)
LF 598.000 $52.140 $110.000 $90.000 $75.000
CMP AR (GAL STL DES 5)
LF 324.000 $65.460 $150.000 $135.000 $80.000
CMP AR (GAL STL DES 6)
LF 231.000 $200.000 $210.000 $200.000 $90.000
CONC BOX CULV (7 FT X 3 FT)
LF 56.000 $318.930 $1,000.000 $475.000 $550.000
CONC BOX CULV (7 FT X 5 FT)
LF 56.000 $325.540 $1,100.000 $575.000 $650.000
CONC BOX CULV (4 FT X 4 FT)(EXTEND)
LF 128.000 $264.330 $550.000 $425.000 $850.000
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
LF 77.000 $308.630 $575.000 $475.000 $1,200.000
CONC BOX CULV (8 FT X 6 FT)(EXTEND)
LF 20.000 $745.580 $1,100.000 $900.000 $2,300.080
RC PIPE (CL III)(24 IN)
LF 85.000 $100.000 $180.000 $85.000 $120.000
HEADWALL (CH - PW - 0) (DIA= 36 IN)
EA 2.000 $5,257.140 $7,500.000 $8,000.000 $20,000.000
HEADWALL (CH - PW - A - 0) (DES= 3)
EA 2.000 $9,000.000 $4,200.000 $4,000.000 $10,000.000
HEADWALL (CH - PW - A - 0) (DES= 6)
EA 4.000 $5,482.000 $9,100.000 $9,000.000 $25,000.000
HEADWALL (CH - PW - A - S) (DES= 3)
EA 2.000 $6,320.000 $4,400.000 $4,500.000 $10,000.000
HEADWALL (CH - PW - A - S) (DES= 4)
EA 2.000 $9,963.000 $5,000.000 $5,500.000 $12,000.000
WINGWALL (FW - 0) (HW=11 FT)
EA 2.000 $23,000.000 $13,000.000 $20,000.000 $30,000.000
WINGWALL (FW - 0) (HW=8 FT)
EA 2.000 $7,500.000 $12,000.000 $16,000.000 $29,000.000
WINGWALL (PW - 2) (HW=5 FT)
EA 8.000 $7,488.890 $10,000.000 $10,000.000 $28,000.000
WINGWALL (PW - 2) (HW=6 FT)
EA 2.000 $11,360.000 $12,000.000 $13,000.000 $28,000.000
WINGWALL (PW - 2) (HW=7 FT)
EA 2.000 $13,250.000 $14,000.000 $21,000.000 $29,000.000
SET (TY II) (18 IN) (CMP) (3: 1) (C)
EA 8.000 $933.330 $1,000.000 $850.000 $2,000.000
SET (TY II) (24 IN) (CMP) (3: 1) (C)
EA 4.000 $1,513.880 $1,200.000 $950.000 $2,100.000
SET (TY II) (24 IN) (CMP) (6: 1) (P)
EA 64.000 $1,288.380 $1,500.000 $950.000 $2,300.000
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 28.000 $883.820 $1,800.000 $950.000 $2,350.000
SET (TY II) (30 IN) (CMP) (3: 1) (C)
EA 2.000 $1,200.000 $1,800.000 $2,000.000 $2,400.000
SET (TY II) (36 IN) (CMP) (3: 1) (C)
EA 10.000 $2,582.190 $2,000.000 $3,000.000 $3,000.000
SET (TY II) (DES 3) (CMP) (3: 1) (C)
EA 74.000 $1,200.000 $1,800.000 $950.000 $2,000.000
SET (TY II) (DES 3) (CMP) (6: 1) (P)
EA 76.000 $1,710.600 $1,700.000 $1,250.000 $2,500.000
SET (TY II) (DES 4) (CMP) (3: 1) (C)
EA 26.000 $1,350.000 $2,000.000 $2,700.000 $3,000.000
SET (TY II) (DES 4) (CMP) (6: 1) (P)
EA 24.000 $2,425.000 $2,800.000 $3,200.000 $4,500.000
SET (TY II) (DES 5) (CMP) (3: 1) (C)
EA 10.000 $3,000.000 $2,500.000 $3,200.000 $4,500.000
SET (TY II) (DES 5) (CMP) (6: 1) (P)
EA 16.000 $2,753.610 $3,500.000 $3,700.000 $5,500.000
SET (TY II) (DES 6) (CMP) (3: 1) (C)
EA 6.000 $3,450.000 $2,000.000 $4,800.000 $7,000.000
JACK BOR TUN BOX CULV (7 FT X 3 FT)
LF 60.000 $1,200.000 $1,800.000 $1,500.000 $2,000.000
JACK BOR TUN BOX CULV (7 FT X 5 FT)
LF 60.000 $3,408.000 $2,600.000 $1,900.000 $2,100.000
JACK BOR TUN BOX CULV (8 FT X 7 FT)
LF 72.000 $4,000.000 $3,000.000 $2,200.000 $2,200.000
REMOV STR (PIPE)
LF 3,072.000 $21.000 $20.000 $15.000 $50.000
REMOVE STR (CONC)
EA 3.000 $7,800.000 $6,500.000 $2,500.000 $4,000.000
MOBILIZATION
LS 1.000 $1,500,000.000 $1,250,000.000 $1,350,000.000 $2,000,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 36.000 $10,000.000 $2,700.000 $13,000.000 $5,500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 1,260.000 $34.100 $25.000 $25.000 $37.500
ROCK FILTER DAMS (REMOVE)
LF 1,260.000 $8.100 $10.000 $5.000 $10.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 2,003.000 $20.000 $10.000 $8.000 $32.000
CONSTRUCTION EXITS (REMOVE)
SY 2,003.000 $5.000 $5.000 $1.000 $10.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 52,052.000 $3.700 $3.500 $3.000 $2.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 52,052.000 $1.250 $1.500 $0.800 $0.800
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 13,330.000 $5.100 $5.000 $3.500 $6.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 13,330.000 $0.500 $1.000 $0.800 $0.600
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 3,000.000 $15.270 $15.000 $15.000 $10.000
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 600.000 $13.730 $35.000 $19.000 $10.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 600.000 $20.000 $35.000 $19.000 $10.000
INTERSECTIONS (SURF TREAT)
SY 623.000 $25.000 $20.000 $33.000 $37.000
DRIVEWAYS (SURF TREAT)
SY 31,992.000 $16.000 $20.000 $20.000 $37.000
TURNOUTS (SURF TREAT)
SY 2,249.000 $25.000 $20.000 $20.000 $37.000
MTL W-BEAM GD FEN (TIM POST)
LF 325.000 $25.350 $23.000 $23.000 $25.000
MTL W-BEAM GD FEN (STEEL POST)
LF 250.000 $25.680 $40.000 $38.000 $25.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 12.000 $2,200.000 $2,125.000 $2,100.000 $2,000.000
SHORT RADIUS
LF 25.000 $30.560 $30.000 $30.000 $35.000
REMOVE METAL BEAM GUARD FENCE
LF 125.000 $3.210 $2.250 $2.500 $3.000
REMOVE TERMINAL ANCHOR SECTION
EA 6.000 $250.000 $225.000 $250.000 $500.000
GUARDRAIL END TREATMENT (INSTALL)
EA 22.000 $2,217.730 $3,000.000 $3,000.000 $2,500.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 127.000 $500.000 $225.000 $200.000 $175.000
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 11.000 $500.000 $315.000 $280.000 $280.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 12.000 $500.000 $530.000 $470.000 $550.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 244.000 $752.000 $390.000 $280.000 $350.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 18.000 $869.740 $490.000 $480.000 $450.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 4.000 $963.510 $530.000 $510.000 $750.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 8.000 $1,134.880 $735.000 $710.000 $850.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 1.000 $1,061.990 $670.000 $650.000 $1,150.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 21.000 $739.960 $250.000 $250.000 $260.000
REMOVE SM RD SN SUP&AM
EA 278.000 $87.490 $50.000 $50.000 $40.000
INSTL DEL ASSM (D-SW)SZ 1(FLX)GF2(BI)
EA 72.000 $22.000 $28.000 $30.000 $30.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 30.000 $21.400 $22.000 $25.000 $25.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 112.000 $78.930 $60.000 $60.000 $40.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 142.000 $15.000 $10.000 $10.000 $25.000
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 22,020.000 $0.250 $0.350 $0.350 $0.350
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 64,944.000 $0.350 $0.330 $0.350 $0.350
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 7,591.000 $0.200 $2.000 $0.600 $1.000
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
LF 105.000 $1.190 $1.100 $2.100 $2.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 1,073.000 $8.910 $13.200 $6.800 $6.450
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
LF 339,420.000 $0.550 $0.770 $0.730 $0.680
REF PROF PAV MRK TY I(Y)4"(BRK)(100MIL)
LF 35,270.000 $0.550 $1.050 $1.000 $0.900
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
LF 108,294.000 $0.550 $0.770 $0.730 $0.680
REFL PAV MRKR TY II-A-A
EA 3,097.000 $6.400 $3.100 $3.800 $3.600
PORTABLE CHANGEABLE MESSAGE SIGN
EA 8.000 $10,155.000 $15,000.000 $4,000.000 $15,000.000
PREFORMED CENTERLINE RUMBLE STRIP
LF 9,875.000 $4.600 $4.500 $4.600 $4.500
TMA (STATIONARY)
DAY 544.000 $250.000 $250.000 $200.000 $345.000
TMA (MOBILE OPERATION)
DAY 20.000 $350.000 $500.000 $300.000 $950.000
Totals: $15,249,964.555 $13,833,694.000 $14,248,301.120 $20,314,748.620