Show Job Controls
Bid Cobra

JOHNSON IH0035W (6359-12-001)

Items: 39

County: JOHNSON
Length: N/A
Highway: IH0035W
District: FORT WORTH
Control Number: 6359-12-001
DBE Goal: N/A
Project: RMC - 635912001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $881,438.99
Date: 07/08/2020 (5 years ago)
Contract Number: N/A
Type: GUARDRAIL AND CABLE BARRIER REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$881,438.99
$609,442.00
Over/Under Est: -30.86% -$271,996.99
$667,392.00
Over/Under Est: -24.28% -$214,046.99
Amt Left: 9.51% $57,950.00
Over/Under Est: -19.29% -$170,038.99
Amt Left: 16.73% $101,958.00
Delta: -6.59% -$44,008.00

Bid Items & Bid Tabulations

39 Total 0 of 39
JOHNSON  |  IH0035W  |  FORT WORTH  |  6359-12-001  |  07/08/2020  |  $881,438.99  |  RMC - 635912001  |  GUARDRAIL AND CABLE BARRIER REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JCW CONSTRUCTION, LLC
VANN/ELLI, INC.
ELITE CASTLE RESOURCES LLC
MOBILIZATION (CALLOUT)
EA 12.000 $900.000 $1.000 $100.000 $100.000
MOBILIZATION (EMERGENCY)
EA 3.000 $1,000.000 $1.000 $100.000 $300.000
MTL W-BEAM GD FEN (TIM POST)
LF 35.000 $23.090 $100.000 $33.000 $30.000
MTL W-BEAM GD FEN (STEEL POST)
LF 5.000 $29.670 $100.000 $37.000 $30.000
TERMINAL ANCHOR SECTION
EA 2.000 $176.260 $1.000 $1.000 $100.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 15.000 $1,896.820 $1,700.000 $2,000.000 $1,800.000
MTL W-BEAM GD FEN ADJUSTMENT
LF 500.000 $15.460 $10.000 $22.000 $12.000
REMOVE METAL BEAM GUARD FENCE
LF 3,500.000 $2.200 $1.000 $1.000 $1.000
REMOVE TERMINAL ANCHOR SECTION
EA 2.000 $125.000 $200.000 $100.000 $150.000
GUARDRAIL END TREATMENT (INSTALL)
EA 6.000 $2,900.000 $1,500.000 $2,800.000 $3,100.000
GUARDRAIL END TREATMENT (MOVE & RESET)
EA 5.000 $133.380 $1,000.000 $500.000 $650.000
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $498.570 $500.000 $100.000 $100.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 9,000.000 $16.000 $12.500 $10.000 $15.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 275.000 $26.380 $40.000 $20.000 $20.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 200.000 $28.140 $40.000 $30.000 $20.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 500.000 $20.000 $25.000 $25.000 $25.000
RAISE RAIL ELEMENT
LF 150.000 $7.000 $10.000 $7.000 $6.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 1,100.000 $41.000 $55.750 $50.000 $50.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 50.000 $57.710 $75.000 $60.000 $60.000
REPAIR STEEL POST WITH BASE PLATE
EA 5.000 $126.340 $300.000 $300.000 $400.000
REMOVE & REPLACE BLOCKOUT
EA 1,000.000 $75.000 $5.000 $15.000 $8.000
REPLACE STL BLOCKOUTS W /WOOD BLOCKOUTS
EA 50.000 $1.000 $20.000 $20.000 $5.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 500.000 $7.000 $2.000 $15.000 $5.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 25.000 $56.860 $199.000 $100.000 $100.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 75.000 $3,100.000 $2,500.000 $2,800.000 $3,000.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 2.000 $953.490 $1,500.000 $800.000 $2,000.000
REM & RESET SGT IMPACT HEAD
EA 25.000 $71.220 $45.000 $50.000 $50.000
REPLACE POSTS (TL-4)
EA 600.000 $90.000 $110.000 $150.000 $100.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 20.000 $197.820 $100.000 $250.000 $250.000
REPAIR CONCRETE FOUNDATION (TL-4)
EA 5.000 $53.130 $100.000 $50.000 $50.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 20.000 $256.480 $500.000 $500.000 $500.000
REPLACE CABLE (TL-4)
LF 400.000 $5.480 $0.500 $4.000 $4.000
CHECK / RE-TENSION CABLE
EA 20.000 $193.580 $45.000 $300.000 $300.000
REPLACE POST HARDWARE (TL-4)
EA 600.000 $284.480 $13.250 $30.000 $35.000
POST AND CABLE FENCE (REPAIR)
LF 20.000 $8.840 $100.000 $5.000 $10.000
REMOVE AND REPLACE (TRACC)
EA 2.000 $4,978.690 $100.000 $15,000.000 $15,000.000
REPAIR (TRACC)
EA 2.000 $3,462.760 $5,050.000 $5,000.000 $3,800.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 10.000 $88.850 $300.000 $100.000 $100.000
TMA (STATIONARY)
DAY 150.000 $82.490 $250.000 $100.000 $300.000
Totals: $881,438.990 $609,442.000 $667,392.000 $711,400.000