Job Info for 2417-02-016

County: JOHNSON Highway: FM 2331 Date: 07/10/2018 (6 years ago) Engineer's Estimate: $1,640,815 Control Number: 2417-02-016
Project: STP 1802(382) District: FORT WORTH Time: 64 WORKING DAYS Type: BS REPR, MILL, OV, PAV MK, MBGF

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $1,640,814.92
PEACHTREE CONSTRUCTION, LTD.   $1,839,667.79 1
12.12% | $198,852.87
OLDCASTLE MATERIALS TEXAS, INC.   $1,937,190.11 2
18.06% | $296,375.19
5.3% | $97,522.32
BICK'S CONSTRUCTION, INC.   $2,074,023.28 3
26.4% | $433,208.36
12.74% | $234,355.49
7.06% | $136,833.17
NORTHEASTERN PAVERS, INC.   $2,833,260.30 4
72.67% | $1,192,445.38
54.01% | $993,592.51
36.61% | $759,237.02

Bid Items

Items: 27, 0 filtered
JOHNSON FM 2331  |  FORT WORTH  |  2417-02-016  |  07/10/2018  |  $1,640,815  |  STP 1802(382)  |  BS REPR, MILL, OV, PAV MK, MBGF  |  64 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate PEACHTREE CONSTRUCTION, LTD. OLDCASTLE MATERIALS TEXAS, INC. BICK'S CONSTRUCTION, INC. NORTHEASTERN PAVERS, INC.
134 6001 BACKFILL (TY A) STA 20.000 $200.000 $380.000 $530.000 $200.000 $350.000
305 6002 SALV, HAUL & STKPL RCL APH PV (0 TO 2") SY 110.000 $5.000 $40.000 $41.000 $7.250 $60.000
340 6246 D-GR HMA (SQ) TY-D PG64_22(LEVEL-UP) TON 2,050.000 $100.000 $94.000 $96.000 $111.000 $160.000
347 6001 TOM (ASPHALT) PG 76-22 TON 420.000 $200.000 $135.000 $135.000 $143.370 $185.000
347 6002 TOM-C (AGGREGATE) SAC-A TON 6,150.000 $100.000 $135.000 $135.000 $143.370 $185.000
351 6008 FLEXIBLE PAVEMENT STRUCTURE REPAIR(12") SY 7,200.000 $55.000 $67.000 $70.000 $86.400 $100.000
500 6001 MOBILIZATION LS 1.000 $105,380.420 $100,000.000 $132,800.000 $131,925.000 $300,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 3.000 $10,000.000 $5,000.000 $23,000.000 $615.000 $2,500.000
506 6042 BIODEG EROSN CONT LOGS (INSTL) (18") LF 500.000 $6.750 $10.000 $5.000 $5.000 $0.010
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 500.000 $1.000 $5.000 $1.000 $5.000 $0.010
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 600.000 $20.000 $21.000 $26.550 $22.750 $35.000
540 6006 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 7.000 $1,450.000 $1,600.000 $1,785.000 $1,886.000 $3,000.000
540 6014 SHORT RADIUS LF 50.000 $110.000 $40.000 $47.250 $40.500 $62.000
540 6015 DRIVEWAY TERMINAL ANCHOR SECTION EA 1.000 $750.000 $1,000.000 $1,035.000 $942.000 $1,450.000
542 6001 REMOVE METAL BEAM GUARD FENCE LF 600.000 $8.000 $4.400 $5.750 $3.000 $5.000
542 6004 RM MTL BM GD FENCE TRANS (THRIE-BEAM) EA 7.000 $200.000 $380.000 $253.000 $200.000 $310.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 8.000 $2,250.000 $2,800.000 $2,805.000 $2,750.000 $4,200.000
544 6003 GUARDRAIL END TREATMENT (REMOVE) EA 9.000 $250.000 $380.000 $253.000 $200.000 $300.000
662 6111 WK ZN PAV MRK SHT TERM (TAB)TY Y-2 EA 8,706.000 $1.000 $1.500 $1.060 $1.500 $1.000
666 6041 REFL PAV MRK TY I (W)12"(SLD)(090MIL) LF 140.000 $2.500 $3.100 $2.800 $2.780 $8.000
666 6302 RE PM W/RET REQ TY I (W)4"(SLD)(090MIL) LF 85,223.000 $0.500 $0.320 $0.300 $0.290 $0.350
666 6311 RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL) LF 7,440.000 $0.500 $0.390 $0.360 $0.350 $0.590
666 6314 RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL) LF 41,169.000 $0.500 $0.320 $0.300 $0.290 $0.350
668 6031 PREFAB PAV MRK TY B (W)(RR XING) EA 2.000 $950.000 $1,050.000 $955.000 $950.000 $675.000
672 6009 REFL PAV MRKR TY II-A-A EA 965.000 $2.500 $3.350 $3.050 $3.000 $3.500
6185 6002 TMA (STATIONARY) DAY 100.000 $600.000 $225.000 $112.000 $238.150 $750.000
6185 6003 TMA (MOBILE OPERATION) HR 15.000 $125.000 $35.000 $100.000 $50.000 $1,500.000
Totals: $1,640,814.92 $1,839,667.79 $1,937,190.11 $2,074,023.28 $2,833,260.30