JOHNSON FM 2258 (1599-03-016)

Items: 118

County: JOHNSON
Length: N/A
Highway: FM 2258
District: FORT WORTH
Control Number: 1599-03-016
DBE Goal: N/A
Project: F 2023(038)
Guaranty: N/A
Time: 278 WORKING DAYS
Engineer's Estimate: $10,666,769.60
Date: 03/08/2023 (3 years ago)
Contract Number: N/A
Type: RESURFACE ROADWAY
Mail/Deliver Bids To: N/A
JANET CRAWFORD
MARVIN GARCIA
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$10,666,769.60
$13,791,080.42
Over/Under Est: 29.29% $3,124,310.82
Over/Under Est: 99.12% $10,572,561.40
Amt Left: 54.01% $7,448,250.58
Subcontractor Percentage Amount
NORTHEASTERN PAVERS, LLC 17.80% $2,456,839.03
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. 6.54% $902,681.31
RAMBO CONTRACTING, INC. 2.75% $379,567.83
JR WEST TEXAS CONCRETE LLC 2.09% $288,471.55
FARR FOUNDATION, INC. 1.83% $252,585.14
DIIBS SPECIALISTS, LLC 1.74% $240,162.92
TRP CONSTRUCTION GROUP, LLC 0.46% $63,491.35
MARCOMS CONSTRUCTION LLC 0.36% $49,688.88
MULHOLLAND ENERGY SERVICES, LLC 0.11% $15,182.71
WEST TEXAS ROCK RESOURCES, LLC 0.05% $6,901.23
MIDWAY STRIPING & SEALCOATING 0.03% $4,140.74
Total: 33.76% $4,659,712.69

Bid Items & Bid Tabulations

118 Total 0 of 118
JOHNSON  |  FM 2258  |  FORT WORTH  |  1599-03-016  |  03/08/2023  |  $10,666,769.60  |  F 2023(038)  |  RESURF ROADWAY  |  278 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JAY MILLS CONTRACTING, INCORPORATED
ED BELL CONSTRUCTION COMPANY
PREPARING ROW
STA 192.500 $617.000 $2,500.000 $10,500.000
REMOVING CONC (DRIVEWAYS)
SY 90.000 $10.000 $25.000 $50.000
REMOVE STAB BASE & ASPH PAV (13"-18")
SY 48,495.000 $5.370 $7.000 $10.000
EXCAVATION (ROADWAY)
CY 28,925.000 $8.500 $16.000 $17.500
EMBANKMENT (FINAL)(DENS CONT)(TY D)
CY 14,915.000 $10.500 $25.000 $13.650
EMBANKMENT (VEHICLE)(DENS CONT)(TY B)
CY 18,755.000 $21.500 $31.000 $31.500
BACKFILL (TY B)
STA 192.500 $175.000 $460.000 $420.000
COMPOST MANUF TOPSOIL (4")
SY 95,206.000 $1.360 $7.750 $11.000
BLOCK SODDING
SY 208.000 $5.500 $11.500 $11.000
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 95,206.000 $0.240 $0.250 $0.230
BROADCAST SEED (TEMP) (WARM)
SY 47,603.000 $0.250 $0.200 $0.190
BROADCAST SEED (TEMP) (COOL)
SY 47,603.000 $0.250 $0.200 $0.190
DRILL SEED (TEMP)(WARM OR COOL)
SY 95,206.000 $0.190 $0.200 $0.190
DRILL SEEDING (PERM)(WARM OR COOL)
SY 95,206.000 $0.230 $0.250 $0.240
VEGETATIVE WATERING
MG 6,665.540 $25.000 $42.250 $19.020
WILDFLOWER SEEDING
AC 20.100 $4,137.430 $3,400.000 $3,287.080
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 10,902.000 $80.000 $86.000 $124.400
REWORK BS MTL (TY B)(18")(DENS CONT)
SY 2,667.000 $5.250 $8.000 $7.500
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
TON 3,123.000 $185.000 $285.000 $504.940
LIME TRT (EXIST MATL)(18")
SY 83,268.000 $9.000 $6.250 $16.800
PRIME COAT (MULTI OPTION)
GAL 25,689.000 $4.000 $6.250 $5.870
ASPH (AC-10)
GAL 44,579.000 $5.000 $4.750 $4.650
AGGR(TY-PB GR-4 SAC-B)
CY 634.000 $166.000 $250.000 $250.000
PLANE ASPH CONC PAV (2")
SY 1,778.000 $3.000 $7.000 $5.120
CUT & RESTORING PAV
SY 103.000 $130.000 $465.000 $210.000
TRENCH EXCAVATION PROTECTION
LF 180.000 $5.500 $10.000 $20.000
TEMPORARY SPL SHORING
SF 5,079.700 $40.000 $80.000 $73.500
CL B CONC (MISC)
CY 3.000 $575.000 $1,600.000 $1,365.000
RIPRAP (CONC)(5 IN)
CY 110.000 $630.000 $1,100.000 $630.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 5,094.000 $160.000 $150.000 $175.000
RIPRAP (MOW STRIP)(4 IN)
CY 506.000 $745.040 $950.000 $575.000
CONC BOX CULV (4 FT X 4 FT)
LF 91.000 $407.000 $425.000 $687.070
CONC BOX CULV (6 FT X 4 FT)
LF 64.000 $600.000 $645.000 $809.920
CONC BOX CULV (6 FT X 6 FT)
LF 138.000 $950.000 $665.000 $855.040
RC PIPE (CL III)(18 IN)
LF 287.000 $130.000 $85.000 $112.820
RC PIPE (CL III)(36 IN)
LF 89.000 $230.000 $175.000 $346.970
RC PIPE (CL III)(42 IN)
LF 78.000 $250.000 $240.000 $636.390
RC PIPE (CL III)(48 IN)
LF 80.000 $275.000 $320.000 $666.070
INLT (COMPL)(AD)(5'X 4'-3' X 3')(FTW)
EA 1.000 $8,000.000 $10,500.000 $17,983.310
HEADWALL (CH - FW - 0) (DIA= 36 IN)
EA 1.000 $8,250.000 $4,000.000 $8,345.070
HEADWALL (CH - PW - 0) (DIA= 36 IN)
EA 2.000 $9,500.000 $7,500.000 $12,954.060
HEADWALL (CH - PW - 0) (DIA= 48 IN)
EA 2.000 $13,000.000 $13,000.000 $20,981.570
HEADWALL (CH - PW - S) (DIA= 42 IN)
EA 2.000 $12,500.000 $13,500.000 $20,987.070
HEADWALL (CH - PW - S) (DIA= 48 IN)
EA 2.000 $13,500.000 $18,500.000 $28,956.570
WINGWALL (PW - 2) (HW=6 FT)
EA 1.000 $18,000.000 $21,500.000 $22,739.120
WINGWALL (PW - 2) (HW=7 FT)
EA 1.000 $26,000.000 $30,000.000 $29,474.420
WINGWALL (PW - 2) (HW=8 FT)
EA 4.000 $30,000.000 $32,000.000 $37,006.070
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 16.000 $1,370.000 $1,600.000 $1,788.810
CLEAN EXIST CULVERTS
EA 18.000 $2,400.000 $3,500.000 $4,881.230
REMOV STR (INLET)
EA 1.000 $1,000.000 $1,600.000 $1,554.370
REMOV STR (WINGWALL)
EA 4.000 $1,600.000 $2,000.000 $6,217.520
REMOV STR (HEADWALL)
EA 6.000 $1,600.000 $2,000.000 $3,108.760
REMOV STR (PIPE)
LF 436.000 $16.500 $27.000 $28.520
REMOV STR (BOX CULVERT)
LF 60.000 $64.000 $80.000 $207.250
MOBILIZATION
LS 1.000 $968,828.110 $1,300,000.000 $4,000,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 13.000 $12,000.000 $20,000.000 $52,500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 400.000 $40.000 $50.000 $49.500
ROCK FILTER DAMS (REMOVE)
LF 400.000 $15.500 $17.000 $27.500
TEMP SEDMT CONT FENCE (INSTALL)
LF 6,160.000 $3.000 $4.500 $2.200
TEMP SEDMT CONT FENCE (REMOVE)
LF 6,160.000 $0.850 $1.000 $0.550
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 1,560.000 $6.000 $8.250 $4.400
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,560.000 $1.370 $1.250 $1.930
CONSTRUCTING DETOURS
SY 59.000 $91.000 $200.000 $224.180
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 13.000 $7,000.000 $6,000.000 $6,300.000
PORT CTB (DES SOURCE)(LOW PROF)(TY 1)
LF 640.000 $25.000 $18.000 $40.000
PORT CTB (DES SOURCE)(LOW PROF)(TY 2)
LF 80.000 $25.000 $20.000 $80.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 5,640.000 $15.000 $15.000 $40.000
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 520.000 $15.000 $19.000 $80.000
PORT CTB (STKPL)(LOW PROF)(TY 1)
LF 240.000 $20.000 $12.000 $40.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 640.000 $25.000 $15.000 $40.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 80.000 $25.000 $20.000 $80.000
DRIVEWAYS (ACP)(TYPE 1)
SY 80.000 $71.000 $95.000 $60.000
DRIVEWAYS (CONC)(TYPE 1)
SY 90.000 $110.000 $170.000 $210.610
DRIVEWAYS (ACP) (TYPE 2)
SY 525.000 $50.000 $70.000 $66.000
INTERSECTIONS (ACP) (TYPE 1)
SY 669.000 $50.000 $95.000 $63.000
RUMBLE STRIPS (SHOULDER)
LF 38,081.000 $0.260 $0.200 $0.300
RUMBLE STRIPS (CENTERLINE)
LF 18,580.000 $0.350 $0.200 $0.300
MTL W-BEAM GD FEN (TIM POST)
LF 4,609.000 $25.000 $25.000 $22.550
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,300.000 $1,900.000 $3,046.660
TL-3 31" SHORT RADIUS (END ANCHOR)
EA 4.000 $220.000 $14,500.000 $1,100.000
REMOVE METAL BEAM GUARD FENCE
LF 1,338.000 $5.500 $2.250 $2.750
REMOVE TERMINAL ANCHOR SECTION
EA 2.000 $335.890 $280.000 $137.500
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 12.000 $177.500 $280.000 $137.500
GUARDRAIL END TREATMENT (INSTALL)
EA 24.000 $3,100.000 $3,300.000 $2,887.500
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 5.000 $260.000 $360.000 $302.500
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 2.000 $270.000 $450.000 $308.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 33.000 $552.000 $900.000 $709.500
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 3.000 $650.000 $1,000.000 $869.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 2.000 $750.000 $950.000 $759.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U-EXAL)
EA 2.000 $780.000 $1,100.000 $1,001.000
IN SM RD SN SUP&AM TYS80(1)SA(U-EXAL)
EA 2.000 $895.000 $1,500.000 $1,815.000
REMOVE SM RD SN SUP&AM
EA 37.000 $95.000 $115.000 $110.000
INSTL OM ASSM (OM-2X)(WC)GND
EA 8.000 $72.000 $100.000 $61.050
INSTL OM ASSM (OM-3L)(TWT)GND
EA 13.000 $310.000 $355.000 $269.500
INSTL OM ASSM (OM-3R)(TWT)GND
EA 11.000 $304.000 $355.000 $269.500
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 72.000 $38.000 $27.000 $28.050
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 2,040.000 $1.000 $0.650 $0.610
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 5,807.000 $0.750 $0.550 $0.470
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 28,996.000 $0.750 $0.450 $0.300
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 4,460.000 $1.250 $0.950 $1.240
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 340.000 $14.000 $12.750 $11.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 3,946.000 $2.500 $2.000 $3.000
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 1,459.000 $2.500 $2.000 $3.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,936.000 $2.500 $2.000 $3.000
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
LF 90.000 $1.000 $2.250 $2.200
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 200.000 $7.000 $4.500 $6.600
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 57.000 $202.000 $8.500 $13.200
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 38,565.000 $0.500 $0.550 $0.520
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 2,270.000 $0.520 $0.650 $0.580
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 24,453.000 $0.500 $0.550 $0.520
PREFAB PAV MRK TY B (Y)(4")(BRK)CNTST
LF 100.000 $8.000 $17.000 $27.500
REFL PAV MRKR TY II-A-A
EA 431.000 $5.000 $5.550 $5.500
D-GR HMA TY-C PG64-28
TON 8,926.000 $110.000 $120.000 $142.670
SP MIXES SP-C SAC-A PG70-28
TON 8,926.000 $130.000 $153.000 $173.200
TACK COAT
GAL 12,776.000 $5.200 $0.010 $0.010
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 5.000 $12,800.000 $200.000 $500.000
TMA (STATIONARY)
DAY 142.000 $187.000 $150.000 $200.000
TMA (MOBILE OPERATION)
DAY 49.000 $300.000 $350.000 $800.000
Totals: $10,666,769.603 $13,791,080.425 $21,239,331.009