PREPARING ROW
|
STA
|
192.500
|
$617.000
|
$2,500.000
|
$10,500.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
90.000
|
$10.000
|
$25.000
|
$50.000
|
|
|
REMOVE STAB BASE & ASPH PAV (13"-18")
|
SY
|
48,495.000
|
$5.370
|
$7.000
|
$10.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
28,925.000
|
$8.500
|
$16.000
|
$17.500
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY D)
|
CY
|
14,915.000
|
$10.500
|
$25.000
|
$13.650
|
|
|
EMBANKMENT (VEHICLE)(DENS CONT)(TY B)
|
CY
|
18,755.000
|
$21.500
|
$31.000
|
$31.500
|
|
|
BACKFILL (TY B)
|
STA
|
192.500
|
$175.000
|
$460.000
|
$420.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
95,206.000
|
$1.360
|
$7.750
|
$11.000
|
|
|
BLOCK SODDING
|
SY
|
208.000
|
$5.500
|
$11.500
|
$11.000
|
|
|
BROADCAST SEED (PERM) (RURAL) (CLAY)
|
SY
|
95,206.000
|
$0.240
|
$0.250
|
$0.230
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
47,603.000
|
$0.250
|
$0.200
|
$0.190
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
47,603.000
|
$0.250
|
$0.200
|
$0.190
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
95,206.000
|
$0.190
|
$0.200
|
$0.190
|
|
|
DRILL SEEDING (PERM)(WARM OR COOL)
|
SY
|
95,206.000
|
$0.230
|
$0.250
|
$0.240
|
|
|
VEGETATIVE WATERING
|
MG
|
6,665.540
|
$25.000
|
$42.250
|
$19.020
|
|
|
WILDFLOWER SEEDING
|
AC
|
20.100
|
$4,137.430
|
$3,400.000
|
$3,287.080
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
|
CY
|
10,902.000
|
$80.000
|
$86.000
|
$124.400
|
|
|
REWORK BS MTL (TY B)(18")(DENS CONT)
|
SY
|
2,667.000
|
$5.250
|
$8.000
|
$7.500
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
3,123.000
|
$185.000
|
$285.000
|
$504.940
|
|
|
LIME TRT (EXIST MATL)(18")
|
SY
|
83,268.000
|
$9.000
|
$6.250
|
$16.800
|
|
|
PRIME COAT (MULTI OPTION)
|
GAL
|
25,689.000
|
$4.000
|
$6.250
|
$5.870
|
|
|
ASPH (AC-10)
|
GAL
|
44,579.000
|
$5.000
|
$4.750
|
$4.650
|
|
|
AGGR(TY-PB GR-4 SAC-B)
|
CY
|
634.000
|
$166.000
|
$250.000
|
$250.000
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
1,778.000
|
$3.000
|
$7.000
|
$5.120
|
|
|
CUT & RESTORING PAV
|
SY
|
103.000
|
$130.000
|
$465.000
|
$210.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
180.000
|
$5.500
|
$10.000
|
$20.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
5,079.700
|
$40.000
|
$80.000
|
$73.500
|
|
|
CL B CONC (MISC)
|
CY
|
3.000
|
$575.000
|
$1,600.000
|
$1,365.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
110.000
|
$630.000
|
$1,100.000
|
$630.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
5,094.000
|
$160.000
|
$150.000
|
$175.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
506.000
|
$745.040
|
$950.000
|
$575.000
|
|
|
CONC BOX CULV (4 FT X 4 FT)
|
LF
|
91.000
|
$407.000
|
$425.000
|
$687.070
|
|
|
CONC BOX CULV (6 FT X 4 FT)
|
LF
|
64.000
|
$600.000
|
$645.000
|
$809.920
|
|
|
CONC BOX CULV (6 FT X 6 FT)
|
LF
|
138.000
|
$950.000
|
$665.000
|
$855.040
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
287.000
|
$130.000
|
$85.000
|
$112.820
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
89.000
|
$230.000
|
$175.000
|
$346.970
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
78.000
|
$250.000
|
$240.000
|
$636.390
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
80.000
|
$275.000
|
$320.000
|
$666.070
|
|
|
INLT (COMPL)(AD)(5'X 4'-3' X 3')(FTW)
|
EA
|
1.000
|
$8,000.000
|
$10,500.000
|
$17,983.310
|
|
|
HEADWALL (CH - FW - 0) (DIA= 36 IN)
|
EA
|
1.000
|
$8,250.000
|
$4,000.000
|
$8,345.070
|
|
|
HEADWALL (CH - PW - 0) (DIA= 36 IN)
|
EA
|
2.000
|
$9,500.000
|
$7,500.000
|
$12,954.060
|
|
|
HEADWALL (CH - PW - 0) (DIA= 48 IN)
|
EA
|
2.000
|
$13,000.000
|
$13,000.000
|
$20,981.570
|
|
|
HEADWALL (CH - PW - S) (DIA= 42 IN)
|
EA
|
2.000
|
$12,500.000
|
$13,500.000
|
$20,987.070
|
|
|
HEADWALL (CH - PW - S) (DIA= 48 IN)
|
EA
|
2.000
|
$13,500.000
|
$18,500.000
|
$28,956.570
|
|
|
WINGWALL (PW - 2) (HW=6 FT)
|
EA
|
1.000
|
$18,000.000
|
$21,500.000
|
$22,739.120
|
|
|
WINGWALL (PW - 2) (HW=7 FT)
|
EA
|
1.000
|
$26,000.000
|
$30,000.000
|
$29,474.420
|
|
|
WINGWALL (PW - 2) (HW=8 FT)
|
EA
|
4.000
|
$30,000.000
|
$32,000.000
|
$37,006.070
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
16.000
|
$1,370.000
|
$1,600.000
|
$1,788.810
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
18.000
|
$2,400.000
|
$3,500.000
|
$4,881.230
|
|
|
REMOV STR (INLET)
|
EA
|
1.000
|
$1,000.000
|
$1,600.000
|
$1,554.370
|
|
|
REMOV STR (WINGWALL)
|
EA
|
4.000
|
$1,600.000
|
$2,000.000
|
$6,217.520
|
|
|
REMOV STR (HEADWALL)
|
EA
|
6.000
|
$1,600.000
|
$2,000.000
|
$3,108.760
|
|
|
REMOV STR (PIPE)
|
LF
|
436.000
|
$16.500
|
$27.000
|
$28.520
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
60.000
|
$64.000
|
$80.000
|
$207.250
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$968,828.110
|
$1,300,000.000
|
$4,000,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
13.000
|
$12,000.000
|
$20,000.000
|
$52,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
400.000
|
$40.000
|
$50.000
|
$49.500
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
400.000
|
$15.500
|
$17.000
|
$27.500
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
6,160.000
|
$3.000
|
$4.500
|
$2.200
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
6,160.000
|
$0.850
|
$1.000
|
$0.550
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
1,560.000
|
$6.000
|
$8.250
|
$4.400
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,560.000
|
$1.370
|
$1.250
|
$1.930
|
|
|
CONSTRUCTING DETOURS
|
SY
|
59.000
|
$91.000
|
$200.000
|
$224.180
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
13.000
|
$7,000.000
|
$6,000.000
|
$6,300.000
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 1)
|
LF
|
640.000
|
$25.000
|
$18.000
|
$40.000
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 2)
|
LF
|
80.000
|
$25.000
|
$20.000
|
$80.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
5,640.000
|
$15.000
|
$15.000
|
$40.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
520.000
|
$15.000
|
$19.000
|
$80.000
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 1)
|
LF
|
240.000
|
$20.000
|
$12.000
|
$40.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
640.000
|
$25.000
|
$15.000
|
$40.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
80.000
|
$25.000
|
$20.000
|
$80.000
|
|
|
DRIVEWAYS (ACP)(TYPE 1)
|
SY
|
80.000
|
$71.000
|
$95.000
|
$60.000
|
|
|
DRIVEWAYS (CONC)(TYPE 1)
|
SY
|
90.000
|
$110.000
|
$170.000
|
$210.610
|
|
|
DRIVEWAYS (ACP) (TYPE 2)
|
SY
|
525.000
|
$50.000
|
$70.000
|
$66.000
|
|
|
INTERSECTIONS (ACP) (TYPE 1)
|
SY
|
669.000
|
$50.000
|
$95.000
|
$63.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
38,081.000
|
$0.260
|
$0.200
|
$0.300
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
18,580.000
|
$0.350
|
$0.200
|
$0.300
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
4,609.000
|
$25.000
|
$25.000
|
$22.550
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,300.000
|
$1,900.000
|
$3,046.660
|
|
|
TL-3 31" SHORT RADIUS (END ANCHOR)
|
EA
|
4.000
|
$220.000
|
$14,500.000
|
$1,100.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,338.000
|
$5.500
|
$2.250
|
$2.750
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
2.000
|
$335.890
|
$280.000
|
$137.500
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
12.000
|
$177.500
|
$280.000
|
$137.500
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
24.000
|
$3,100.000
|
$3,300.000
|
$2,887.500
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
5.000
|
$260.000
|
$360.000
|
$302.500
|
|
|
MAILBOX INSTALL-D (TWW-POST) TY 4
|
EA
|
2.000
|
$270.000
|
$450.000
|
$308.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
33.000
|
$552.000
|
$900.000
|
$709.500
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
3.000
|
$650.000
|
$1,000.000
|
$869.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$750.000
|
$950.000
|
$759.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U-EXAL)
|
EA
|
2.000
|
$780.000
|
$1,100.000
|
$1,001.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-EXAL)
|
EA
|
2.000
|
$895.000
|
$1,500.000
|
$1,815.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
37.000
|
$95.000
|
$115.000
|
$110.000
|
|
|
INSTL OM ASSM (OM-2X)(WC)GND
|
EA
|
8.000
|
$72.000
|
$100.000
|
$61.050
|
|
|
INSTL OM ASSM (OM-3L)(TWT)GND
|
EA
|
13.000
|
$310.000
|
$355.000
|
$269.500
|
|
|
INSTL OM ASSM (OM-3R)(TWT)GND
|
EA
|
11.000
|
$304.000
|
$355.000
|
$269.500
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
72.000
|
$38.000
|
$27.000
|
$28.050
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
2,040.000
|
$1.000
|
$0.650
|
$0.610
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
5,807.000
|
$0.750
|
$0.550
|
$0.470
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
28,996.000
|
$0.750
|
$0.450
|
$0.300
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
4,460.000
|
$1.250
|
$0.950
|
$1.240
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
340.000
|
$14.000
|
$12.750
|
$11.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
3,946.000
|
$2.500
|
$2.000
|
$3.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
1,459.000
|
$2.500
|
$2.000
|
$3.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
1,936.000
|
$2.500
|
$2.000
|
$3.000
|
|
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
|
LF
|
90.000
|
$1.000
|
$2.250
|
$2.200
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
200.000
|
$7.000
|
$4.500
|
$6.600
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
57.000
|
$202.000
|
$8.500
|
$13.200
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
38,565.000
|
$0.500
|
$0.550
|
$0.520
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
2,270.000
|
$0.520
|
$0.650
|
$0.580
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
24,453.000
|
$0.500
|
$0.550
|
$0.520
|
|
PREFAB PAV MRK TY B (Y)(4")(BRK)CNTST
|
LF
|
100.000
|
$8.000
|
$17.000
|
$27.500
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
431.000
|
$5.000
|
$5.550
|
$5.500
|
|
|
D-GR HMA TY-C PG64-28
|
TON
|
8,926.000
|
$110.000
|
$120.000
|
$142.670
|
|
|
SP MIXES SP-C SAC-A PG70-28
|
TON
|
8,926.000
|
$130.000
|
$153.000
|
$173.200
|
|
|
TACK COAT
|
GAL
|
12,776.000
|
$5.200
|
$0.010
|
$0.010
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
5.000
|
$12,800.000
|
$200.000
|
$500.000
|
|
|
TMA (STATIONARY)
|
DAY
|
142.000
|
$187.000
|
$150.000
|
$200.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
49.000
|
$300.000
|
$350.000
|
$800.000
|
|
Totals: |
$10,666,769.603
|
$13,791,080.425
|
$21,239,331.009
|