Show Job Controls
Bid Cobra

JOHNSON FM 917 (1181-02-040)

Items: 63

County: JOHNSON
Length: N/A
Highway: FM 917
District: FORT WORTH
Control Number: 1181-02-040
DBE Goal: N/A
Project: STP 2022(872)HES
Guaranty: N/A
Time: 150 WORKING DAYS
Engineer's Estimate: $2,321,530.92
Date: 08/04/2022 (3 years ago)
Contract Number: N/A
Type: HAZARD ELIMINATION & SAFETY
Mail/Deliver Bids To: N/A
JANET CRAWFORD
ALFREDO LUERA
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$2,321,530.92
Over/Under Est: -1.54% -$35,725.61
Over/Under Est: 6.6% $153,263.22
Amt Left: 8.27% $188,988.83
Over/Under Est: 21.76% $505,122.87
Amt Left: 23.66% $540,848.48
Delta: -14.22% -$351,859.65
Over/Under Est: 38.76% $899,907.24
Amt Left: 40.93% $935,632.85
Delta: -13.97% -$394,784.37

Bid Items & Bid Tabulations

63 Total 0 of 63
JOHNSON  |  FM 917  |  FORT WORTH  |  1181-02-040  |  08/04/2022  |  $2,321,530.92  |  STP 2022(872)HES  |  HAZARD ELIM & SAFETY  |  150 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JAY MILLS CONTRACTING, INCORPORATED
ED BELL CONSTRUCTION COMPANY
KNIFE RIVER CORPORATION - SOUTH
EUROVIA ATLANTIC COAST LLC
PREPARING ROW
STA 36.990 $2,500.000 $750.000 $5,000.000 $1,500.000 $250.000
REMOVING STAB BASE AND ASPH PAV(8")
SY 354.000 $15.000 $14.000 $15.000 $10.000 $25.000
OBLITERATING ABANDONED ROAD
STA 4.590 $1,000.000 $2,000.000 $1,000.000 $1,500.000 $2,605.000
EXCAVATION (ROADWAY)
CY 2,741.000 $13.000 $12.000 $3.150 $20.000 $16.000
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 22,866.000 $11.000 $16.000 $13.650 $22.000 $40.000
BACKFILL (TY A)
STA 36.990 $275.000 $350.000 $200.000 $250.000 $300.000
BLOCK SODDING
SY 22,872.000 $3.000 $4.750 $4.600 $4.250 $4.100
BROADCAST SEED (TEMP) (WARM)
SY 11,436.000 $0.300 $0.630 $0.100 $0.320 $0.310
BROADCAST SEED (TEMP) (COOL)
SY 11,436.000 $0.300 $0.630 $0.100 $0.320 $0.310
VEGETATIVE WATERING
MG 801.300 $25.000 $25.000 $10.500 $40.000 $45.000
WILDFLOWER SEEDING
AC 4.730 $1,115.000 $4,200.000 $1,650.000 $1,700.000 $1,625.000
PLANT MATERIAL (15 GAL) (SHRUB)
EA 8.000 $200.000 $500.000 $1,155.000 $2,450.000 $2,433.000
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 4,197.000 $100.000 $52.000 $75.000 $75.000 $97.000
LIME (HYDRATED LIME (SLURRY))
TON 740.000 $250.000 $270.000 $275.000 $300.000 $300.000
LIME TRT (EXIST MATL)(18")
SY 19,688.000 $6.000 $5.600 $7.500 $6.750 $12.000
CEMENT
TON 264.000 $250.000 $215.000 $275.000 $300.000 $300.000
CEMENT TREAT (NEW BASE) (8")
SY 18,883.000 $5.000 $2.650 $3.000 $5.000 $7.500
SALV, HAUL & STKPL RCL ASH PV (12")
SY 3,261.000 $15.000 $4.750 $10.500 $6.500 $5.350
PRIME COAT (MULTI OPTION)
GAL 3,779.000 $6.000 $5.750 $6.300 $6.500 $7.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 46.000 $200.000 $155.000 $275.000 $265.000 $260.000
CONC BOX CULV (5 FT X 2 FT)
LF 156.000 $350.000 $375.000 $315.000 $600.000 $360.000
RC PIPE (CL III)(18 IN)
LF 26.000 $130.000 $80.000 $84.000 $102.000 $75.000
RC PIPE (CL III)(24 IN)
LF 240.000 $160.000 $90.000 $94.500 $125.000 $80.000
SET (TY I)(S= 5 FT)(HW= 3 FT)(6:1) (C)
EA 4.000 $13,000.000 $9,500.000 $9,450.000 $13,000.000 $4,500.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 2.000 $1,500.000 $1,200.000 $1,050.000 $1,700.000 $1,100.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 8.000 $1,600.000 $1,500.000 $1,365.000 $2,100.000 $1,360.000
REMOV STR (SET)
EA 12.000 $385.000 $400.000 $315.000 $400.000 $150.000
REMOV STR (PIPE)
LF 300.000 $25.000 $13.000 $12.600 $12.500 $10.000
MOBILIZATION
LS 1.000 $205,639.180 $225,000.000 $242,000.000 $280,000.000 $180,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $8,500.000 $15,000.000 $9,450.000 $12,500.000 $4,850.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 200.000 $35.000 $36.000 $42.000 $47.000 $41.520
ROCK FILTER DAMS (REMOVE)
LF 200.000 $8.250 $14.000 $20.000 $15.000 $14.270
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,825.000 $2.500 $3.850 $2.360 $6.000 $3.920
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,825.000 $0.500 $1.000 $0.500 $1.000 $0.850
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 180.000 $4.000 $8.000 $4.200 $10.000 $8.210
BIODEG EROSN CONT LOGS (REMOVE)
LF 180.000 $1.000 $2.500 $1.000 $2.500 $2.420
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 3.000 $3,400.000 $6,750.000 $5,250.000 $10,000.000 $6,265.000
DRIVEWAYS (ACP)
SY 382.000 $65.000 $70.000 $75.000 $75.000 $89.000
TURNOUTS (ACP)
SY 12.000 $55.000 $100.000 $210.000 $100.000 $675.000
RUMBLE STRIPS (SHOULDER)
LF 6,194.000 $0.550 $0.600 $0.400 $0.650 $1.060
RUMBLE STRIPS (CENTERLINE)
LF 3,275.000 $0.550 $0.600 $0.400 $0.650 $1.600
MAILBOX INSTALL-S (RR-POST) TY 4
EA 3.000 $165.000 $330.000 $246.750 $267.000 $800.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 5.000 $740.000 $745.000 $724.500 $784.000 $675.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 8.000 $875.000 $1,100.000 $850.500 $920.000 $920.000
IN SM RD SN SUP&AM TY10BWG(2)SA(P-EXAL)
EA 1.000 $1,500.000 $1,650.000 $1,732.500 $1,875.000 $1,500.000
REMOVE SM RD SN SUP&AM
EA 17.000 $150.000 $110.000 $105.000 $115.000 $100.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 2.000 $90.000 $85.000 $147.000 $150.000 $75.000
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 22.000 $10.000 $17.000 $26.250 $17.000 $15.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,383.000 $2.000 $1.100 $1.840 $1.140 $1.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 91.000 $6.500 $14.250 $9.450 $14.490 $12.750
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 5.000 $140.000 $295.000 $236.250 $305.000 $268.000
REFL PAV MRK TY I(W)(LNDP ARW)(100MIL)
EA 2.000 $630.000 $660.000 $393.750 $681.000 $600.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 5.000 $200.000 $395.000 $262.500 $403.000 $355.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 7,278.000 $1.000 $0.500 $0.580 $0.510 $0.450
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 7,411.000 $1.000 $0.500 $0.580 $0.510 $0.450
REFL PAV MRKR TY I-C
EA 53.000 $5.000 $5.500 $5.510 $5.680 $5.000
REFL PAV MRKR TY II-A-A
EA 92.000 $5.000 $5.500 $5.510 $5.680 $5.000
REMOV RDSD FLSH BCN AM (SOLAR PWRD)
EA 2.000 $1,500.000 $1,430.000 $2,750.000 $1,500.000 $1,300.000
SP MIXES SP-C SAC-A PG70-28
TON 2,081.000 $130.000 $165.000 $175.000 $180.000 $176.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 300.000 $75.000 $110.000 $52.500 $100.000 $110.000
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
LF 120.000 $8.000 $11.000 $15.750 $11.360 $10.000
TMA (STATIONARY)
DAY 164.000 $120.000 $110.000 $105.000 $50.000 $320.000
TMA (MOBILE OPERATION)
DAY 4.000 $250.000 $300.000 $1,050.000 $850.000 $685.000
Totals: $2,321,530.930 $2,285,805.310 $2,474,794.140 $2,826,653.790 $3,221,438.160