Show Job Controls
Bid Cobra

JOHNSON FM 157 (0747-05-041)

Items: 61

County: JOHNSON
Length: N/A
Highway: FM 157
District: FORT WORTH
Control Number: 0747-05-041
DBE Goal: N/A
Project: F 2021(865)
Guaranty: N/A
Time: 256 WORKING DAYS
Engineer's Estimate: $3,682,242.17
Date: 08/04/2021 (4 years ago)
Contract Number: N/A
Type: RESURFACE ROADWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (7)
E
Engineer's Estimate
$3,682,242.17
$3,859,277.92
Over/Under Est: 4.81% $177,035.75
Over/Under Est: 19.31% $711,108.63
Amt Left: 13.84% $534,072.88
Over/Under Est: 20.57% $757,281.37
Amt Left: 15.04% $580,245.62
Delta: -1.05% -$46,172.74
$4,441,491.21
Over/Under Est: 20.62% $759,249.04
Amt Left: 15.09% $582,213.29
Delta: -0.04% -$1,967.67
Over/Under Est: 21.86% $805,072.05
Amt Left: 16.27% $628,036.30
Delta: -1.03% -$45,823.01
Over/Under Est: 22.04% $811,587.00
Amt Left: 16.44% $634,551.25
Delta: -0.15% -$6,514.95
Over/Under Est: 36.37% $1,339,162.45
Amt Left: 30.11% $1,162,126.70
Delta: -11.74% -$527,575.45

Bid Items & Bid Tabulations

61 Total 0 of 61
JOHNSON  |  FM 157  |  FORT WORTH  |  0747-05-041  |  08/04/2021  |  $3,682,242.17  |  F 2021(865)  |  RESURF ROADWAY  |  256 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
FOUTSCO PAVING COMPANY, LLC
TEXAS MATERIALS GROUP, INC.
PEACHTREE CONSTRUCTION, LTD.
A. L. HELMCAMP, INC.
BIG CREEK CONSTRUCTION, LTD.
ACCELERATED CRITICAL PATH, INC.
AUSTIN BRIDGE & ROAD SERVICES, LP
REMOVING CONC (DRIVEWAYS)
SY 639.000 $15.390 $10.000 $21.000 $22.000 $32.000 $15.000 $19.000 $20.000
EXCAVATION (ROADWAY)
CY 150.000 $7.040 $30.000 $31.000 $33.000 $75.000 $14.000 $20.000 $120.640
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 350.000 $7.140 $25.000 $52.000 $55.000 $45.000 $14.000 $25.000 $50.000
BACKFILL (TY B)
STA 464.600 $181.970 $100.000 $183.000 $230.000 $60.000 $150.000 $125.000 $180.000
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
SY 1,050.000 $0.820 $1.000 $2.180 $5.100 $2.100 $5.000 $2.550 $4.670
VEGETATIVE WATERING
MG 36.800 $17.320 $75.000 $35.000 $250.000 $10.000 $15.000 $90.000 $533.000
WILDFLOWER SEEDING
AC 0.220 $5,000.000 $3,000.000 $5,250.000 $8,500.000 $5,250.000 $8,500.000 $16,900.000 $8,409.820
D-GR HMA (SQ) TY-D PG 70-22(LEVEL-UP)
TON 811.000 $80.000 $130.000 $112.000 $125.000 $125.000 $100.000 $115.000 $143.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(13")
SY 11,373.000 $64.000 $75.000 $78.000 $79.000 $90.000 $80.000 $79.000 $105.000
PLAN & TEXT ASPH CONC PAV(0" TO 2")
SY 70,503.000 $0.400 $0.700 $1.300 $1.150 $2.400 $2.000 $1.500 $1.190
PLAN & TEXT ASPH CONC PAV(0" TO 4")
SY 1,741.000 $10.000 $2.000 $2.180 $2.050 $12.000 $4.000 $3.000 $2.000
RIPRAP (MOW STRIP)(4 IN)
CY 238.000 $525.000 $475.000 $580.000 $550.000 $578.000 $550.000 $650.000 $551.320
CLEANING AND SEALING EXISTING JOINTS
LF 262.000 $37.110 $35.000 $48.000 $42.000 $53.500 $50.000 $41.000 $42.000
RETROFIT RAIL (TY T131RC)
LF 210.000 $200.000 $195.000 $200.000 $215.000 $275.000 $250.000 $230.000 $330.000
MOBILIZATION
LS 1.000 $325,042.500 $262,000.000 $425,716.000 $375,000.000 $275,000.000 $445,000.000 $509,000.000 $502,150.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $8,897.890 $1,700.000 $23,000.000 $5,000.000 $4,000.000 $5,000.000 $10,000.000 $20,000.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 5,302.000 $2.120 $3.500 $3.600 $4.500 $3.650 $5.000 $2.250 $4.240
TEMP SEDMT CONT FENCE (REMOVE)
LF 5,302.000 $0.490 $1.000 $1.050 $1.400 $1.050 $1.500 $1.130 $1.280
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 200.000 $3.580 $6.000 $6.250 $5.000 $6.300 $5.000 $6.150 $4.670
BIODEG EROSN CONT LOGS (REMOVE)
LF 200.000 $0.740 $1.000 $1.050 $1.400 $1.050 $1.500 $2.800 $1.280
ONE-WAY TRAFFIC CONTROL (PORT TRAF SIG)
DAY 9.000 $245.920 $500.000 $0.010 $2,750.000 $850.000 $500.000 $660.000 $200.000
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
LF 600.000 $25.000 $25.000 $0.010 $60.000 $30.000 $15.000 $11.000 $18.460
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 600.000 $10.000 $10.000 $0.010 $30.000 $30.000 $5.000 $10.000 $8.830
PORT CTB (STKPL)(F-SHAPE)(TY 1)
LF 600.000 $20.000 $15.000 $0.010 $25.000 $30.000 $8.000 $10.000 $21.210
DRIVEWAYS (CONC)
SY 639.000 $75.500 $80.000 $102.000 $102.500 $132.000 $90.000 $98.000 $110.000
DRIVEWAYS (ACP)
SY 115.000 $36.790 $50.000 $58.000 $65.000 $35.000 $25.000 $24.000 $120.000
DRIVEWAYS (BASE)
SY 3,137.000 $14.400 $12.000 $25.000 $22.000 $7.000 $20.000 $8.000 $22.000
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 42,446.000 $0.190 $0.100 $0.150 $0.200 $0.210 $0.200 $0.100 $0.200
MTL W-BEAM GD FEN (TIM POST)
LF 1,875.000 $19.980 $22.000 $23.000 $23.500 $22.500 $22.000 $24.600 $21.500
MTL W-BEAM GD FEN (STEEL POST)
LF 125.000 $19.710 $60.000 $59.000 $79.000 $58.750 $75.000 $56.500 $56.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 18.000 $1,741.560 $1,800.000 $1,720.000 $1,650.000 $1,710.000 $1,500.000 $2,360.000 $1,630.000
REMOVE METAL BEAM GUARD FENCE
LF 2,162.500 $2.190 $3.000 $2.600 $2.200 $2.600 $2.250 $2.050 $2.500
REMOVE TERMINAL ANCHOR SECTION
EA 8.000 $194.700 $250.000 $130.000 $215.000 $131.000 $200.000 $154.000 $125.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 10.000 $225.480 $250.000 $208.000 $215.000 $210.000 $200.000 $154.000 $200.000
GUARDRAIL END TREATMENT (INSTALL)
EA 26.000 $2,581.400 $2,900.000 $2,620.000 $2,950.000 $2,675.000 $2,750.000 $2,700.000 $2,550.000
GUARDRAIL END TREATMENT (REMOVE)
EA 17.000 $204.660 $250.000 $260.000 $215.000 $263.000 $200.000 $205.000 $250.000
CRASH CUSH ATTEN (DES SOURCE)
EA 4.000 $1,500.000 $1,600.000 $1.000 $1,050.000 $3,000.000 $1,000.000 $2,700.000 $1,400.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 4.000 $1,690.870 $1,200.000 $1.000 $2,750.000 $1,500.000 $2,500.000 $2,600.000 $1,350.000
CRASH CUSH ATTEN (STKPL)
EA 4.000 $1,188.890 $700.000 $1.000 $4,200.000 $1,500.000 $4,000.000 $1,000.000 $750.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 20.000 $24.000 $15.000 $19.000 $25.500 $19.000 $25.000 $20.500 $18.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 82.000 $27.000 $28.000 $38.000 $36.000 $39.000 $35.000 $33.000 $37.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 10.000 $0.580 $2.000 $1.100 $2.000 $0.500 $1.000 $2.300 $0.400
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 4,513.000 $0.880 $1.000 $1.100 $2.000 $0.500 $1.000 $1.070 $0.400
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 185.000 $0.760 $0.780 $1.050 $0.860 $0.820 $0.800 $0.800 $0.780
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 192.000 $5.720 $6.000 $5.400 $6.500 $6.300 $6.000 $6.150 $6.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 1.000 $127.640 $175.000 $210.000 $195.000 $184.000 $200.000 $180.000 $175.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 1.000 $149.150 $200.000 $210.000 $215.000 $210.000 $200.000 $205.000 $200.000
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 17.000 $44.900 $75.000 $47.000 $85.000 $79.000 $75.000 $77.000 $75.000
PAVEMENT SEALER 24"
LF 12.000 $1.210 $5.000 $5.200 $5.400 $5.250 $5.000 $5.100 $5.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 4,789.000 $0.380 $0.340 $0.480 $0.390 $0.370 $0.400 $0.360 $0.340
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 230.000 $0.330 $0.340 $1.050 $0.390 $0.370 $0.400 $0.360 $0.340
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 88,762.000 $0.380 $0.340 $0.420 $0.390 $0.370 $0.400 $0.360 $0.340
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
LF 87,556.000 $0.490 $0.480 $0.620 $0.550 $0.530 $0.500 $0.510 $0.480
REFL PAV MRKR TY II-A-A
EA 1,125.000 $3.460 $4.500 $3.700 $5.250 $4.730 $5.000 $4.600 $4.500
PAV SURF PREP FOR MRK (24")
LF 12.000 $0.600 $5.000 $2.050 $5.750 $5.250 $5.000 $5.130 $5.000
SP MIXES SP-C SAC-A PG70-28
TON 16,348.000 $96.560 $116.000 $111.000 $112.000 $110.000 $112.000 $110.000 $112.000
TACK COAT
GAL 28,430.000 $0.760 $0.010 $0.010 $1.500 $3.250 $3.000 $5.000 $0.010
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 540.000 $75.000 $0.010 $53.000 $50.000 $34.000 $100.000 $40.000 $50.000
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
LF 80.000 $10.520 $22.000 $16.000 $11.500 $10.000 $25.000 $10.250 $3.250
TMA (STATIONARY)
DAY 526.000 $119.650 $0.010 $0.010 $125.000 $150.000 $175.000 $70.000 $260.000
TMA (MOBILE OPERATION)
DAY 54.000 $286.170 $0.010 $0.010 $300.000 $675.000 $205.000 $400.000 $680.780
Totals: $3,682,242.173 $3,859,277.920 $4,393,350.800 $4,439,523.540 $4,441,491.210 $4,487,314.225 $4,493,829.175 $5,021,404.620