REMOVING CONC (PAV)
|
SY
|
249.000
|
$5.000
|
$24.000
|
$38.000
|
$17.000
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
427.000
|
$4.800
|
$9.000
|
$9.900
|
$12.000
|
|
|
REMOVING STAB BASE & ASPH PAV (7"-12")
|
SY
|
302.000
|
$4.100
|
$17.000
|
$25.260
|
$11.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
158.000
|
$10.000
|
$35.000
|
$41.000
|
$150.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
1,112.000
|
$12.330
|
$15.000
|
$22.000
|
$15.000
|
|
|
SUBGRADE WIDENING (DENS CONT)
|
STA
|
6.800
|
$306.800
|
$4,153.000
|
$2,840.000
|
$500.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
2,599.890
|
$13.380
|
$30.500
|
$34.000
|
$20.000
|
|
|
BLADING
|
HR
|
40.000
|
$114.640
|
$212.300
|
$140.000
|
$100.000
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
|
AC
|
3.120
|
$2,525.000
|
$701.250
|
$1,565.000
|
$3,062.440
|
|
|
VEGETATIVE WATERING
|
MG
|
169.400
|
$19.270
|
$35.000
|
$34.000
|
$30.000
|
|
|
PROOF ROLLING
|
HR
|
16.000
|
$45.000
|
$75.000
|
$110.000
|
$50.000
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
|
CY
|
39.000
|
$50.000
|
$173.000
|
$106.000
|
$100.000
|
|
|
LIME TRT (EXST MATL) (6")
|
SY
|
1,288.000
|
$4.650
|
$9.800
|
$15.980
|
$12.000
|
|
|
LIME (HYD, COM, OR QK(SLURRY))
|
TON
|
10.000
|
$196.790
|
$509.000
|
$260.000
|
$216.000
|
|
|
ASPH (AC-20-5TR OR AC-20XP)
|
GAL
|
912.000
|
$4.000
|
$9.000
|
$3.400
|
$8.000
|
|
|
AGGR(TY-PD GR-4 OR TY-PL GR-4)
|
CY
|
19.000
|
$167.060
|
$222.000
|
$535.000
|
$400.000
|
|
|
CEM STABIL BKFL
|
CY
|
110.000
|
$82.240
|
$41.000
|
$185.000
|
$140.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,431.000
|
$18.490
|
$15.000
|
$64.000
|
$25.000
|
|
|
PRESTR CONC PIL (18 IN SQ)
|
LF
|
1,638.000
|
$140.000
|
$88.000
|
$127.000
|
$120.000
|
|
|
CL C CONC (ABUT)
|
CY
|
51.600
|
$900.000
|
$2,341.000
|
$2,900.000
|
$1,200.000
|
|
|
CL C CONC (CAP)
|
CY
|
20.600
|
$1,046.650
|
$2,870.000
|
$3,800.000
|
$1,850.000
|
|
|
REINF CONC SLAB (SLAB BEAM)
|
SF
|
5,670.000
|
$18.000
|
$22.500
|
$35.000
|
$25.000
|
|
|
APPROACH SLAB
|
CY
|
128.000
|
$340.970
|
$701.000
|
$630.000
|
$500.000
|
|
|
PRESTR CONC SLAB BEAM (4SB12)
|
LF
|
532.000
|
$133.000
|
$175.000
|
$183.000
|
$185.000
|
|
|
PRESTR CONC SLAB BEAM (5SB12)
|
LF
|
665.000
|
$160.000
|
$170.000
|
$163.000
|
$180.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
76.000
|
$387.610
|
$778.000
|
$560.000
|
$540.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
199.000
|
$230.000
|
$218.000
|
$240.000
|
$200.000
|
|
|
RAIL (TY T223)
|
LF
|
318.000
|
$111.680
|
$218.000
|
$200.000
|
$115.000
|
|
|
ARMOR JOINT (SEALED)
|
LF
|
152.000
|
$110.000
|
$160.000
|
$140.000
|
$100.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
114.000
|
$112.000
|
$164.000
|
$98.000
|
$80.000
|
|
|
RC PIPE (CL III)(60 IN)
|
LF
|
144.000
|
$345.000
|
$645.000
|
$500.000
|
$285.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
6.000
|
$1,172.160
|
$2,712.000
|
$1,810.000
|
$1,700.000
|
|
|
SET (TY II) (60 IN) (RCP) (6: 1) (P)
|
EA
|
1.000
|
$14,000.000
|
$19,795.000
|
$22,100.000
|
$14,500.000
|
|
|
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
|
EA
|
2.000
|
$24,250.000
|
$25,806.000
|
$55,300.000
|
$154,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$100,000.000
|
$125,000.000
|
$240,000.000
|
$240,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
13.000
|
$2,500.000
|
$1,373.000
|
$2,300.000
|
$18,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
100.000
|
$33.000
|
$50.000
|
$36.000
|
$60.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
100.000
|
$9.240
|
$3.310
|
$8.100
|
$15.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
740.000
|
$5.800
|
$2.700
|
$5.600
|
$6.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
740.000
|
$1.290
|
$1.000
|
$1.050
|
$1.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
11.000
|
$4,143.790
|
$3,188.000
|
$6,150.000
|
$18,500.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
270.000
|
$41.110
|
$98.000
|
$105.000
|
$100.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
810.000
|
$3.990
|
$5.450
|
$10.980
|
$10.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
270.000
|
$7.000
|
$7.800
|
$28.000
|
$10.000
|
|
|
0512-XXXX PTB (SSCB)(STRUCTURAL)
|
LF
|
215.000
|
$200.000
|
$253.000
|
$78.000
|
$70.000
|
|
|
DRIVEWAYS (BASE)
|
SY
|
420.000
|
$22.000
|
$51.450
|
$33.000
|
$14.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
800.000
|
$24.650
|
$26.000
|
$28.000
|
$23.600
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
8.000
|
$1,850.000
|
$2,176.000
|
$1,840.000
|
$1,940.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
375.000
|
$2.500
|
$2.500
|
$2.550
|
$2.160
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,555.000
|
$3,500.000
|
$2,700.000
|
$3,115.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
2.000
|
$350.000
|
$332.000
|
$255.000
|
$297.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
4.000
|
$1,900.000
|
$1,795.000
|
$1,910.000
|
$2,000.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
4.000
|
$900.000
|
$1,795.000
|
$910.000
|
$1,200.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
4.000
|
$22,616.670
|
$30,692.000
|
$24,700.000
|
$6,995.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
15.000
|
$22.000
|
$27.900
|
$24.100
|
$25.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
24.000
|
$28.000
|
$44.650
|
$39.250
|
$25.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
540.000
|
$4.000
|
$3.350
|
$3.050
|
$3.000
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY W
|
LF
|
120.000
|
$1.600
|
$5.600
|
$5.100
|
$2.500
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
|
EA
|
4,320.000
|
$3.260
|
$3.350
|
$3.100
|
$3.000
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
96.000
|
$8.050
|
$16.750
|
$15.250
|
$5.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
170.000
|
$0.950
|
$3.000
|
$3.350
|
$1.500
|
|
|
PAVEMENT SEALER 4"
|
LF
|
2,461.000
|
$0.200
|
$0.250
|
$0.220
|
$0.250
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
1,640.000
|
$0.340
|
$1.450
|
$1.380
|
$0.500
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
|
LF
|
821.000
|
$0.260
|
$1.600
|
$1.450
|
$0.500
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
178.000
|
$3.100
|
$6.000
|
$5.450
|
$5.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
2,461.000
|
$0.390
|
$0.900
|
$0.090
|
$0.500
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
96.000
|
$3.000
|
$8.540
|
$7.700
|
$3.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
2,461.000
|
$0.010
|
$0.450
|
$0.430
|
$0.300
|
|
|
D-GR HMA TY-B PG64-22 (EXEMPT)
|
TON
|
53.000
|
$90.160
|
$275.000
|
$425.000
|
$800.000
|
|
|
D-GR HMA TY-D PG 64-22 (EXEMPT)
|
TON
|
2.000
|
$152.000
|
$750.000
|
$620.000
|
$800.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
320.000
|
$119.000
|
$0.900
|
$135.000
|
$80.000
|
|
|
TMA (STATIONARY)
|
DAY
|
320.000
|
$310.000
|
$131.500
|
$300.000
|
$220.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
20.000
|
$200.000
|
$229.500
|
$675.000
|
$550.000
|
|
Totals: |
$1,576,883.516
|
$1,947,312.085
|
$2,437,423.660
|
$2,461,947.163
|