Show Job Controls
Bid Cobra

JEFFERSON SH 73 (0508-04-168)

Items: 53

County: JEFFERSON
Length: N/A
Highway: SH 73
District: BEAUMONT
Control Number: 0508-04-168
DBE Goal: N/A
Project: NH 2019(757)
Guaranty: N/A
Time: 77 WORKING DAYS
Engineer's Estimate: $2,185,265.89
Date: 04/02/2019 (7 years ago)
Contract Number: N/A
Type: MILL,ACP
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$2,185,265.89
$2,402,166.15
Over/Under Est: 9.93% $216,900.26
Over/Under Est: 24.7% $539,827.36
Amt Left: 13.44% $322,927.10

Bid Items & Bid Tabulations

53 Total 0 of 53
JEFFERSON  |  SH 73  |  BEAUMONT  |  0508-04-168  |  04/02/2019  |  $2,185,265.89  |  NH 2019(757)  |  MILL,ACP  |  77 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TEXAS MATERIALS GROUP, INC.
ANGEL BROTHERS HOLDINGS CORP.
REMOVING CONCRETE(MOW STRIP)
LF 230.000 $2.650 $9.150 $15.000
REMOVING STAB BASE AND ASPH PAV (0-4")
SY 350.000 $2.850 $23.600 $2.000
EXCAVATION (ROADWAY)
CY 27.000 $6.210 $51.000 $15.000
FURNISHING AND PLACING TOPSOIL (4")
SY 350.000 $0.650 $6.000 $10.000
BLOCK SODDING
SY 350.000 $4.600 $4.100 $6.000
VEGETATIVE WATERING
MG 0.010 $20.080 $47,500.000 $20,000.000
AGGR (TY-PB GR-4 OR TY-PL GR-4 SAC-A)
CY 810.000 $160.000 $185.000 $200.000
ASPH (AC-20XP, AC-10-2TR, OR AC-20-5TR)
GAL 37,900.000 $2.860 $3.400 $3.700
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
TON 11,539.000 $114.360 $119.000 $150.000
PLANE ASPH CONC PAV(1" TO 2")
SY 1,532.000 $1.940 $9.500 $6.000
PLANE ASPH CONC PAV(2" TO 4 1/2" MICRO)
SY 103,744.000 $1.240 $2.480 $2.500
FULL - DEPTH REPAIR CPCD (11")
SY 200.000 $63.290 $300.000 $420.000
RIPRAP (MOW STRIP)(4 IN)
CY 20.000 $445.110 $610.000 $800.000
HEADER TYPE EXPANSION JOINT (SPL)
CF 24.000 $330.840 $875.000 $1,200.000
REMOV STR (PIPE)
LF 50.000 $16.760 $53.000 $35.000
MOBILIZATION
LS 1.000 $190,872.230 $132,500.000 $100,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $14,459.490 $1,300.000 $6,000.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,580.000 $2.370 $4.500 $3.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,580.000 $0.490 $1.300 $0.500
RUMBLE STRIPS (SHOULDER)
LF 29,129.000 $0.190 $0.170 $0.500
MTL W-BEAM GD FEN (TIM POST)
LF 325.000 $20.930 $22.750 $26.000
REMOVE METAL BEAM GUARD FENCE
LF 225.000 $2.830 $3.150 $5.000
GUARDRAIL END TREATMENT (INSTALL)
EA 1.000 $2,445.710 $2,894.000 $4,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 2.000 $397.710 $1,560.000 $500.000
REMOVE SM RD SN SUP&AM
EA 3.000 $75.000 $483.000 $75.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
EA 655.000 $25.020 $16.000 $16.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 355.000 $16.540 $13.750 $15.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 3.000 $10.090 $583.000 $70.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 3,695.000 $0.300 $0.700 $0.700
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 10,898.000 $0.300 $0.680 $0.700
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 10,867.000 $0.300 $0.680 $0.700
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 4,743.000 $1.450 $1.450 $0.700
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 1,230.000 $1.830 $1.600 $0.700
WK ZN PAV MRK NON-REMOV (W)12"(DOT)
LF 1,173.000 $0.750 $2.080 $2.150
REFL PAV MRK TY I (W)8"(LNDP)(090MIL)
LF 24,655.000 $0.310 $0.110 $0.120
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 1,358.000 $0.650 $1.000 $1.000
REFL PAV MRK TY I (W)12"(SLD)(090MIL)
LF 700.000 $2.000 $2.340 $2.700
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
LF 4,180.000 $0.300 $0.310 $0.350
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 24,586.000 $0.320 $0.310 $0.350
REFL PAV MRK TY I (W)12"(DOT)(090MIL)
LF 564.000 $1.000 $2.600 $2.750
PREFAB PAV MRK TY C (W) (ARROW)
EA 1.000 $218.390 $210.000 $220.000
PREFAB PAV MRK TY C (W) (UTURN ARROW)
EA 2.000 $408.830 $378.000 $400.000
PREFAB PAV MRK TY C (W) (NUMBER)
EA 2.000 $250.000 $375.000 $400.000
PREFAB PAV MRK TY C (W) (WORD)
EA 3.000 $295.680 $315.000 $330.000
PREFAB PAV MRK TY C (W) (SYMBOL)
EA 4.000 $392.780 $2,600.000 $2,500.000
REFL PAV MRKR TY I-A
EA 83.000 $3.000 $4.150 $4.000
REFL PAV MRKR TY I-C
EA 90.000 $2.940 $4.100 $4.000
REFL PAV MRKR TY II-C-R
EA 406.000 $2.550 $4.100 $4.000
POST AND CABLE FENCE (NEW INSTALLATION)
LF 200.000 $20.480 $31.000 $35.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 3.000 $10,743.340 $6,500.000 $3,000.000
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
LF 80.000 $2.930 $41.000 $5.000
TMA (STATIONARY)
EA 1.000 $1,500.000 $29,000.000 $2,500.000
TMA (MOBILE OPERATION)
HR 616.000 $98.000 $100.000 $30.000
Totals: $2,185,265.891 $2,402,166.150 $2,725,093.250