Job Info for 0368-03-037

County: JEFFERSON Highway: SH 124 Date: 04/07/2021 (3 years ago) Engineer's Estimate: $426,699 Control Number: 0368-03-037
Project: STP 2021(467)HES District: BEAUMONT Time: 45 WORKING DAYS Type: CONSTRUCT NEW ROADWAY LANES

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $426,698.65
TEXAS MATERIALS GROUP, INC.   $362,017.41 1
-15.16% | -$64,681.24
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.   $429,544.30 2
0.67% | $2,845.65
18.65% | $67,526.89
A. L. HELMCAMP, INC.   $614,497.79 3
44.01% | $187,799.14
69.74% | $252,480.38
43.06% | $184,953.49
FNH CONSTRUCTION, LLC   $705,054.00 4
65.23% | $278,355.35
94.76% | $343,036.59
14.74% | $90,556.21

Bid Items

Items: 40, 0 filtered
JEFFERSON SH 124  |  BEAUMONT  |  0368-03-037  |  04/07/2021  |  $426,699  |  STP 2021(467)HES  |  CONSTRUCT NEW ROADWAY LANES  |  45 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate TEXAS MATERIALS GROUP, INC. CORNERSTONE PAVING AND CONSTRUCTION, L.L.C. A. L. HELMCAMP, INC. FNH CONSTRUCTION, LLC
112 6002 SUBGRADE WIDENING (DENS CONT) STA 30.700 $593.000 $763.000 $400.000 $2,200.000 $450.000
134 6002 BACKFILL (TY B) STA 30.700 $500.000 $238.000 $390.000 $650.000 $450.000
164 6008 BROADCAST SEED (PERM) (URBAN) (CLAY) AC 1.990 $600.000 $818.000 $2,000.000 $3,000.000 $3,500.000
168 6001 VEGETATIVE WATERING MG 109.000 $17.000 $26.000 $25.000 $22.000 $100.000
260 6006 LIME TRT (EXST MATL) (6") SY 3,654.000 $1.660 $4.200 $5.000 $9.000 $15.000
260 6016 LIME (HYD, COM, OR QK(SLURRY)) TON 54.000 $160.000 $212.000 $225.000 $230.000 $200.000
316 6014 ASPH (AC-10-2TR) GAL 6,331.000 $9.100 $3.600 $4.250 $5.000 $10.000
316 6126 AGGR(TY-PB GR-4 SAC-A) CY 135.000 $90.000 $188.000 $140.000 $250.000 $350.000
340 6011 D-GR HMA(SQ) TY-B PG64-22 TON 1,503.000 $93.000 $73.000 $98.500 $115.000 $140.000
340 6272 TACK COAT GAL 205.000 $3.000 $15.400 $4.000 $10.000 $10.000
351 6004 FLEXIBLE PAVEMENT STRUCTURE REPAIR(8") SY 10.000 $50.000 $75.000 $200.000 $1,500.000 $200.000
464 6005 RC PIPE (CL III)(24 IN) LF 24.000 $80.000 $108.000 $265.000 $200.000 $105.000
467 6395 SET (TY II) (24 IN) (RCP) (6: 1) (P) EA 2.000 $1,200.000 $1,785.000 $4,125.000 $3,000.000 $2,200.000
480 6001 CLEAN EXIST CULVERTS EA 19.000 $1,500.000 $1,120.000 $800.000 $1,200.000 $1,500.000
496 6004 REMOV STR (SET) EA 2.000 $400.000 $425.000 $500.000 $1,300.000 $2,500.000
500 6001 MOBILIZATION LS 1.000 $30,000.000 $24,550.000 $50,000.000 $60,000.000 $70,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 3.000 $8,000.000 $1,000.000 $2,500.000 $15,000.000 $8,500.000
506 6002 ROCK FILTER DAMS (INSTALL) (TY 2) LF 20.000 $33.000 $51.000 $75.000 $90.000 $30.000
506 6011 ROCK FILTER DAMS (REMOVE) LF 20.000 $9.500 $12.900 $30.000 $55.000 $15.000
506 6021 CONSTRUCTION EXITS (INSTALL) (TY 2) SY 224.000 $25.000 $23.000 $28.000 $30.000 $40.000
506 6024 CONSTRUCTION EXITS (REMOVE) SY 224.000 $10.000 $8.250 $12.000 $5.000 $20.000
506 6041 BIODEG EROSN CONT LOGS (INSTL) (12") LF 60.000 $5.000 $5.100 $7.000 $9.000 $18.000
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 60.000 $1.300 $2.050 $2.000 $4.000 $9.000
530 6005 DRIVEWAYS (ACP) SY 191.000 $40.000 $22.000 $65.000 $100.000 $65.000
533 6001 RUMBLE STRIPS (SHOULDER) LF 5,297.000 $0.160 $1.120 $2.500 $0.850 $1.000
644 6001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 2.000 $600.000 $551.000 $490.000 $600.000 $850.000
644 6076 REMOVE SM RD SN SUP&AM EA 1.000 $100.000 $96.000 $90.000 $130.000 $550.000
662 6004 WK ZN PAV MRK NON-REMOV (W)4"(SLD) LF 5,297.000 $1.000 $0.450 $0.350 $0.520 $2.000
662 6109 WK ZN PAV MRK SHT TERM (TAB)TY W EA 8.000 $1.210 $2.540 $1.000 $0.500 $5.000
662 6111 WK ZN PAV MRK SHT TERM (TAB)TY Y-2 EA 307.000 $1.500 $1.810 $1.000 $0.500 $5.000
666 6303 RE PM W/RET REQ TY I (W)4"(SLD)(100MIL) LF 6,048.000 $0.350 $0.430 $0.550 $0.500 $2.000
666 6312 RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL) LF 620.000 $0.290 $0.430 $0.550 $0.500 $2.000
666 6315 RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) LF 6,424.000 $0.290 $0.430 $0.550 $0.500 $2.000
668 6076 PREFAB PAV MRK TY C (W) (24") (SLD) LF 40.000 $12.000 $20.250 $15.000 $25.000 $20.000
668 6077 PREFAB PAV MRK TY C (W) (ARROW) EA 4.000 $210.000 $319.000 $225.000 $370.000 $250.000
672 6009 REFL PAV MRKR TY II-A-A EA 395.000 $3.010 $3.050 $4.000 $3.600 $5.000
677 6001 ELIM EXT PAV MRK & MRKS (4") LF 3,842.000 $0.300 $1.050 $1.000 $1.200 $2.000
760 6001 DITCH CLEANING AND RESHAPING (FOOT) LF 4,953.000 $7.000 $5.600 $5.000 $2.000 $5.000
6185 6002 TMA (STATIONARY) DAY 40.000 $200.000 $340.000 $65.000 $250.000 $350.000
6185 6005 TMA (MOBILE OPERATION) DAY 10.000 $200.000 $510.000 $120.000 $250.000 $850.000
Totals: $426,698.65 $362,017.41 $429,544.30 $614,497.79 $705,054.00