JEFFERSON SH 124 (0368-02-046)

Items: 87

County: JEFFERSON
Length: N/A
Highway: SH 124
District: BEAUMONT
Control Number: 0368-02-046
DBE Goal: N/A
Project: C 368-2-46
Guaranty: N/A
Time: 297 WORKING DAYS
Engineer's Estimate: $5,670,332.90
Date: 02/02/2023 (3 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
DAVE COLLINS
TAYLOR KANE
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$5,670,332.90
$6,296,239.49
Over/Under Est: 11.04% $625,906.59
Over/Under Est: 28% $1,587,539.77
Amt Left: 15.27% $961,633.18
Over/Under Est: 62.11% $3,521,604.20
Amt Left: 45.99% $2,895,697.61
Delta: -26.65% -$1,934,064.43
Subcontractor Percentage Amount
WEBER-BALKE FOUNDATION COMPANY, INC 3.89% $302,268.76
TOM-MAC, INC. 3.41% $264,970.81
AMERICAN REMEDIATION OPTIONS, INC. 2.69% $209,023.90
KINGZ INDUSTRIAL LLC 1.01% $78,481.09
TRAFFIC SIGNS & LINES, LLC 0.57% $44,291.31
AGGREGATE TECHNOLOGIES, INC. 0.35% $27,196.42
PHOENIX POLLUTION CONTROL & ENVIRONMENTAL SERVICES, INC. 0.22% $17,094.89
WEST TEXAS ROCK RESOURCES, LLC 0.11% $8,547.45
PRIMATE CONSTRUCTION, LP 0.05% $3,885.20
Total: 12.30% $955,759.83

Bid Items & Bid Tabulations

87 Total 0 of 87
JEFFERSON  |  SH 124  |  BEAUMONT  |  0368-02-046  |  02/02/2023  |  $5,670,332.90  |  C 368-2-46  |  BRIDGE REPL  |  297 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TEXAS MATERIALS GROUP, INC.
RAGLE CONSTRUCTION, INC.
SER CONSTRUCTION PARTNERS, LLC
PREPARING ROW
STA 15.000 $9,000.000 $10,500.000 $7,500.000 $60,000.000
PREP ROW (TREE) (2" TO 12" DIA)
EA 30.000 $230.000 $1,150.000 $456.000 $360.000
REMOVING CONC (PAV)
SY 2,609.000 $8.000 $11.250 $8.500 $10.400
REMOVING CONC (CURB)
LF 100.000 $4.500 $15.440 $9.000 $4.700
REMOVING CONCRETE(MOW STRIP)
LF 630.000 $9.000 $14.710 $5.500 $8.200
REMOVING STAB BASE & ASPH PAV (4" - 6")
SY 5,411.000 $12.000 $7.450 $5.000 $7.900
REMOVING STAB BASE & ASPH PAV (4"-12")
SY 2,802.000 $40.000 $5.750 $8.600 $15.000
EXCAVATION (ROADWAY)
CY 1,111.000 $15.000 $33.350 $58.000 $34.300
EXCAVATION (CHANNEL)
CY 13,528.000 $15.000 $21.000 $67.500 $34.300
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 2,598.000 $12.000 $33.500 $22.000 $17.200
FURNISHING AND PLACING TOPSOIL (4")
SY 16,594.000 $1.200 $2.000 $2.000 $2.200
STRAW OR HAY MULCH
SY 3,836.000 $0.250 $0.460 $0.980 $1.200
BROADCAST SEED (TEMP) (WARM)
SY 183.000 $2.500 $2.300 $0.530 $0.600
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
SY 16,594.000 $0.500 $0.470 $0.400 $0.500
DRILL SEED (TEMP)(WARM OR COOL)
SY 3,653.000 $0.200 $0.420 $0.530 $0.600
VEGETATIVE WATERING
MG 572.000 $16.000 $12.000 $23.000 $10.000
SOIL RETENTION BLANKETS (CL 1) (TY C)
SY 7,965.000 $2.100 $1.310 $0.780 $0.900
PROOF ROLLING
HR 51.000 $180.000 $130.000 $112.000 $125.300
LIME TRT (EXST MATL) (6")
SY 5,366.000 $3.500 $7.000 $7.500 $5.700
LIME (HYD, COM, OR QK(SLURRY))
TON 80.000 $300.000 $373.000 $476.940 $402.600
CM TRT(PT MX)(CL M)(TYA)(GR1-2)(FN POS)
CY 1,341.000 $150.000 $170.000 $176.000 $143.900
PRIME COAT (AE-P)
GAL 1,032.000 $12.000 $7.000 $5.000 $3.600
PLAN & TEXT ASPH CONC PAV (2")
SY 47.000 $2.000 $90.000 $4.010 $4.600
CEM STABIL BKFL
CY 274.000 $105.000 $174.000 $90.000 $76.800
TEMPORARY SPL SHORING
SF 1,199.000 $30.000 $186.500 $26.000 $24.400
PRESTR CONC PIL (16 IN SQ)
LF 912.000 $125.000 $170.000 $180.000 $174.300
PRESTR CONC PIL (24 IN SQ)
LF 1,040.000 $110.000 $200.000 $180.000 $310.000
CL C CONC (ABUT)
CY 61.600 $1,500.000 $1,350.000 $1,000.000 $1,957.500
CL C CONC (CAP)
CY 40.600 $1,700.000 $1,300.000 $1,500.000 $1,941.000
CL C CONC (MISC)
CY 116.000 $775.000 $910.000 $100.000 $796.900
REINF CONC SLAB
SF 11,960.000 $17.000 $26.000 $36.000 $38.300
APPROACH SLAB
CY 88.000 $640.000 $938.000 $600.000 $694.400
PRESTR CONC GIRDER (TX40)
LF 1,650.500 $150.000 $195.500 $220.000 $275.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 938.000 $120.000 $302.000 $221.000 $193.700
RIPRAP (MOW STRIP)(4 IN)
CY 40.000 $690.000 $1,020.000 $594.000 $665.100
RAIL (TY T223)
LF 580.000 $200.000 $155.000 $115.000 $122.500
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 90.000 $200.000 $283.000 $167.000 $139.600
REMOV STR (PIPE)
LF 67.000 $17.500 $25.000 $25.000 $46.800
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $100,000.000 $185,000.000 $350,000.000 $294,324.000
MOBILIZATION
LS 1.000 $739,609.000 $520,000.000 $720,000.000 $900,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 20.000 $10,024.000 $1,200.000 $10,000.000 $7,698.600
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 40.000 $95.000 $45.000 $35.000 $90.000
ROCK FILTER DAMS (REMOVE)
LF 40.000 $16.000 $12.600 $10.000 $18.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 600.000 $28.000 $27.600 $30.000 $28.100
CONSTRUCTION EXITS (REMOVE)
SY 600.000 $8.000 $15.250 $10.000 $6.500
TEMP SEDMT CONT FENCE (INSTALL)
LF 6,110.000 $3.000 $3.150 $3.000 $3.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 6,110.000 $1.600 $1.050 $1.000 $0.600
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 40.000 $5.000 $12.500 $10.000 $19.700
BIODEG EROSN CONT LOGS (REMOVE)
LF 40.000 $1.500 $1.050 $2.000 $17.400
CONSTRUCTING DETOURS
SY 5,625.000 $126.000 $126.000 $151.000 $147.700
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 2,440.000 $70.000 $56.000 $33.000 $85.500
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 4,920.000 $6.000 $9.500 $8.500 $16.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 2,440.000 $15.000 $20.000 $12.000 $19.600
DRIVEWAYS (ACP)
SY 1,927.000 $60.000 $24.000 $49.000 $72.000
DRIVEWAYS (BASE)
SY 606.000 $25.000 $21.660 $15.000 $37.200
RUMBLE STRIPS (SHOULDER)
LF 1,500.000 $0.400 $7.100 $2.500 $5.600
RUMBLE STRIPS (CENTERLINE)
LF 750.000 $0.400 $12.500 $2.500 $10.000
MTL W-BEAM GD FEN (TIM POST)
LF 302.000 $32.000 $27.000 $24.910 $31.300
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,900.000 $1,816.000 $1,853.000 $1,800.000
REMOVE METAL BEAM GUARD FENCE
LF 453.000 $3.000 $2.600 $2.150 $6.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 4.000 $270.000 $262.500 $300.000 $180.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,660.000 $2,835.000 $3,028.000 $3,000.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $280.000 $262.500 $300.000 $300.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 10.000 $1,800.000 $1,575.000 $3,020.000 $4,200.000
CRASH CUSH ATTEN (REMOVE)
EA 6.000 $1,400.000 $945.000 $1,568.000 $3,000.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 6.000 $11,000.000 $10,494.750 $16,230.000 $11,181.600
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 1.000 $778.000 $735.000 $675.000 $420.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 4.000 $669.000 $630.000 $850.000 $1,770.000
REMOVE SM RD SN SUP&AM
EA 2.000 $113.000 $525.000 $75.000 $120.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 20.000 $38.000 $42.000 $25.000 $75.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BR)
EA 8.000 $33.000 $26.250 $25.000 $60.000
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 130.000 $5.000 $6.300 $5.000 $7.200
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 10,727.000 $1.600 $1.240 $0.570 $1.400
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 10,682.000 $0.900 $1.240 $0.570 $1.400
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 5,596.000 $0.700 $1.310 $0.640 $1.500
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
LF 710.000 $0.600 $1.580 $1.000 $1.800
REFL PAV MRKR TY II-A-A
EA 36.000 $5.000 $15.750 $10.000 $18.000
ELIM EXT PAV MRK & MRKS (6")
LF 9,870.000 $0.500 $0.260 $0.300 $0.300
PAV SURF PREP FOR MRK (4")
LF 6,306.000 $0.300 $0.110 $0.300 $0.100
D-GR HMA TY-B PG64-22 (EXEMPT)
TON 827.000 $225.000 $255.000 $273.540 $322.800
D-GR HMA TY-D SAC-A PG76-22
TON 551.000 $200.000 $283.000 $296.920 $350.400
TACK COAT
GAL 601.000 $12.000 $10.000 $10.000 $24.000
TEMPORARY DETOUR BRIDGE
EA 1.000 $722,520.000 $795,000.000 $850,000.000 $1,693,300.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $18,000.000 $17,500.000 $20,000.000 $19,800.000
TMA (STATIONARY)
DAY 20.000 $250.000 $349.000 $250.000 $711.000
FLOATING TURBIDITY BARRIER (INSTALL)
LF 150.000 $50.000 $42.000 $55.000 $60.000
FLOATING TURBIDITY BARRIER (REMOVE)
LF 150.000 $21.000 $78.750 $13.000 $60.000
Totals: $5,670,332.900 $6,296,239.490 $7,257,872.670 $9,191,937.100