PREPARING ROW
|
STA
|
15.000
|
$9,000.000
|
$10,500.000
|
$7,500.000
|
$60,000.000
|
|
|
PREP ROW (TREE) (2" TO 12" DIA)
|
EA
|
30.000
|
$230.000
|
$1,150.000
|
$456.000
|
$360.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
2,609.000
|
$8.000
|
$11.250
|
$8.500
|
$10.400
|
|
|
REMOVING CONC (CURB)
|
LF
|
100.000
|
$4.500
|
$15.440
|
$9.000
|
$4.700
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
630.000
|
$9.000
|
$14.710
|
$5.500
|
$8.200
|
|
|
REMOVING STAB BASE & ASPH PAV (4" - 6")
|
SY
|
5,411.000
|
$12.000
|
$7.450
|
$5.000
|
$7.900
|
|
|
REMOVING STAB BASE & ASPH PAV (4"-12")
|
SY
|
2,802.000
|
$40.000
|
$5.750
|
$8.600
|
$15.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
1,111.000
|
$15.000
|
$33.350
|
$58.000
|
$34.300
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
13,528.000
|
$15.000
|
$21.000
|
$67.500
|
$34.300
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
2,598.000
|
$12.000
|
$33.500
|
$22.000
|
$17.200
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
16,594.000
|
$1.200
|
$2.000
|
$2.000
|
$2.200
|
|
|
STRAW OR HAY MULCH
|
SY
|
3,836.000
|
$0.250
|
$0.460
|
$0.980
|
$1.200
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
183.000
|
$2.500
|
$2.300
|
$0.530
|
$0.600
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
16,594.000
|
$0.500
|
$0.470
|
$0.400
|
$0.500
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
3,653.000
|
$0.200
|
$0.420
|
$0.530
|
$0.600
|
|
|
VEGETATIVE WATERING
|
MG
|
572.000
|
$16.000
|
$12.000
|
$23.000
|
$10.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY C)
|
SY
|
7,965.000
|
$2.100
|
$1.310
|
$0.780
|
$0.900
|
|
|
PROOF ROLLING
|
HR
|
51.000
|
$180.000
|
$130.000
|
$112.000
|
$125.300
|
|
|
LIME TRT (EXST MATL) (6")
|
SY
|
5,366.000
|
$3.500
|
$7.000
|
$7.500
|
$5.700
|
|
|
LIME (HYD, COM, OR QK(SLURRY))
|
TON
|
80.000
|
$300.000
|
$373.000
|
$476.940
|
$402.600
|
|
|
CM TRT(PT MX)(CL M)(TYA)(GR1-2)(FN POS)
|
CY
|
1,341.000
|
$150.000
|
$170.000
|
$176.000
|
$143.900
|
|
|
PRIME COAT (AE-P)
|
GAL
|
1,032.000
|
$12.000
|
$7.000
|
$5.000
|
$3.600
|
|
|
PLAN & TEXT ASPH CONC PAV (2")
|
SY
|
47.000
|
$2.000
|
$90.000
|
$4.010
|
$4.600
|
|
|
CEM STABIL BKFL
|
CY
|
274.000
|
$105.000
|
$174.000
|
$90.000
|
$76.800
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,199.000
|
$30.000
|
$186.500
|
$26.000
|
$24.400
|
|
|
PRESTR CONC PIL (16 IN SQ)
|
LF
|
912.000
|
$125.000
|
$170.000
|
$180.000
|
$174.300
|
|
|
PRESTR CONC PIL (24 IN SQ)
|
LF
|
1,040.000
|
$110.000
|
$200.000
|
$180.000
|
$310.000
|
|
|
CL C CONC (ABUT)
|
CY
|
61.600
|
$1,500.000
|
$1,350.000
|
$1,000.000
|
$1,957.500
|
|
|
CL C CONC (CAP)
|
CY
|
40.600
|
$1,700.000
|
$1,300.000
|
$1,500.000
|
$1,941.000
|
|
|
CL C CONC (MISC)
|
CY
|
116.000
|
$775.000
|
$910.000
|
$100.000
|
$796.900
|
|
|
REINF CONC SLAB
|
SF
|
11,960.000
|
$17.000
|
$26.000
|
$36.000
|
$38.300
|
|
|
APPROACH SLAB
|
CY
|
88.000
|
$640.000
|
$938.000
|
$600.000
|
$694.400
|
|
|
PRESTR CONC GIRDER (TX40)
|
LF
|
1,650.500
|
$150.000
|
$195.500
|
$220.000
|
$275.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
938.000
|
$120.000
|
$302.000
|
$221.000
|
$193.700
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
40.000
|
$690.000
|
$1,020.000
|
$594.000
|
$665.100
|
|
|
RAIL (TY T223)
|
LF
|
580.000
|
$200.000
|
$155.000
|
$115.000
|
$122.500
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
90.000
|
$200.000
|
$283.000
|
$167.000
|
$139.600
|
|
|
REMOV STR (PIPE)
|
LF
|
67.000
|
$17.500
|
$25.000
|
$25.000
|
$46.800
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$100,000.000
|
$185,000.000
|
$350,000.000
|
$294,324.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$739,609.000
|
$520,000.000
|
$720,000.000
|
$900,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
20.000
|
$10,024.000
|
$1,200.000
|
$10,000.000
|
$7,698.600
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
40.000
|
$95.000
|
$45.000
|
$35.000
|
$90.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
40.000
|
$16.000
|
$12.600
|
$10.000
|
$18.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
600.000
|
$28.000
|
$27.600
|
$30.000
|
$28.100
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
600.000
|
$8.000
|
$15.250
|
$10.000
|
$6.500
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
6,110.000
|
$3.000
|
$3.150
|
$3.000
|
$3.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
6,110.000
|
$1.600
|
$1.050
|
$1.000
|
$0.600
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
40.000
|
$5.000
|
$12.500
|
$10.000
|
$19.700
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
40.000
|
$1.500
|
$1.050
|
$2.000
|
$17.400
|
|
|
CONSTRUCTING DETOURS
|
SY
|
5,625.000
|
$126.000
|
$126.000
|
$151.000
|
$147.700
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
2,440.000
|
$70.000
|
$56.000
|
$33.000
|
$85.500
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
4,920.000
|
$6.000
|
$9.500
|
$8.500
|
$16.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
2,440.000
|
$15.000
|
$20.000
|
$12.000
|
$19.600
|
|
|
DRIVEWAYS (ACP)
|
SY
|
1,927.000
|
$60.000
|
$24.000
|
$49.000
|
$72.000
|
|
|
DRIVEWAYS (BASE)
|
SY
|
606.000
|
$25.000
|
$21.660
|
$15.000
|
$37.200
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
1,500.000
|
$0.400
|
$7.100
|
$2.500
|
$5.600
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
750.000
|
$0.400
|
$12.500
|
$2.500
|
$10.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
302.000
|
$32.000
|
$27.000
|
$24.910
|
$31.300
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,900.000
|
$1,816.000
|
$1,853.000
|
$1,800.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
453.000
|
$3.000
|
$2.600
|
$2.150
|
$6.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$270.000
|
$262.500
|
$300.000
|
$180.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$3,660.000
|
$2,835.000
|
$3,028.000
|
$3,000.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$280.000
|
$262.500
|
$300.000
|
$300.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
10.000
|
$1,800.000
|
$1,575.000
|
$3,020.000
|
$4,200.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
6.000
|
$1,400.000
|
$945.000
|
$1,568.000
|
$3,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
6.000
|
$11,000.000
|
$10,494.750
|
$16,230.000
|
$11,181.600
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
1.000
|
$778.000
|
$735.000
|
$675.000
|
$420.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
4.000
|
$669.000
|
$630.000
|
$850.000
|
$1,770.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
2.000
|
$113.000
|
$525.000
|
$75.000
|
$120.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
20.000
|
$38.000
|
$42.000
|
$25.000
|
$75.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BR)
|
EA
|
8.000
|
$33.000
|
$26.250
|
$25.000
|
$60.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
130.000
|
$5.000
|
$6.300
|
$5.000
|
$7.200
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
10,727.000
|
$1.600
|
$1.240
|
$0.570
|
$1.400
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
10,682.000
|
$0.900
|
$1.240
|
$0.570
|
$1.400
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
5,596.000
|
$0.700
|
$1.310
|
$0.640
|
$1.500
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
|
LF
|
710.000
|
$0.600
|
$1.580
|
$1.000
|
$1.800
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
36.000
|
$5.000
|
$15.750
|
$10.000
|
$18.000
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
9,870.000
|
$0.500
|
$0.260
|
$0.300
|
$0.300
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
6,306.000
|
$0.300
|
$0.110
|
$0.300
|
$0.100
|
|
|
D-GR HMA TY-B PG64-22 (EXEMPT)
|
TON
|
827.000
|
$225.000
|
$255.000
|
$273.540
|
$322.800
|
|
|
D-GR HMA TY-D SAC-A PG76-22
|
TON
|
551.000
|
$200.000
|
$283.000
|
$296.920
|
$350.400
|
|
|
TACK COAT
|
GAL
|
601.000
|
$12.000
|
$10.000
|
$10.000
|
$24.000
|
|
|
TEMPORARY DETOUR BRIDGE
|
EA
|
1.000
|
$722,520.000
|
$795,000.000
|
$850,000.000
|
$1,693,300.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$18,000.000
|
$17,500.000
|
$20,000.000
|
$19,800.000
|
|
|
TMA (STATIONARY)
|
DAY
|
20.000
|
$250.000
|
$349.000
|
$250.000
|
$711.000
|
|
|
FLOATING TURBIDITY BARRIER (INSTALL)
|
LF
|
150.000
|
$50.000
|
$42.000
|
$55.000
|
$60.000
|
|
|
FLOATING TURBIDITY BARRIER (REMOVE)
|
LF
|
150.000
|
$21.000
|
$78.750
|
$13.000
|
$60.000
|
|
Totals: |
$5,670,332.900
|
$6,296,239.490
|
$7,257,872.670
|
$9,191,937.100
|