Job Info for 0307-01-149

County: JEFFERSON Highway: SH 87 Date: 10/02/2020 (4 years ago) Engineer's Estimate: $3,045,594 Control Number: 0307-01-149
Project: C 307-1-149 District: BEAUMONT Time: 180 WORKING DAYS Type: OVERLAY

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $3,045,594.30
PTSS INVESTMENTS, LLC   $2,734,996.75 1
-10.2% | -$310,597.55
TEXAS MATERIALS GROUP, INC.   $2,800,668.69 2
-8.04% | -$244,925.61
2.4% | $65,671.94
ANGEL BROTHERS HOLDINGS CORP.   $3,164,137.75 3
3.89% | $118,543.45
15.69% | $429,141.00
12.98% | $363,469.06

Bid Items

Items: 44, 0 filtered
JEFFERSON SH 87  |  BEAUMONT  |  0307-01-149  |  10/02/2020  |  $3,045,594  |  C 307-1-149  |  OVERLAY  |  180 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate PTSS INVESTMENTS, LLC TEXAS MATERIALS GROUP, INC. ANGEL BROTHERS HOLDINGS CORP.
104 6021 REMOVING CONC (CURB) LF 600.000 $6.000 $11.000 $10.050 $15.000
340 6247 D-GR HMA (SQ) TY-D PG 70-22(LEVEL-UP) TON 825.000 $110.000 $95.000 $130.000 $125.000
354 6010 PLAN & TEXT ASPH CONC PAV(0" TO 6") SY 66,278.000 $6.000 $3.450 $3.200 $3.300
354 6035 PLANE CONC PAV(0" TO 1") SY 11,915.000 $4.000 $2.150 $2.000 $9.000
361 6078 FULL-DEPTH REPAIR CPJR (VAR DEPTH) CY 500.000 $50.000 $1,375.000 $1,275.000 $1,300.000
479 6003 ADJUSTING MANHOLES & INLETS EA 8.000 $2,500.000 $100.000 $305.000 $800.000
479 6005 ADJUSTING MANHOLES (WATER VALVE BOX) EA 10.000 $916.000 $100.000 $305.000 $800.000
500 6001 MOBILIZATION LS 1.000 $276,360.000 $150,000.000 $220,000.000 $288,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 12.000 $4,500.000 $1,000.000 $800.000 $790.000
506 6041 BIODEG EROSN CONT LOGS (INSTL) (12") LF 700.000 $5.000 $5.000 $7.050 $6.500
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 700.000 $1.000 $1.000 $1.050 $3.000
529 6005 CONC CURB (MONO) (TY II) LF 1,000.000 $6.000 $49.500 $46.000 $50.000
644 6001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 3.000 $450.000 $770.000 $705.000 $825.000
662 6109 WK ZN PAV MRK SHT TERM (TAB)TY W EA 74.000 $1.250 $3.000 $3.120 $1.000
662 6111 WK ZN PAV MRK SHT TERM (TAB)TY Y-2 EA 1,683.000 $1.250 $6.000 $1.700 $1.000
666 6035 REFL PAV MRK TY I (W)8"(SLD)(090MIL) LF 1,562.000 $1.150 $1.000 $0.910 $1.100
666 6224 PAVEMENT SEALER 4" LF 3,050.000 $0.200 $0.390 $0.360 $0.450
666 6226 PAVEMENT SEALER 8" LF 201.000 $0.400 $0.770 $0.710 $0.850
666 6230 PAVEMENT SEALER 24" LF 60.000 $2.500 $2.480 $2.260 $2.700
666 6231 PAVEMENT SEALER (ARROW) EA 6.000 $40.000 $27.500 $25.500 $30.000
666 6299 RE PM W/RET REQ TY I (W)4"(BRK)(090MIL) LF 60.000 $0.450 $1.100 $1.050 $1.200
666 6302 RE PM W/RET REQ TY I (W)4"(SLD)(090MIL) LF 24,202.000 $0.450 $0.460 $0.430 $0.500
666 6311 RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL) LF 5,417.000 $0.450 $0.500 $0.460 $0.550
666 6314 RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL) LF 25,340.000 $0.450 $0.460 $0.430 $0.500
668 6070 PREFAB PAV MRK TY C (W) (8") (DOT) LF 20.000 $9.250 $2.200 $2.050 $2.350
668 6076 PREFAB PAV MRK TY C (W) (24") (SLD) LF 1,007.000 $12.000 $11.830 $11.400 $12.700
668 6077 PREFAB PAV MRK TY C (W) (ARROW) EA 33.000 $215.000 $236.500 $216.000 $253.000
668 6085 PREFAB PAV MRK TY C (W) (WORD) EA 2.000 $300.000 $330.000 $305.000 $353.000
672 6007 REFL PAV MRKR TY I-C EA 78.000 $4.000 $4.400 $4.050 $4.700
672 6009 REFL PAV MRKR TY II-A-A EA 765.000 $4.000 $4.400 $4.050 $4.700
677 6001 ELIM EXT PAV MRK & MRKS (4") LF 3,697.000 $0.400 $0.550 $0.510 $0.600
677 6003 ELIM EXT PAV MRK & MRKS (8") LF 321.000 $1.000 $1.100 $1.050 $1.200
677 6007 ELIM EXT PAV MRK & MRKS (24") LF 60.000 $5.000 $5.500 $5.100 $5.900
677 6008 ELIM EXT PAV MRK & MRKS (ARROW) EA 10.000 $50.000 $38.500 $36.000 $42.000
690 6126 REPLACE LUMINAIRE POLE EA 1.000 $3,700.000 $8,470.000 $7,600.000 $5,500.000
713 6001 JT SEALING AND CLEANING(TRANS CNTR JTS) LF 33,169.000 $5.000 $2.000 $1.850 $2.150
713 6003 JT SEALING AND CLEANING(LNGT CNSTR JTS) LF 42,344.000 $5.000 $2.000 $1.850 $2.150
713 6005 CRACK CLEANING AND SEALING (JCP) LF 20,000.000 $4.000 $2.100 $1.950 $2.250
721 6002 FIBER REINFORCED POLYMER PATCHING MATLS LB 145,811.000 $6.000 $3.050 $2.780 $3.350
3077 6033 SP MIXES SP-C SAC-A PG76-22 TON 7,291.000 $90.000 $95.000 $108.000 $120.000
3077 6075 TACK COAT GAL 3,977.000 $4.000 $5.000 $5.200 $4.250
6185 6002 TMA (STATIONARY) DAY 170.000 $250.000 $350.000 $390.000 $265.000
6185 6005 TMA (MOBILE OPERATION) DAY 10.000 $250.000 $220.000 $205.000 $265.000
6408 6001 FLOOD GAUGE ASSEMBLY EA 2.000 $425.000 $825.000 $760.000 $900.000
Totals: $3,045,594.30 $2,734,996.75 $2,800,668.69 $3,164,137.75