REMOVING CONC (RIPRAP)
|
SY
|
770.000
|
$7.500
|
$38.100
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
110.000
|
$16.000
|
$47.250
|
|
|
REMOVING CONC (CTB)
|
LF
|
19,819.000
|
$6.000
|
$9.500
|
|
|
REMOVING STAB BASE AND ASPH PAV (6")
|
SY
|
3,929.000
|
$3.000
|
$4.050
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
4,563.000
|
$7.250
|
$16.000
|
|
|
BLOCK SODDING
|
SY
|
2,160.000
|
$5.900
|
$4.050
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
|
AC
|
1.870
|
$1,685.000
|
$1,510.000
|
|
|
VEGETATIVE WATERING
|
MG
|
12.700
|
$14.000
|
$38.000
|
|
|
ASPHALT STAB BASE (GR 1)(PG 64)
|
TON
|
1,297.000
|
$200.000
|
$95.000
|
|
|
PLANE ASPH CONC PAV (1.5'-2")
|
SY
|
207,612.000
|
$2.000
|
$1.800
|
|
|
FULL - DEPTH REPAIR CPCD (12")
|
SY
|
500.000
|
$165.000
|
$405.000
|
|
|
FULL - DEPTH REPAIR CPJR (9")
|
SY
|
500.000
|
$215.000
|
$355.000
|
|
|
DRILL SHAFT (30 IN)
|
LF
|
48.000
|
$205.000
|
$360.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
49.000
|
$400.000
|
$555.000
|
|
|
HEADER TYPE EXPANSION JOINT
|
CF
|
268.000
|
$310.000
|
$318.000
|
|
|
JOINT SEALANT
|
LF
|
2,320.000
|
$10.500
|
$14.600
|
|
|
JCTBOX(COMPL)(PJB)(4FTX4FT)
|
EA
|
1.000
|
$3,715.000
|
$7,325.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 2 FT)(6:1) (P)
|
EA
|
1.000
|
$3,500.000
|
$6,425.000
|
|
|
SET (TY II) (24 IN) (HDPE) (6: 1) (P)
|
EA
|
22.000
|
$1,050.000
|
$1,495.000
|
|
|
REMOV STR (SET)
|
EA
|
1.000
|
$300.000
|
$580.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
52.000
|
$60.000
|
$92.000
|
|
|
REMOVE STR (JUNCTION BOX)
|
EA
|
1.000
|
$500.000
|
$580.000
|
|
|
REMOV STR (DRILL SHAFT)
|
EA
|
12.000
|
$700.000
|
$6,050.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$710,000.000
|
$429,165.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
7.000
|
$5,000.000
|
$3,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 4)
|
LF
|
55.000
|
$34.000
|
$43.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
55.000
|
$8.600
|
$9.100
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
250.000
|
$5.700
|
$5.100
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
250.000
|
$1.500
|
$1.020
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (54 )
|
LF
|
19,489.000
|
$150.000
|
$86.000
|
|
|
PERM CTB (SGL SLOPE)(TY 1)(TRANSITION)
|
LF
|
330.000
|
$200.000
|
$252.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
102,914.000
|
$0.140
|
$0.140
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
980.000
|
$10.000
|
$15.300
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
980.000
|
$1.100
|
$2.350
|
|
|
ELEC CONDR (NO.2) INSULATED
|
LF
|
980.000
|
$2.500
|
$4.350
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
422.000
|
$20.000
|
$12.600
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
3,962.000
|
$1.210
|
$1.750
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
13,070.000
|
$1.050
|
$0.860
|
|
REFL PAV MRK TY I (W)12"(LNDP)(090MIL)
|
LF
|
708.000
|
$2.500
|
$3.550
|
|
REFL PAV MRK TY I (W)12"(SLD)(090MIL)
|
LF
|
4,951.000
|
$3.150
|
$0.370
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
|
LF
|
1,242.000
|
$0.360
|
$2.700
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
49,634.000
|
$0.390
|
$0.370
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
49,634.000
|
$0.400
|
$0.370
|
|
PREFAB PAV MRK TY B (W)(ARROW)
|
EA
|
18.000
|
$200.000
|
$545.000
|
|
PREFAB PAV MRK TY B (W)(WORD)
|
EA
|
16.000
|
$300.000
|
$755.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
2,286.000
|
$3.570
|
$4.050
|
|
|
D-GR HMA TY-B PG64-22 (LEVEL-UP)
|
TON
|
148.000
|
$105.000
|
$115.000
|
|
|
SP MIXES SP-D SAC-A PG76-22
|
TON
|
20,891.000
|
$80.000
|
$98.000
|
|
|
TACK COAT
|
GAL
|
12,457.000
|
$2.600
|
$4.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
24.000
|
$140.000
|
$86.000
|
|
|
TMA (STATIONARY)
|
DAY
|
374.000
|
$200.000
|
$345.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
40.000
|
$250.000
|
$345.000
|
|
|
SANITARY SEWER PIPE (HDPE)(24")(HDD)
|
LF
|
1,756.500
|
$150.000
|
$550.000
|
|
Totals: |
$7,169,143.830
|
$7,063,405.840
|