REMOVING CONC (PAV)
|
SY
|
38,118.000
|
$13.000
|
$7.000
|
$8.000
|
$14.750
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
963.000
|
$18.200
|
$10.000
|
$38.000
|
$20.000
|
|
|
REMOVING CONC (CURB)
|
LF
|
16,997.000
|
$10.120
|
$3.000
|
$1.100
|
$5.000
|
|
|
REMOVING STAB BASE & ASPH PAV (8"-10")
|
SY
|
698.000
|
$5.000
|
$6.000
|
$16.000
|
$12.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
12,518.000
|
$20.970
|
$21.500
|
$23.000
|
$110.000
|
|
|
BACKFILL (TY B)
|
STA
|
91.900
|
$238.920
|
$400.000
|
$817.000
|
$200.000
|
|
|
BLOCK SODDING
|
SY
|
16,070.000
|
$4.940
|
$5.500
|
$5.100
|
$6.400
|
|
|
CELL FBR MLCH SEED(PERM)(URBAN)(CLAY)
|
SY
|
54,912.000
|
$0.360
|
$0.400
|
$0.380
|
$0.350
|
|
|
VEGETATIVE WATERING
|
MG
|
1,349.000
|
$22.010
|
$10.000
|
$15.000
|
$17.500
|
|
|
LIME (HYD, COM, OR QK(SLURRY))
|
TON
|
487.000
|
$329.210
|
$300.000
|
$395.000
|
$225.000
|
|
|
LIME TRT (SUBGRADE)(6")
|
SY
|
36,058.000
|
$4.820
|
$3.300
|
$6.250
|
$3.800
|
|
|
CM TRT(PT MX)(CL L)(TYD)(GR1-2)(FN POS)
|
CY
|
805.000
|
$70.000
|
$135.000
|
$164.000
|
$125.000
|
|
|
CEM TRT(PLNT MX) (CL L)(TYD)(GR1-2)(6")
|
SY
|
36,058.000
|
$14.000
|
$26.500
|
$26.500
|
$19.500
|
|
|
PRIME COAT (AE-P)
|
GAL
|
7,695.000
|
$3.960
|
$13.000
|
$10.000
|
$5.500
|
|
|
CONC PVMT (CONT REINF - CRCP) (10")
|
SY
|
34,614.000
|
$89.470
|
$100.000
|
$122.000
|
$111.000
|
|
|
CONC PVMT (CONT REINF)(FAST TRK)(13")
|
SY
|
5,049.000
|
$123.250
|
$150.000
|
$146.000
|
$250.000
|
|
|
CEM STABIL BKFL
|
CY
|
1,398.000
|
$168.090
|
$95.000
|
$117.000
|
$80.000
|
|
|
CUT & RESTORE CONC PAVING
|
SY
|
152.000
|
$287.170
|
$150.000
|
$455.000
|
$175.000
|
|
|
CEMENT STAB BACKFILL (INLET OR MH)
|
CY
|
213.000
|
$56.980
|
$95.000
|
$168.000
|
$56.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
2,083.000
|
$2.950
|
$3.000
|
$36.500
|
$1.000
|
|
|
CL C CONC (COLLAR)
|
EA
|
28.000
|
$1,010.000
|
$1,500.000
|
$610.000
|
$800.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
26.000
|
$508.250
|
$600.000
|
$640.000
|
$575.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(6 IN)
|
CY
|
4.000
|
$120.000
|
$1,000.000
|
$285.000
|
$600.000
|
|
|
CONC BOX CULV (4 FT X 4 FT)
|
LF
|
944.000
|
$420.000
|
$370.000
|
$560.000
|
$450.000
|
|
|
CONC BOX CULV (5 FT X 4 FT)
|
LF
|
588.000
|
$600.000
|
$465.000
|
$735.000
|
$550.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
36.000
|
$89.420
|
$100.000
|
$103.000
|
$260.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
176.000
|
$103.760
|
$95.000
|
$121.000
|
$165.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
188.000
|
$130.070
|
$120.000
|
$143.000
|
$120.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
48.000
|
$147.820
|
$165.000
|
$172.000
|
$145.000
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
8.000
|
$187.790
|
$300.000
|
$283.000
|
$395.000
|
|
|
RC PIPE (CL III)(60 IN)
|
LF
|
4.000
|
$420.960
|
$500.000
|
$1,610.000
|
$890.000
|
|
|
JCTBOX(COMPL)(PJB)(3FTX3FT)
|
EA
|
1.000
|
$3,948.790
|
$5,400.000
|
$6,750.000
|
$6,600.000
|
|
|
JCTBOX(COMPL)(PJB)(8FTX8FT)
|
EA
|
1.000
|
$15,269.120
|
$20,000.000
|
$23,150.000
|
$17,000.000
|
|
|
INLET (COMPL)(PCO)(3FT)(NONE)
|
EA
|
1.000
|
$5,641.820
|
$6,850.000
|
$6,975.000
|
$7,200.000
|
|
|
INLET (COMPL)(PCO)(3FT)(LEFT)
|
EA
|
1.000
|
$6,698.700
|
$8,000.000
|
$9,500.000
|
$8,400.000
|
|
|
INLET (COMPL)(PCO)(3FT)(RIGHT)
|
EA
|
6.000
|
$7,344.020
|
$7,400.000
|
$8,600.000
|
$8,400.000
|
|
|
INLET (COMPL)(PCO)(3FT)(BOTH)
|
EA
|
12.000
|
$12,200.000
|
$7,400.000
|
$8,900.000
|
$9,000.000
|
|
|
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
|
EA
|
3.000
|
$6,663.600
|
$7,500.000
|
$10,000.000
|
$8,400.000
|
|
|
INLET (COMPL)(PSL)(FG)(6FTX6FT-3FTX3FT)
|
EA
|
3.000
|
$7,738.200
|
$12,000.000
|
$12,700.000
|
$10,250.000
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
2.000
|
$1,325.000
|
$1,500.000
|
$1,365.000
|
$1,875.000
|
|
|
PIPE (PVC) (SCH 80) (6 IN)
|
LF
|
519.000
|
$14.120
|
$50.000
|
$92.000
|
$18.000
|
|
|
REMOV STR (INLET)
|
EA
|
28.000
|
$667.400
|
$600.000
|
$1,215.000
|
$950.000
|
|
|
REMOV STR (PIPE)
|
LF
|
1,618.000
|
$20.700
|
$15.000
|
$29.500
|
$20.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,357,272.010
|
$900,000.000
|
$538,100.000
|
$1,350,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
19.000
|
$8,987.770
|
$5,000.000
|
$3,800.000
|
$43,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
30.000
|
$32.800
|
$50.000
|
$51.000
|
$67.680
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
30.000
|
$8.770
|
$20.000
|
$20.250
|
$29.580
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
750.000
|
$2.730
|
$3.000
|
$3.530
|
$7.840
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
945.000
|
$1.250
|
$1.000
|
$1.020
|
$1.050
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
345.000
|
$6.460
|
$5.000
|
$5.600
|
$8.850
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
345.000
|
$1.120
|
$1.000
|
$1.520
|
$2.610
|
|
|
TEMP SDMT CONT FENCE (INLET PROTECTION)
|
LF
|
195.000
|
$10.150
|
$10.000
|
$7.100
|
$13.650
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
200.000
|
$26.190
|
$130.000
|
$14.500
|
$110.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
3,560.000
|
$83.330
|
$85.000
|
$26.250
|
$110.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
140.000
|
$51.560
|
$85.000
|
$97.000
|
$110.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
12,780.000
|
$6.680
|
$6.000
|
$5.700
|
$8.500
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
560.000
|
$9.530
|
$6.000
|
$13.000
|
$12.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
200.000
|
$7.800
|
$50.000
|
$36.500
|
$16.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
3,560.000
|
$7.880
|
$8.000
|
$15.000
|
$10.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
140.000
|
$9.190
|
$8.000
|
$25.500
|
$12.000
|
|
|
CONC CURB (MONO) (TY I)
|
LF
|
147.000
|
$4.080
|
$10.000
|
$58.000
|
$15.000
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
17,583.000
|
$15.330
|
$5.000
|
$10.250
|
$6.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
761.000
|
$86.690
|
$100.000
|
$135.000
|
$105.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
1.000
|
$958.220
|
$1,200.000
|
$910.000
|
$1,500.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
1.000
|
$10,636.840
|
$12,000.000
|
$9,900.000
|
$10,500.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
54.000
|
$650.000
|
$600.000
|
$514.000
|
$450.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
5,440.000
|
$0.850
|
$3.000
|
$3.000
|
$2.970
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
10,059.000
|
$0.810
|
$2.000
|
$1.470
|
$1.450
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
4,052.000
|
$1.450
|
$4.000
|
$2.920
|
$2.890
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
17.000
|
$8.760
|
$25.000
|
$35.600
|
$35.210
|
|
REFL PAV MRK TY I (W)4"(DOT)(090MIL)
|
LF
|
69.000
|
$1.450
|
$2.000
|
$1.040
|
$1.000
|
|
REFL PAV MRK TY I (W)8"(DOT)(090MIL)
|
LF
|
240.000
|
$1.960
|
$3.000
|
$2.050
|
$2.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
3,176.000
|
$0.970
|
$1.000
|
$1.520
|
$1.480
|
|
|
PAVEMENT SEALER 4"
|
LF
|
6,044.000
|
$0.150
|
$0.500
|
$0.230
|
$0.220
|
|
|
PAVEMENT SEALER 8"
|
LF
|
3,416.000
|
$0.280
|
$0.500
|
$0.440
|
$0.430
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
|
LF
|
3,610.000
|
$0.440
|
$1.000
|
$0.750
|
$0.740
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
745.000
|
$0.380
|
$1.000
|
$0.750
|
$0.740
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
1,620.000
|
$0.380
|
$1.000
|
$0.720
|
$0.710
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
357.000
|
$13.440
|
$22.000
|
$17.100
|
$16.910
|
|
PREFAB PAV MRK TY C (W) (UTURN ARROW)
|
EA
|
5.000
|
$350.000
|
$600.000
|
$512.000
|
$506.200
|
|
PREFAB PAV MRK TY C (W) (LNDP ARROW)
|
EA
|
3.000
|
$450.300
|
$700.000
|
$695.000
|
$684.780
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
5.000
|
$272.510
|
$400.000
|
$385.000
|
$379.960
|
|
PREFAB PAV MRK TY C (W) (RR XING)
|
EA
|
5.000
|
$667.330
|
$1,100.000
|
$735.000
|
$727.360
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
18.000
|
$36.560
|
$65.000
|
$32.950
|
$32.620
|
|
PREFAB PAV MRK TY C (Y) (24") (SLD)
|
LF
|
147.000
|
$12.060
|
$30.000
|
$18.300
|
$18.110
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
12.000
|
$4.570
|
$10.000
|
$3.720
|
$3.670
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
284.000
|
$3.800
|
$6.000
|
$3.720
|
$3.670
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
6,044.000
|
$0.200
|
$0.500
|
$0.100
|
$0.090
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
3,416.000
|
$0.130
|
$0.750
|
$0.160
|
$0.150
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
504.000
|
$0.860
|
$3.000
|
$0.920
|
$0.910
|
|
|
PAV SURF PREP FOR MRK (UTURN ARR)
|
EA
|
5.000
|
$35.980
|
$50.000
|
$12.400
|
$12.210
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
5.000
|
$18.840
|
$50.000
|
$9.150
|
$9.040
|
|
|
PAV SURF PREP FOR MRK (RR XING)
|
EA
|
5.000
|
$24.570
|
$60.000
|
$26.500
|
$26.220
|
|
|
PAV SURF PREP FOR MRK (SYMBOL)
|
EA
|
9.000
|
$22.890
|
$50.000
|
$32.900
|
$32.550
|
|
|
PAV SURF PREP FOR MRK (36")(YLD TRI)
|
EA
|
18.000
|
$9.470
|
$10.000
|
$0.690
|
$0.680
|
|
|
DITCH CLEANING AND RESHAPING (FOOT)
|
LF
|
75.000
|
$6.770
|
$20.000
|
$35.250
|
$20.000
|
|
|
DRAIN INLET CLEANING
|
EA
|
5.000
|
$195.970
|
$2,000.000
|
$5,810.000
|
$750.000
|
|
|
TACK COAT
|
GAL
|
3,847.000
|
$3.980
|
$13.000
|
$10.000
|
$8.000
|
|
|
D-GR HMA TY-D PG 64-22 (EXEMPT)
|
TON
|
2,116.000
|
$317.330
|
$280.000
|
$239.000
|
$175.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,621.260
|
$22,500.000
|
$23,000.000
|
$75,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
279.000
|
$268.730
|
$200.000
|
$322.000
|
$250.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
80.000
|
$77.480
|
$100.000
|
$65.000
|
$60.000
|
|
Totals: |
$10,405,752.048
|
$10,175,549.200
|
$11,214,278.150
|
$13,464,160.740
|