Show Job Controls
Bid Cobra

JEFFERSON US 69 (0200-14-085)

Items: 63

County: JEFFERSON
Length: N/A
Highway: US 69
District: BEAUMONT
Control Number: 0200-14-085
DBE Goal: N/A
Project: BR 2018(658)
Guaranty: N/A
Time: 186 WORKING DAYS
Engineer's Estimate: $7,023,460.84
Date: 06/06/2018 (7 years ago)
Contract Number: N/A
Type: REPAINT STRUCTURES WITH SPOT REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$7,023,460.84
1
Awarded
$8,319,407.20
Over/Under Est: 18.45% $1,295,946.36
Over/Under Est: 47.19% $3,314,377.04
Amt Left: 24.26% $2,018,430.68
Over/Under Est: 60.54% $4,252,129.24
Amt Left: 35.53% $2,956,182.88
Delta: -9.07% -$937,752.20
$13,400,758.40
Over/Under Est: 90.8% $6,377,297.56
Amt Left: 61.08% $5,081,351.20
Delta: -18.85% -$2,125,168.32

Bid Items & Bid Tabulations

63 Total 0 of 63
JEFFERSON  |  US 69  |  BEAUMONT  |  0200-14-085  |  06/06/2018  |  $7,023,460.84  |  BR 2018(658)  |  REPAINT STRUCTS WITH SPOT REPAIR  |  186 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
CEKRA INC.
GIBSON & ASSOCIATES, INC.
OLDCASTLE MATERIALS TEXAS, INC.
FNH CONSTRUCTION, LLC
REMOVING CONC (RIPRAP)
SY 51.000 $12.000 $150.000 $225.000 $600.000 $10.000
REMOVING CONC (COPING)
LF 90.000 $30.000 $150.000 $60.000 $260.000 $10.000
BACKFILL (TY B)
STA 167.800 $150.000 $170.000 $890.000 $350.000 $150.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(14")
SY 29,830.000 $55.000 $98.000 $86.680 $91.500 $150.000
CEM STABIL BKFL
CY 2,010.000 $80.000 $70.000 $230.000 $90.000 $220.000
FLOWABLE BACKFILL
CY 7.000 $200.000 $1,000.000 $300.000 $980.000 $200.000
TEMPORARY SPL SHORING
SF 1,847.000 $18.000 $150.000 $60.500 $80.000 $12.000
CL C CONC (ABUT)(EXTEND)
CY 117.400 $1,800.000 $1,000.000 $4,510.000 $2,500.000 $850.000
CL C CONC (COPING)
CY 11.200 $600.000 $1,000.000 $1,100.000 $2,500.000 $675.000
CL K CONC (PEDESTAL)
EA 64.000 $1,500.000 $2,000.000 $1,270.000 $3,150.000 $800.000
CL S CONC(APPR SLAB)(MOD)
CY 831.000 $1,200.000 $1,000.000 $920.000 $800.000 $850.000
PENETRATING CONCRETE SURFACE TREATMENT
SY 1,365.000 $8.000 $10.000 $41.000 $23.000 $15.000
CONC STR REPAIR(CLEAN & COAT WTH EPOXY)
SF 23.000 $250.000 $1,000.000 $200.000 $110.000 $3,500.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 77.000 $250.000 $1,000.000 $215.000 $165.000 $200.000
RIPRAP (CONC)(4 IN)
CY 8.100 $400.000 $1,000.000 $1,600.000 $3,700.000 $450.000
ELASTOMERIC BEARING (SPECIAL)
EA 64.000 $2,500.000 $1,500.000 $1,650.000 $4,000.000 $1,521.000
MULTI-LAYER POLYMER OVERLAY
SY 4,484.000 $60.000 $55.000 $38.000 $88.000 $112.000
CLEAN & PAINT EXIST STR (SYSTEM II)
LS 1.000 $750,000.000 $240,000.000 $1,604,000.000 $481,000.000 $3,420,000.000
RETROFIT RAIL (TY T552)
LF 1,272.000 $250.000 $350.000 $187.000 $410.000 $420.000
SHOT BLASTING
SY 4,484.000 $10.000 $8.000 $5.000 $7.000 $20.000
RAISING EXIST STRUCT
LS 1.000 $225,000.000 $240,000.000 $300,000.000 $250,000.000 $10,000.000
REMOV STR (BACKWALL)
EA 12.000 $8,000.000 $10,000.000 $27,500.000 $7,300.000 $1,000.000
REMOV STR (APPROACH SLAB)
EA 12.000 $10,000.000 $10,000.000 $35,000.000 $7,300.000 $800.000
MOBILIZATION
LS 1.000 $633,496.440 $600,000.000 $865,000.000 $1,694,000.000 $950,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 11.000 $5,000.000 $5,000.000 $8,000.000 $105,000.000 $3,500.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 2)
LF 5,260.000 $40.000 $75.000 $92.000 $89.000 $75.000
PORT CTB (MOVE)(SGL SLP)(TY 2)
LF 15,520.000 $8.000 $5.000 $7.000 $25.000 $25.000
PORT CTB (REMOVE)(SGL SLP)(TY 2)
LF 5,260.000 $12.000 $5.000 $25.000 $32.000 $35.000
MTL W-BEAM GD FEN (TIM POST)
LF 4,975.000 $20.000 $25.000 $22.550 $27.000 $22.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 11.000 $1,800.000 $2,500.000 $1,798.500 $2,100.000 $2,000.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 12.000 $1,000.000 $2,500.000 $1,089.000 $1,400.000 $1,350.000
MTL BM GD FEN TRANS (NON - SYM)
EA 12.000 $1,100.000 $2,500.000 $1,257.300 $1,300.000 $1,000.000
REMOVE METAL BEAM GUARD FENCE
LF 4,975.000 $3.000 $5.000 $2.750 $4.000 $3.500
REMOVE TERMINAL ANCHOR SECTION
EA 12.000 $225.000 $1,000.000 $275.000 $120.000 $300.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 12.000 $300.000 $1,000.000 $275.000 $280.000 $600.000
GUARDRAIL END TREATMENT (INSTALL)
EA 11.000 $2,300.000 $3,500.000 $2,530.000 $2,500.000 $2,500.000
GUARDRAIL END TREATMENT (REMOVE)
EA 11.000 $350.000 $2,500.000 $275.000 $280.000 $300.000
CRASH CUSH ATTEN (INSTL)
EA 3.000 $13,000.000 $25,000.000 $10,000.000 $20,000.000 $10,500.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 5.000 $2,000.000 $2,500.000 $1,800.000 $1,600.000 $5,000.000
CRASH CUSH ATTEN (REMOVE)
EA 3.000 $1,000.000 $2,500.000 $1,000.000 $890.000 $2,500.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BR)
EA 31.000 $25.000 $32.000 $29.700 $50.000 $50.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2(BR)
EA 31.000 $25.000 $30.000 $29.700 $50.000 $50.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BR)
EA 18.000 $25.000 $42.000 $16.500 $31.000 $50.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BR)
EA 18.000 $25.000 $53.000 $16.500 $33.000 $50.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 2,560.000 $0.350 $0.500 $0.220 $0.220 $1.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 24,865.000 $0.350 $0.200 $0.210 $0.200 $1.000
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 24,865.000 $0.350 $0.200 $0.210 $0.200 $1.000
PAVEMENT SEALER 4"
LF 24,886.000 $0.350 $0.200 $0.060 $0.060 $0.150
REF PROF PAV MRK TY I(W)4"(SLD)(090MIL)
LF 9,653.000 $0.600 $0.500 $0.830 $0.800 $1.000
REF PROF PAV MRK TY I(Y)4"(SLD)(090MIL)
LF 9,653.000 $0.600 $0.500 $0.830 $0.800 $1.000
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
LF 5,580.000 $0.500 $0.500 $0.440 $0.450 $1.000
PREFAB PAV MRK TY C (W) (8") (SLD)
LF 2,100.000 $4.000 $10.000 $2.750 $2.800 $1.000
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 170.000 $14.000 $15.000 $13.200 $13.000 $1.000
REFL PAV MRKR TY II-C-R
EA 70.000 $4.000 $5.000 $4.400 $4.500 $3.500
ELIM EXT PAV MRK & MRKS (4")
LF 77,176.000 $0.500 $1.000 $0.390 $0.370 $1.000
ELIM EXT PAV MRK & MRKS (8")
LF 2,100.000 $0.750 $1.000 $0.830 $0.800 $1.000
ELIM EXT PAV MRK & MRKS (24")
LF 170.000 $3.000 $5.000 $2.310 $2.200 $1.000
PAV SURF PREP FOR MRK (4")
LF 52,290.000 $0.080 $0.500 $0.020 $0.020 $1.000
CONC RAIL REPAIR(REMOVE AND REPL RAIL)
LF 68.000 $200.000 $1,000.000 $765.000 $530.000 $300.000
BRIDGE JOINT REPLACEMENT (SEJ)
LF 700.000 $500.000 $400.000 $350.000 $500.000 $375.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 40.000 $100.000 $500.000 $200.000 $120.000 $100.000
TMA (STATIONARY)
DAY 106.000 $200.000 $500.000 $250.000 $475.000 $200.000
TMA (MOBILE OPERATION)
DAY 20.000 $200.000 $500.000 $250.000 $950.000 $400.000
Totals: $7,023,460.840 $8,319,407.200 $10,337,837.880 $11,275,590.080 $13,400,758.400