JEFF DAVIS SH0017 (6306-40-001)

Items: 36

County: JEFF DAVIS
Length: N/A
Highway: SH0017
District: EL PASO
Control Number: 6306-40-001
DBE Goal: N/A
Project: BPM - 630640001
Guaranty: N/A
Time: 140 W
Engineer's Estimate: $684,166.24
Date: 02/03/2017 (9 years ago)
Contract Number: N/A
Type: BPM
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$684,166.24
$739,781.00
Over/Under Est: 8.13% $55,614.76
Over/Under Est: 13.14% $89,897.76
Amt Left: 4.63% $34,283.00
Over/Under Est: 29.75% $203,560.76
Amt Left: 20% $147,946.00
Delta: -14.68% -$113,663.00
Over/Under Est: 107.95% $738,582.39
Amt Left: 92.32% $682,967.63
Delta: -60.27% -$535,021.63
Over/Under Est: 118.97% $813,970.76
Amt Left: 102.51% $758,356.00
Delta: -5.30% -$75,388.37

Bid Items & Bid Tabulations

36 Total 0 of 36
JEFF DAVIS  |  SH0017  |  EL PASO  |  6306-40-001  |  02/03/2017  |  $684,166.24  |  BPM - 630640001  |  BPM  |  140 W
Item Code
Description
Unit
Quantity
Engineer's Estimate
CHAMPION INFRASTRUCTURE, LLC
LESNA CONSTRUCTION, INC.
DAN WILLIAMS COMPANY
SALINAS CONSTRUCTION TECHNOLOGIES, LTD.
SCR CIVIL CONSTRUCTION, LLC
REMOVING CONC (RIPRAP)
SY 384.000 $14.380 $40.000 $12.000 $25.000 $43.410 $25.000
REMOVING CONC (MISC)
SY 249.000 $39.350 $50.000 $12.000 $25.000 $68.020 $25.000
EMBANKMENT (FINAL)(ORD COMP)(TY A)
CY 722.000 $20.000 $60.000 $25.000 $135.000 $150.670 $60.000
STRUCT EXCAV
CY 80.000 $10.500 $90.000 $30.000 $50.000 $82.420 $50.000
FLOWABLE BACKFILL
CY 11.000 $140.420 $220.000 $350.000 $200.000 $667.720 $300.000
CL C CONC (MISC)
CY 12.000 $937.560 $1,200.000 $1,300.000 $400.000 $1,766.250 $1,200.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 238.000 $250.000 $140.000 $110.000 $200.000 $315.290 $200.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 261.000 $132.280 $240.000 $160.000 $275.000 $294.220 $450.000
RIPRAP (STONE COMMON)(GROUT)(18 IN)
CY 6.000 $156.620 $460.000 $600.000 $425.000 $1,601.180 $400.000
CLEANING AND SEALING EXISTING JOINTS
LF 64.000 $27.620 $40.000 $30.000 $25.000 $193.970 $30.000
CLEANING AND SEALING EXIST JOINTS(CL3)
LF 16.000 $37.130 $10.000 $45.000 $35.000 $450.050 $50.000
RETROFIT RAIL (TY T131RC)
LF 360.000 $144.920 $120.000 $150.000 $175.000 $427.910 $300.000
GABION MATTRESSES (GALV)(18 IN)
SY 1,937.000 $100.000 $85.000 $160.000 $105.000 $68.170 $300.000
GABIONS (3' X 3')(GALV)
CY 430.000 $186.090 $260.000 $190.000 $225.000 $373.120 $400.000
MOBILIZATION
LS 1.000 $59,469.660 $50,000.000 $70,000.000 $87,000.000 $362,517.000 $140,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $5,000.000 $3,800.000 $3,000.000 $10,000.000 $3,138.380 $15,000.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 792.000 $6.970 $10.000 $7.000 $12.000 $16.660 $15.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 792.000 $2.270 $5.000 $2.000 $1.500 $3.460 $1.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 210.000 $5.220 $50.000 $7.000 $10.000 $42.940 $12.000
PORT CTB (STKPL)(F-SHAPE)(TY 1)
LF 210.000 $9.720 $50.000 $15.000 $20.000 $42.910 $25.000
MTL W-BEAM GD FEN (STEEL POST)
LF 400.000 $24.200 $30.000 $27.000 $25.000 $27.830 $25.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 3.000 $1,870.000 $700.000 $2,100.000 $3,000.000 $2,793.430 $2,500.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,094.500 $2,200.000 $1,300.000 $1,400.000 $1,780.290 $1,800.000
REMOVE METAL BEAM GUARD FENCE
LF 425.000 $4.130 $5.000 $3.000 $10.000 $4.710 $2.000
REMOVE TERMINAL ANCHOR SECTION
EA 3.000 $401.380 $600.000 $200.000 $450.000 $483.430 $200.000
GUARDRAIL END TREATMENT (INSTALL)
EA 1.000 $2,519.100 $1,500.000 $2,600.000 $3,000.000 $3,430.290 $2,500.000
GUARDRAIL END TREATMENT (REMOVE)
EA 1.000 $495.000 $700.000 $500.000 $300.000 $570.290 $200.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 1.000 $1,834.250 $3,200.000 $2,000.000 $1,200.000 $2,330.290 $500.000
CRASH CUSH ATTEN (STKPL)
EA 1.000 $2,640.000 $3,200.000 $800.000 $750.000 $1,505.290 $300.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
EA 6.000 $19.130 $120.000 $35.000 $75.000 $49.220 $35.000
INSTL DEL ASSM (D-SY)SZ 2(WC)GND
EA 3.000 $97.880 $120.000 $40.000 $75.000 $153.430 $35.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 3.000 $66.430 $120.000 $120.000 $75.000 $180.930 $35.000
JT / CRCK SEAL (RUBBER - ASPHALT)
LF 2,527.000 $4.500 $3.000 $5.000 $10.000 $15.960 $10.000
DITCH CLEANING AND RESHAPING (FOOT)
LF 460.000 $4.420 $10.000 $20.000 $5.000 $48.280 $125.000
CNC CRACK REPAIR (DISCRETE)(INJECT)
LF 456.000 $105.460 $80.000 $70.000 $50.000 $142.430 $40.000
ASPHALT PLUG EXP JOINT
CF 66.000 $434.770 $590.000 $400.000 $450.000 $620.610 $150.000
Totals: $684,166.240 $739,781.000 $774,064.000 $887,727.000 $1,422,748.630 $1,498,137.000