JASPER US0069 (6342-38-001)

Items: 61

County: JASPER
Length: N/A
Highway: US0069
District: BEAUMONT
Control Number: 6342-38-001
DBE Goal: N/A
Project: RMC - 634238001
Guaranty: N/A
Time: 365 W
Engineer's Estimate: $423,655.00
Date: 05/07/2019 (7 years ago)
Contract Number: N/A
Type: METAL BEAM GUARD FENCE REPAIRS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$423,655.00
$415,500.00
Over/Under Est: -1.92% -$8,155.00
Over/Under Est: 20.95% $88,760.50
Amt Left: 23.33% $96,915.50
Over/Under Est: 21.95% $92,998.00
Amt Left: 24.34% $101,153.00
Delta: -0.83% -$4,237.50

Bid Items & Bid Tabulations

61 Total 0 of 61
JASPER  |  US0069  |  BEAUMONT  |  6342-38-001  |  05/07/2019  |  $423,655.00  |  RMC - 634238001  |  METAL BEAM GUARD FENCE REPAIRS  |  365 W
Item Code
Description
Unit
Quantity
Engineer's Estimate
ELITE CASTLE RESOURCES LLC
WIDGEON CONSTRUCTION, INC.
ISI CONTRACTING, INC.
REMOVING CONC (RIPRAP)
SY 5.000 $800.000 $100.000 $500.000 $50.000
CONC STR REPR(REMOV AND REPL WINGWALL)
CY 2.000 $2,750.000 $1,800.000 $1,440.000 $4,800.000
RIPRAP (MOW STRIP)(4 IN)
CY 1.000 $1,500.000 $1,200.000 $1,855.000 $1,500.000
RETROFIT RAIL (TY T131RC)
LF 150.000 $175.000 $100.000 $290.000 $258.000
MOBILIZATION (CALLOUT)
EA 60.000 $150.000 $50.000 $1,000.000 $2,000.000
MOBILIZATION (EMERGENCY)
EA 1.000 $5,000.000 $2,800.000 $3,500.000 $5,000.000
MTL W-BEAM GD FEN (TIM POST)
LF 10.000 $35.000 $35.000 $30.000 $20.000
MTL THRIE-BEAM GD FEN (TIM POST)
LF 5.000 $100.000 $80.000 $100.000 $68.000
TERMINAL ANCHOR SECTION
EA 5.000 $300.000 $100.000 $840.000 $350.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 1.000 $2,500.000 $2,500.000 $1,870.000 $2,000.000
MTL BEAM GD FEN TRANS (TL2)
EA 2.000 $1,280.000 $1,000.000 $1,490.000 $1,200.000
MTL BEAM GD FEN TRANS (T101)
EA 1.000 $1,240.000 $1,000.000 $1,200.000 $1,350.000
MTL W-BEAM GD FEN ADJUSTMENT
LF 1.000 $100.000 $500.000 $24.500 $6.000
MTL THRIE-BEAM GD FEN ADJUSTMENT
LF 1.000 $100.000 $500.000 $150.000 $14.000
TERMINAL ANCHOR SECTION ADJUSTMENT
EA 1.000 $500.000 $100.000 $300.000 $240.000
TRANSITION ADJUSTMENT
EA 1.000 $500.000 $500.000 $150.000 $240.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $2,000.000 $2,500.000 $1,560.000 $1,350.000
MTL BM GD FEN (LONG SPAN SYSTEM)
LF 5.000 $75.000 $80.000 $83.000 $25.000
REMOVE METAL BEAM GUARD FENCE
LF 50.000 $10.000 $6.000 $9.000 $1.600
REMOVE TERMINAL ANCHOR SECTION
EA 5.000 $300.000 $250.000 $250.000 $1.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $4,000.000 $4,000.000 $2,868.000 $2,900.000
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $600.000 $1,000.000 $500.000 $250.000
CRASH CUSH ATTEN (INSTL)
EA 1.000 $25,000.000 $18,000.000 $15,000.000 $24,000.000
CRASH CUSH ATTEN (REMOVE)
EA 1.000 $3,800.000 $3,500.000 $1,075.000 $600.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
EA 5.000 $50.000 $50.000 $22.000 $13.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 5.000 $50.000 $50.000 $25.000 $13.000
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
EA 5.000 $50.000 $50.000 $40.000 $13.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 10.000 $45.000 $50.000 $40.000 $35.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 2,150.000 $30.000 $30.000 $25.000 $18.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 1.000 $175.000 $100.000 $200.000 $50.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 1.000 $175.000 $100.000 $1,200.000 $50.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 10.000 $48.000 $350.000 $100.000 $21.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 60.000 $100.000 $60.000 $100.000 $40.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 50.000 $100.000 $50.000 $135.000 $50.000
REALIGN POSTS
EA 70.000 $20.000 $5.000 $50.000 $10.000
REMOVE & REPLACE BLOCKOUT
EA 50.000 $20.000 $100.000 $16.000 $7.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 600.000 $30.000 $30.000 $31.000 $25.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 50.000 $80.000 $100.000 $71.000 $42.000
REPAIR OF TERMINAL ANCHORS POSTS
EA 1.000 $100.000 $100.000 $300.000 $8.000
REPLACE TERMINAL ANCHOR POSTS
EA 5.000 $100.000 $100.000 $500.000 $10.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 10.000 $3,500.000 $4,000.000 $2,600.000 $3,200.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 20.000 $1,100.000 $1,000.000 $860.000 $1,200.000
REM & RESET SGT IMPACT HEAD
EA 5.000 $500.000 $500.000 $250.000 $150.000
REPLACE SGT CABLE ASSEMBLY
EA 15.000 $200.000 $200.000 $228.000 $150.000
REPLACE SGT STRUT
EA 15.000 $200.000 $200.000 $190.000 $150.000
REPAIR STEEL POST WITH BASE PLATE
EA 1.000 $600.000 $500.000 $295.000 $40.000
REMOVE AND REPLACE (TRACC)
EA 1.000 $20,000.000 $20,000.000 $25,000.000 $18,000.000
REMOVE AND REPLACE (NARROW REACT 350)
EA 1.000 $23,000.000 $25,000.000 $26,900.000 $28,000.000
REMOVE AND REPLACE (WIDE REACT 350)
EA 1.000 $25,000.000 $35,000.000 $49,000.000 $44,000.000
REMOVE AND REPLACE (NARROW QUAD)
EA 1.000 $22,000.000 $23,000.000 $25,000.000 $17,000.000
REPAIR (CATGR - FRONT SECTION)
EA 1.000 $5,000.000 $5,500.000 $3,250.000 $4,600.000
REPAIR (CATGR - END SECTION)
EA 1.000 $3,000.000 $3,000.000 $3,250.000 $2,900.000
REMOVE AND REPLACE (CATGR)
EA 1.000 $7,000.000 $6,500.000 $7,520.000 $9,000.000
REPAIR (QUAD) (N) (BAY)
EA 5.000 $1,000.000 $1,800.000 $1,800.000 $1,000.000
REPAIR (QUAD) (W) (BAY)
EA 1.000 $2,500.000 $2,500.000 $2,100.000 $3,500.000
REPAIR REACT (CYLINDERS)
EA 5.000 $2,500.000 $2,500.000 $3,700.000 $3,700.000
REPAIR REACT (W) (CYLINDERS)
EA 1.000 $2,500.000 $2,500.000 $4,000.000 $3,800.000
REPAIR (TRACC) (BAY)
EA 5.000 $1,100.000 $1,000.000 $3,800.000 $825.000
REPAIR (WIDE TRACC) (BAY)
EA 1.000 $1,750.000 $1,500.000 $4,000.000 $1,600.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 1.000 $1,800.000 $2,600.000 $1,500.000 $125.000
TMA (STATIONARY)
EA 60.000 $250.000 $300.000 $200.000 $275.000
Totals: $423,655.000 $415,500.000 $512,415.500 $516,653.000