REMOVING CONCRETE(MOW STRIP)
|
LF
|
1,618.000
|
$6.000
|
$55.000
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
433.000
|
$600.000
|
$537.890
|
|
|
BACKFILL (TY B)
|
STA
|
433.000
|
$220.000
|
$321.800
|
|
|
SPEC EXCAV WORK (BACKHOE)
|
HR
|
80.000
|
$239.000
|
$475.840
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
24,769.000
|
$0.500
|
$0.150
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
24,769.000
|
$0.500
|
$0.150
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
|
SY
|
49,520.000
|
$0.500
|
$0.410
|
|
|
VEGETATIVE WATERING
|
MG
|
1,662.000
|
$30.000
|
$32.770
|
|
|
FL BS (CMP IN PLACE)(TY A GR 1-2)(10")
|
SY
|
33,639.000
|
$25.000
|
$57.490
|
|
|
RWRK BS MTL(TY C)(8")(ORD CMP)(ORG POS)
|
CY
|
32,037.000
|
$2.500
|
$13.370
|
|
|
FOG SEAL (CSS-1H)
|
GAL
|
10,092.000
|
$8.000
|
$16.260
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
3,071.000
|
$1.500
|
$9.350
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
98.600
|
$500.000
|
$660.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
126.000
|
$540.000
|
$660.000
|
|
|
RETROFIT RAIL (TY T131RC)
|
LF
|
1,093.000
|
$190.000
|
$227.700
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
380.000
|
$90.000
|
$137.500
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
106.000
|
$100.000
|
$158.400
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
36.000
|
$150.000
|
$228.800
|
|
|
SET (TY I)(S= 4 FT)(HW= 5 FT)(6:1) (C)
|
EA
|
2.000
|
$7,500.000
|
$16,500.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 3 FT)(6:1) (C)
|
EA
|
20.000
|
$8,000.000
|
$12,540.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
2.000
|
$9,300.000
|
$7,920.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 4 FT)(6:1) (C)
|
EA
|
16.000
|
$10,400.000
|
$7,700.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 5 FT)(6:1) (C)
|
EA
|
6.000
|
$10,300.000
|
$13,200.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 5 FT)(6:1) (C)
|
EA
|
6.000
|
$13,000.000
|
$8,800.000
|
|
|
SET (TY I)(S= 7 FT)(HW= 5 FT)(6:1) (C)
|
EA
|
14.000
|
$14,000.000
|
$9,900.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
40.000
|
$1,300.000
|
$1,210.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
6.000
|
$1,900.000
|
$1,672.000
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$5,000.000
|
$9,900.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
26.000
|
$1,400.000
|
$550.000
|
|
|
REMOV STR (PIPE)
|
LF
|
308.000
|
$20.000
|
$33.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$803,840.320
|
$1,045,901.510
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
15.000
|
$7,500.000
|
$2,805.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
390.000
|
$44.000
|
$41.250
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
390.000
|
$10.000
|
$13.200
|
|
|
BACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
27.000
|
$72.000
|
$704.950
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
1,609.000
|
$6.000
|
$6.050
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,609.000
|
$2.000
|
$1.100
|
|
|
INTERSECTIONS (ACP)
|
SY
|
549.000
|
$38.000
|
$99.530
|
|
|
DRIVEWAYS (ACP)
|
SY
|
368.000
|
$62.000
|
$214.340
|
|
|
TURNOUTS (ACP)
|
SY
|
305.090
|
$65.000
|
$163.790
|
|
|
DRIVEWAYS (BASE)
|
SY
|
1,453.000
|
$52.000
|
$181.770
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
85,630.000
|
$0.500
|
$0.130
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
42,246.000
|
$0.500
|
$0.130
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,300.000
|
$30.000
|
$29.430
|
|
|
MTL THRIE-BEAM GD FEN (TIM POST)
|
EA
|
8.000
|
$2,400.000
|
$1,980.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,175.000
|
$2.500
|
$6.050
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
8.000
|
$3,200.000
|
$3,190.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
8.000
|
$270.000
|
$275.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
17.000
|
$260.000
|
$269.500
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 2
|
EA
|
3.000
|
$265.000
|
$269.500
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
26.000
|
$560.000
|
$564.300
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
4.000
|
$670.000
|
$973.500
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
25.000
|
$94.000
|
$104.500
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
60.000
|
$30.000
|
$36.300
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
34.000
|
$83.000
|
$104.500
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
89,126.000
|
$0.500
|
$0.550
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
160.000
|
$5.500
|
$11.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
21,822.000
|
$0.500
|
$0.610
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
2,940.000
|
$0.500
|
$0.550
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
2,229.000
|
$1.000
|
$2.200
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
480.000
|
$1.000
|
$1.380
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
|
LF
|
89,224.000
|
$0.600
|
$0.740
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(090MIL)
|
LF
|
10,860.000
|
$0.600
|
$0.830
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
|
LF
|
2,234.000
|
$0.600
|
$0.740
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
86.000
|
$14.500
|
$16.500
|
|
PREFAB PAV MRK TY C (W) (RR XING)
|
EA
|
1.000
|
$930.000
|
$1,045.000
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
10.000
|
$30.000
|
$82.500
|
|
REFL PAV MRKR TY I-C
|
EA
|
12.000
|
$5.500
|
$6.050
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,094.000
|
$5.000
|
$6.050
|
|
|
TEMP TRAF SIGNALS
|
EA
|
2.000
|
$50,000.000
|
$9,240.000
|
|
|
D-GR HMA TY-C SAC-A PG76-22
|
TON
|
16,365.000
|
$150.000
|
$177.150
|
|
|
TACK COAT
|
GAL
|
8,926.000
|
$4.500
|
$5.270
|
|
|
CEMENT
|
TON
|
541.000
|
$225.000
|
$271.490
|
|
|
EMULSION
|
GAL
|
504,574.000
|
$3.000
|
$3.160
|
|
|
EMUL TRTMNT (MX EXST MTRL) 8"
|
SY
|
144,164.000
|
$3.000
|
$1.630
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,700.000
|
$9,240.000
|
|
|
TMA (STATIONARY)
|
DAY
|
210.000
|
$350.000
|
$330.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
10.000
|
$435.000
|
$330.000
|
|
Totals: |
$8,842,243.470
|
$11,322,202.971
|