Show Job Controls
Bid Cobra

JASPER FM 2246 (2120-01-028)

Items: 78

County: JASPER
Length: N/A
Highway: FM 2246
District: BEAUMONT
Control Number: 2120-01-028
DBE Goal: N/A
Project: F 2023(584)
Guaranty: N/A
Time: 214 WORKING DAYS
Engineer's Estimate: $8,842,243.47
Date: 04/04/2023 (3 years ago)
Contract Number: N/A
Type: SURFACING/ROADWAY RESTORATION
Mail/Deliver Bids To: N/A
BRYCE BROUSSARD
JIM GRISSOM
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (1)
E
Engineer's Estimate
$8,842,243.47
$11,322,202.97
Over/Under Est: 28.05% $2,479,959.50
Subcontractor Percentage Amount
J & M CONTRACTING, COMPANY 10.16% $1,162,652.62
AMERICAN REMEDIATION OPTIONS, INC. 3.39% $387,932.32
TRP CONSTRUCTION GROUP, LLC 1.21% $138,465.52
PANOLA SIGN & BARRICADE, INC. 0.41% $46,918.07
DUSTROL, INC. 0.23% $26,319.89
WEST TEXAS ROCK RESOURCES, LLC 0.13% $14,876.46
Total: 15.53% $1,777,164.88

Bid Items & Bid Tabulations

78 Total 0 of 78
JASPER  |  FM 2246  |  BEAUMONT  |  2120-01-028  |  04/04/2023  |  $8,842,243.47  |  F 2023(584)  |  SURF/ROADWAY RESTOR  |  214 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TEXAS MATERIALS GROUP, INC.
REMOVING CONCRETE(MOW STRIP)
LF 1,618.000 $6.000 $55.000
SUBGRADE WIDENING (ORD COMP)
STA 433.000 $600.000 $537.890
BACKFILL (TY B)
STA 433.000 $220.000 $321.800
SPEC EXCAV WORK (BACKHOE)
HR 80.000 $239.000 $475.840
BROADCAST SEED (TEMP) (WARM)
SY 24,769.000 $0.500 $0.150
BROADCAST SEED (TEMP) (COOL)
SY 24,769.000 $0.500 $0.150
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
SY 49,520.000 $0.500 $0.410
VEGETATIVE WATERING
MG 1,662.000 $30.000 $32.770
FL BS (CMP IN PLACE)(TY A GR 1-2)(10")
SY 33,639.000 $25.000 $57.490
RWRK BS MTL(TY C)(8")(ORD CMP)(ORG POS)
CY 32,037.000 $2.500 $13.370
FOG SEAL (CSS-1H)
GAL 10,092.000 $8.000 $16.260
PLANE ASPH CONC PAV(0" TO 2")
SY 3,071.000 $1.500 $9.350
RIPRAP (CONC)(5 IN)
CY 98.600 $500.000 $660.000
RIPRAP (MOW STRIP)(4 IN)
CY 126.000 $540.000 $660.000
RETROFIT RAIL (TY T131RC)
LF 1,093.000 $190.000 $227.700
RC PIPE (CL III)(18 IN)
LF 380.000 $90.000 $137.500
RC PIPE (CL III)(24 IN)
LF 106.000 $100.000 $158.400
RC PIPE (CL III)(36 IN)
LF 36.000 $150.000 $228.800
SET (TY I)(S= 4 FT)(HW= 5 FT)(6:1) (C)
EA 2.000 $7,500.000 $16,500.000
SET (TY I)(S= 5 FT)(HW= 3 FT)(6:1) (C)
EA 20.000 $8,000.000 $12,540.000
SET (TY I)(S= 5 FT)(HW= 4 FT)(4:1) (C)
EA 2.000 $9,300.000 $7,920.000
SET (TY I)(S= 5 FT)(HW= 4 FT)(6:1) (C)
EA 16.000 $10,400.000 $7,700.000
SET (TY I)(S= 5 FT)(HW= 5 FT)(6:1) (C)
EA 6.000 $10,300.000 $13,200.000
SET (TY I)(S= 6 FT)(HW= 5 FT)(6:1) (C)
EA 6.000 $13,000.000 $8,800.000
SET (TY I)(S= 7 FT)(HW= 5 FT)(6:1) (C)
EA 14.000 $14,000.000 $9,900.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 40.000 $1,300.000 $1,210.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 6.000 $1,900.000 $1,672.000
SET (TY II) (36 IN) (RCP) (6: 1) (P)
EA 2.000 $5,000.000 $9,900.000
REMOV STR (WINGWALL)
EA 26.000 $1,400.000 $550.000
REMOV STR (PIPE)
LF 308.000 $20.000 $33.000
MOBILIZATION
LS 1.000 $803,840.320 $1,045,901.510
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 15.000 $7,500.000 $2,805.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 390.000 $44.000 $41.250
ROCK FILTER DAMS (REMOVE)
LF 390.000 $10.000 $13.200
BACKHOE WORK (EROSION & SEDMT CONT)
HR 27.000 $72.000 $704.950
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 1,609.000 $6.000 $6.050
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,609.000 $2.000 $1.100
INTERSECTIONS (ACP)
SY 549.000 $38.000 $99.530
DRIVEWAYS (ACP)
SY 368.000 $62.000 $214.340
TURNOUTS (ACP)
SY 305.090 $65.000 $163.790
DRIVEWAYS (BASE)
SY 1,453.000 $52.000 $181.770
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 85,630.000 $0.500 $0.130
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 42,246.000 $0.500 $0.130
MTL W-BEAM GD FEN (TIM POST)
LF 1,300.000 $30.000 $29.430
MTL THRIE-BEAM GD FEN (TIM POST)
EA 8.000 $2,400.000 $1,980.000
REMOVE METAL BEAM GUARD FENCE
LF 1,175.000 $2.500 $6.050
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $3,200.000 $3,190.000
GUARDRAIL END TREATMENT (REMOVE)
EA 8.000 $270.000 $275.000
MAILBOX INSTALL-S (TWG-POST) TY 2
EA 17.000 $260.000 $269.500
MAILBOX INSTALL-D (TWG-POST) TY 2
EA 3.000 $265.000 $269.500
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 26.000 $560.000 $564.300
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 4.000 $670.000 $973.500
REMOVE SM RD SN SUP&AM
EA 25.000 $94.000 $104.500
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 60.000 $30.000 $36.300
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 34.000 $83.000 $104.500
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 89,126.000 $0.500 $0.550
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 160.000 $5.500 $11.000
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 21,822.000 $0.500 $0.610
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 2,940.000 $0.500 $0.550
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 2,229.000 $1.000 $2.200
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 480.000 $1.000 $1.380
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
LF 89,224.000 $0.600 $0.740
RE PM W/RET REQ TY I (Y)6"(BRK)(090MIL)
LF 10,860.000 $0.600 $0.830
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
LF 2,234.000 $0.600 $0.740
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 86.000 $14.500 $16.500
PREFAB PAV MRK TY C (W) (RR XING)
EA 1.000 $930.000 $1,045.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 10.000 $30.000 $82.500
REFL PAV MRKR TY I-C
EA 12.000 $5.500 $6.050
REFL PAV MRKR TY II-A-A
EA 1,094.000 $5.000 $6.050
TEMP TRAF SIGNALS
EA 2.000 $50,000.000 $9,240.000
D-GR HMA TY-C SAC-A PG76-22
TON 16,365.000 $150.000 $177.150
TACK COAT
GAL 8,926.000 $4.500 $5.270
CEMENT
TON 541.000 $225.000 $271.490
EMULSION
GAL 504,574.000 $3.000 $3.160
EMUL TRTMNT (MX EXST MTRL) 8"
SY 144,164.000 $3.000 $1.630
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,700.000 $9,240.000
TMA (STATIONARY)
DAY 210.000 $350.000 $330.000
TMA (MOBILE OPERATION)
DAY 10.000 $435.000 $330.000
Totals: $8,842,243.470 $11,322,202.971