|
|
BACKFILL (TY A OR B)
|
STA
|
554.000
|
$350.000
|
$314.800
|
|
|
BROADCAST SEED (PERM) (RURAL) (CLAY)
|
SY
|
61,517.000
|
$1.000
|
$0.150
|
|
|
VEGETATIVE WATERING
|
MG
|
517.200
|
$15.000
|
$40.480
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
1,200.000
|
$120.000
|
$141.220
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
4,039.000
|
$4.000
|
$8.250
|
|
|
PLANE ASPH CONC PAV (1")
|
SY
|
24,607.000
|
$3.000
|
$3.990
|
|
|
CL C CONC (RAC-R)
|
CY
|
8.400
|
$1,800.000
|
$1,650.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
55.100
|
$600.000
|
$660.000
|
|
|
RETROFIT RAIL (TY T223)
|
LF
|
67.000
|
$400.000
|
$330.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$575,000.000
|
$458,479.860
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
7.000
|
$6,000.000
|
$7,596.190
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
1,600.000
|
$5.000
|
$5.780
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,600.000
|
$1.500
|
$1.100
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
2.000
|
$7,000.000
|
$9,240.000
|
|
|
INTERSECTIONS (ACP)
|
SY
|
2,329.000
|
$50.000
|
$43.770
|
|
|
DRIVEWAYS AND TURNOUTS (ACP)
|
SY
|
126.000
|
$40.000
|
$291.500
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
54,286.000
|
$1.000
|
$0.500
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
800.000
|
$30.000
|
$27.500
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,000.000
|
$2,090.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$3,000.000
|
$3,080.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
56.000
|
$300.000
|
$324.500
|
|
|
MAILBOX INSTALL-D (TWW-POST) TY 4
|
EA
|
7.000
|
$400.000
|
$357.500
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
11.000
|
$750.000
|
$687.500
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
84.000
|
$600.000
|
$564.300
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
5.000
|
$750.000
|
$973.500
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
4.000
|
$1,000.000
|
$1,666.500
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
1.000
|
$1,200.000
|
$1,039.500
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
3.000
|
$1,300.000
|
$1,155.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
96.000
|
$100.000
|
$104.500
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
128.000
|
$40.000
|
$39.600
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
|
EA
|
57.000
|
$160.000
|
$82.500
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
2,000.000
|
$1.500
|
$7.700
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
5,398.000
|
$1.000
|
$2.200
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
1,302.000
|
$2.000
|
$0.990
|
|
|
REF PROF PAV MRK TY I(W)6"(SLD)(090MIL)
|
LF
|
109,751.000
|
$1.500
|
$1.100
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(090MIL)
|
LF
|
4,410.000
|
$0.750
|
$0.770
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
|
LF
|
88,492.000
|
$0.750
|
$0.720
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
180.000
|
$12.000
|
$19.250
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
8.000
|
$300.000
|
$357.500
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
10.000
|
$25.000
|
$82.500
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,635.000
|
$5.000
|
$5.500
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
200.000
|
$0.600
|
$0.830
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
2,000.000
|
$0.750
|
$0.830
|
|
|
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
|
EA
|
6.000
|
$7,500.000
|
$6,594.500
|
|
|
D-GR HMA TY-C SAC-A PG76-22
|
TON
|
17,327.000
|
$130.000
|
$150.930
|
|
|
TACK COAT
|
GAL
|
11,147.000
|
$7.000
|
$5.180
|
|
|
D-GR HMA TY-D PG 64-22 (EXEMPT)
|
TON
|
1,354.000
|
$130.000
|
$247.340
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$9,240.000
|
|
|
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
|
LF
|
320.000
|
$35.000
|
$11.000
|
|
|
TMA (STATIONARY)
|
DAY
|
75.000
|
$350.000
|
$330.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
36.000
|
$350.000
|
$330.000
|
|
Totals: |
$4,429,767.000
|
$4,779,349.756
|