JASPER FM 1005 (1275-01-045)

Items: 51

County: JASPER
Length: N/A
Highway: FM 1005
District: BEAUMONT
Control Number: 1275-01-045
DBE Goal: N/A
Project: F 2023(523)
Guaranty: N/A
Time: 93 WORKING DAYS
Engineer's Estimate: $4,429,767.00
Date: 03/07/2023 (3 years ago)
Contract Number: N/A
Type: SURFACING/ROADWAY RESTORATION
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (1)
E
Engineer's Estimate
$4,429,767.00
$4,779,349.75
Over/Under Est: 7.89% $349,582.75
Subcontractor Percentage Amount
AMERICAN REMEDIATION OPTIONS, INC. 4.07% $194,845.62
TRP CONSTRUCTION GROUP, LLC 3.99% $191,015.73
DUSTROL, INC. 2.34% $112,024.26
NORMAN HIGHWAY CONSTRUCTORS, INC. 1.53% $73,246.63
PANOLA SIGN & BARRICADE, INC. 0.37% $17,713.24
WEST TEXAS ROCK RESOURCES, LLC 0.16% $7,659.78
AT STAFFING 0.00% $0.00
Total: 12.46% $596,505.26

Bid Items & Bid Tabulations

51 Total 0 of 51
JASPER  |  FM 1005  |  BEAUMONT  |  1275-01-045  |  03/07/2023  |  $4,429,767.00  |  F 2023(523)  |  SURF/ROADWAY RESTOR  |  93 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TEXAS MATERIALS GROUP, INC.
BACKFILL (TY A OR B)
STA 554.000 $350.000 $314.800
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 61,517.000 $1.000 $0.150
VEGETATIVE WATERING
MG 517.200 $15.000 $40.480
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 1,200.000 $120.000 $141.220
PLANE ASPH CONC PAV(0" TO 2")
SY 4,039.000 $4.000 $8.250
PLANE ASPH CONC PAV (1")
SY 24,607.000 $3.000 $3.990
CL C CONC (RAC-R)
CY 8.400 $1,800.000 $1,650.000
RIPRAP (MOW STRIP)(4 IN)
CY 55.100 $600.000 $660.000
RETROFIT RAIL (TY T223)
LF 67.000 $400.000 $330.000
MOBILIZATION
LS 1.000 $575,000.000 $458,479.860
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $6,000.000 $7,596.190
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 1,600.000 $5.000 $5.780
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,600.000 $1.500 $1.100
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 2.000 $7,000.000 $9,240.000
INTERSECTIONS (ACP)
SY 2,329.000 $50.000 $43.770
DRIVEWAYS AND TURNOUTS (ACP)
SY 126.000 $40.000 $291.500
RUMBLE STRIPS (CENTERLINE)
LF 54,286.000 $1.000 $0.500
MTL W-BEAM GD FEN (TIM POST)
LF 800.000 $30.000 $27.500
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,000.000 $2,090.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,000.000 $3,080.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 56.000 $300.000 $324.500
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 7.000 $400.000 $357.500
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 11.000 $750.000 $687.500
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 84.000 $600.000 $564.300
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 5.000 $750.000 $973.500
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 4.000 $1,000.000 $1,666.500
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 1.000 $1,200.000 $1,039.500
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 3.000 $1,300.000 $1,155.000
REMOVE SM RD SN SUP&AM
EA 96.000 $100.000 $104.500
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 128.000 $40.000 $39.600
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
EA 57.000 $160.000 $82.500
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 2,000.000 $1.500 $7.700
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 5,398.000 $1.000 $2.200
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 1,302.000 $2.000 $0.990
REF PROF PAV MRK TY I(W)6"(SLD)(090MIL)
LF 109,751.000 $1.500 $1.100
RE PM W/RET REQ TY I (Y)6"(BRK)(090MIL)
LF 4,410.000 $0.750 $0.770
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
LF 88,492.000 $0.750 $0.720
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 180.000 $12.000 $19.250
PREFAB PAV MRK TY C (W) (WORD)
EA 8.000 $300.000 $357.500
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 10.000 $25.000 $82.500
REFL PAV MRKR TY II-A-A
EA 1,635.000 $5.000 $5.500
ELIM EXT PAV MRK & MRKS (4")
LF 200.000 $0.600 $0.830
ELIM EXT PAV MRK & MRKS (6")
LF 2,000.000 $0.750 $0.830
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
EA 6.000 $7,500.000 $6,594.500
D-GR HMA TY-C SAC-A PG76-22
TON 17,327.000 $130.000 $150.930
TACK COAT
GAL 11,147.000 $7.000 $5.180
D-GR HMA TY-D PG 64-22 (EXEMPT)
TON 1,354.000 $130.000 $247.340
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $9,240.000
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
LF 320.000 $35.000 $11.000
TMA (STATIONARY)
DAY 75.000 $350.000 $330.000
TMA (MOBILE OPERATION)
DAY 36.000 $350.000 $330.000
Totals: $4,429,767.000 $4,779,349.756