JACKSON CR (0913-18-035)

Items: 35

County: JACKSON
Length: N/A
Highway: CR
District: YOAKUM
Control Number: 0913-18-035
DBE Goal: N/A
Project: BR 1802(789)
Guaranty: N/A
Time: 60 WORKING DAYS
Engineer's Estimate: $563,109.00
Date: 07/08/2020 (5 years ago)
Contract Number: N/A
Type: REPLACE BRIDGE AND APPROACHES
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$563,109.00
$495,981.00
Over/Under Est: -11.92% -$67,128.00
$577,571.31
Over/Under Est: 2.57% $14,462.31
Amt Left: 16.45% $81,590.31
Over/Under Est: 3.19% $17,971.63
Amt Left: 17.16% $85,099.63
Delta: -0.61% -$3,509.32
Over/Under Est: 11.08% $62,368.45
Amt Left: 26.11% $129,496.45
Delta: -7.64% -$44,396.82
$761,955.00
Over/Under Est: 35.31% $198,846.00
Amt Left: 53.63% $265,974.00
Delta: -21.82% -$136,477.55

Bid Items & Bid Tabulations

35 Total 0 of 35
JACKSON  |  CR  |  YOAKUM  |  0913-18-035  |  07/08/2020  |  $563,109.00  |  BR 1802(789)  |  REPLACE BRIDGE AND APPROACHES  |  60 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
CONSTAR CONSTRUCTION
SB CONTRACTORS LLC
REXCO CONSTRUCTION SERVICES, INC.
LESTER CONTRACTING, INC.
3LW CIVIL LLC
PREPARING ROW
STA 1.450 $3,000.000 $900.000 $8,000.000 $7,500.000 $1,600.000 $5,000.000
EXCAVATION (ROADWAY AND CHANNEL)
CY 157.000 $20.000 $8.000 $18.000 $60.000 $70.000 $42.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 540.000 $25.000 $17.000 $30.720 $36.420 $36.000 $30.000
BLADING
HR 20.000 $100.000 $100.000 $86.930 $100.000 $160.000 $160.000
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 979.000 $2.000 $2.000 $1.730 $1.580 $0.800 $1.500
BROADCAST SEED (TEMP) (WARM)
SY 245.000 $2.000 $2.000 $1.000 $3.980 $3.000 $1.500
BROADCAST SEED (TEMP) (COOL)
SY 245.000 $2.000 $2.000 $1.000 $3.980 $3.000 $1.500
VEGETATIVE WATERING
MG 8.300 $50.000 $160.000 $70.690 $306.000 $90.000 $35.000
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
CY 272.000 $100.000 $125.000 $141.360 $112.840 $110.000 $199.000
ASPH (RC-250)
GAL 232.000 $25.000 $27.000 $11.160 $16.020 $12.250 $19.000
AGGR(TY-E GR-5 SAC-B)
CY 8.000 $105.000 $540.000 $949.220 $1,365.000 $1,045.000 $310.000
AGGR(TY-PE GR-4 SAC-B)
CY 8.000 $125.000 $540.000 $1,043.610 $1,390.000 $1,150.000 $320.000
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
GAL 395.000 $20.000 $27.000 $9.760 $14.440 $10.750 $18.000
CEM STABIL BKFL
CY 45.000 $100.000 $75.000 $154.190 $101.300 $165.000 $225.000
PRESTR CONC PIL (18 IN SQ)
LF 396.000 $140.000 $132.000 $131.060 $152.590 $183.500 $220.000
CL C CONC (ABUT)
CY 29.800 $1,000.000 $850.000 $1,020.270 $1,208.000 $1,440.000 $1,250.000
REINF CONC SLAB (BOX BEAM)
SF 1,961.000 $20.000 $17.000 $25.630 $22.320 $24.500 $25.000
PRESTR CONC BOX BEAM (5B20)
LF 387.000 $230.000 $210.000 $198.640 $179.380 $247.000 $255.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 347.000 $140.000 $150.000 $179.920 $128.380 $150.000 $210.000
RAIL (TY T223)
LF 162.000 $100.000 $130.000 $129.860 $165.740 $250.000 $210.000
ARMOR JOINT (SEALED)
LF 52.000 $75.000 $90.000 $103.890 $100.550 $189.000 $75.000
RC PIPE (CL III)(36 IN)
LF 424.000 $180.000 $95.000 $132.920 $120.560 $133.000 $185.000
SET (TY II) (36 IN) (RCP) (6: 1) (P)
EA 3.000 $4,000.000 $4,700.000 $3,779.070 $5,794.080 $5,350.000 $7,500.000
REMOV STR (PIPE)
LF 168.000 $19.000 $25.000 $18.980 $27.000 $20.000 $42.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $25,000.000 $7,000.000 $8,845.200 $20,500.000 $14,500.000 $25,000.000
MOBILIZATION
LS 1.000 $50,000.000 $49,000.000 $57,000.000 $62,500.000 $40,000.000 $75,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $5,000.000 $840.000 $3,500.000 $681.360 $1,625.000 $8,000.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 445.000 $3.000 $5.000 $5.020 $4.590 $4.500 $3.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 445.000 $1.000 $2.000 $2.230 $2.040 $1.000 $1.000
MTL W-BEAM GD FEN (TIM POST)
LF 100.000 $25.000 $40.000 $31.230 $30.600 $52.000 $30.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $1,800.000 $1,900.000 $1,896.200 $1,466.250 $1,800.000 $2,000.000
DRIVEWAY TERMINAL ANCHOR SECTION
EA 1.000 $840.000 $1,300.000 $1,059.650 $1,020.000 $1,125.000 $1,200.000
GUARDRAIL END TREATMENT (INSTALL)
EA 3.000 $2,800.000 $3,600.000 $3,346.250 $2,754.000 $3,150.000 $2,800.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 4.000 $11.000 $24.000 $22.310 $18.360 $90.000 $20.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 4.000 $25.000 $45.000 $27.880 $34.680 $90.000 $20.000
Totals: $563,109.000 $495,981.000 $577,571.323 $581,080.630 $625,477.450 $761,955.000