EXCAVATION (ROADWAY)
|
CY
|
9,058.000
|
$15.000
|
$14.220
|
$15.000
|
$16.000
|
$11.220
|
$19.280
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
152.850
|
$450.000
|
$533.860
|
$300.000
|
$200.000
|
$197.250
|
$767.000
|
|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
|
CY
|
2,659.000
|
$35.000
|
$13.990
|
$20.000
|
$10.000
|
$21.900
|
$14.110
|
|
|
BACKFILL (TY A OR B)
|
STA
|
27.950
|
$150.000
|
$560.000
|
$250.000
|
$350.000
|
$106.040
|
$141.050
|
|
|
BLADING
|
HR
|
50.000
|
$100.000
|
$100.000
|
$125.000
|
$125.000
|
$96.900
|
$97.650
|
|
|
BROADCAST SEED (PERM) (RURAL) (SANDY)
|
AC
|
10.530
|
$1,300.000
|
$993.000
|
$1,200.000
|
$1,000.000
|
$993.000
|
$993.000
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
AC
|
2.630
|
$1,300.000
|
$824.000
|
$1,100.000
|
$860.000
|
$824.000
|
$824.000
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
AC
|
2.630
|
$1,300.000
|
$824.000
|
$1,100.000
|
$860.000
|
$824.000
|
$824.000
|
|
|
VEGETATIVE WATERING
|
MG
|
428.990
|
$20.000
|
$20.000
|
$15.000
|
$23.000
|
$13.320
|
$13.510
|
|
|
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
|
CY
|
10,567.000
|
$70.000
|
$80.040
|
$75.000
|
$77.000
|
$75.580
|
$83.960
|
|
|
CEMENT
|
TON
|
464.000
|
$165.000
|
$165.000
|
$165.000
|
$187.000
|
$178.500
|
$171.000
|
|
|
CEMENT TREAT (EXIST MATL) (6")
|
SY
|
50,950.000
|
$3.000
|
$1.970
|
$1.000
|
$2.750
|
$1.940
|
$1.950
|
|
|
ASPH (RC-250)
|
GAL
|
8,831.000
|
$4.500
|
$4.480
|
$4.250
|
$5.400
|
$5.000
|
$4.320
|
|
|
AGGR(TY-E GR-5 SAC-B)
|
CY
|
315.000
|
$120.000
|
$162.900
|
$150.000
|
$180.000
|
$113.280
|
$124.900
|
|
|
AGGR(TY-PE GR-3 SAC-B)
|
CY
|
520.000
|
$100.000
|
$127.900
|
$125.000
|
$130.000
|
$108.790
|
$105.350
|
|
|
AGGR(TY-PE GR-4 SAC-B)
|
CY
|
475.000
|
$100.000
|
$122.820
|
$105.000
|
$130.000
|
$108.650
|
$110.790
|
|
|
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
|
GAL
|
38,658.000
|
$4.000
|
$3.500
|
$3.250
|
$4.000
|
$3.950
|
$3.550
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
200.000
|
$65.000
|
$120.000
|
$115.000
|
$95.000
|
$136.900
|
$64.040
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
10,139.000
|
$1.750
|
$2.000
|
$2.500
|
$2.600
|
$2.820
|
$1.490
|
|
|
PLANE ASPH CONC PAV (6")
|
SY
|
7,453.000
|
$3.000
|
$4.500
|
$4.500
|
$5.400
|
$5.710
|
$5.000
|
|
|
CEM STABIL BKFL
|
CY
|
43.200
|
$150.000
|
$164.120
|
$185.000
|
$175.000
|
$183.730
|
$150.000
|
|
|
CUT & RESTORING PAV
|
SY
|
288.000
|
$135.000
|
$13.670
|
$80.000
|
$60.000
|
$244.980
|
$200.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
43.000
|
$21.000
|
$5.750
|
$6.000
|
$6.000
|
$24.500
|
$20.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
160.000
|
$45.000
|
$15.680
|
$20.000
|
$17.000
|
$91.870
|
$75.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
17.400
|
$450.000
|
$428.460
|
$500.000
|
$450.000
|
$796.170
|
$650.000
|
|
|
CMP (GAL STL 18 IN)
|
LF
|
42.000
|
$75.000
|
$82.620
|
$95.000
|
$87.000
|
$73.490
|
$60.000
|
|
|
CMP (GAL STL 24 IN)
|
LF
|
8.000
|
$95.000
|
$97.160
|
$110.000
|
$100.000
|
$165.360
|
$135.000
|
|
|
CMP (GAL STL 15 IN)
|
LF
|
8.000
|
$75.000
|
$70.760
|
$80.000
|
$75.000
|
$61.240
|
$50.000
|
|
|
CONC BOX CULV (3 FT X 3 FT)
|
LF
|
44.000
|
$600.000
|
$292.110
|
$350.000
|
$310.000
|
$612.440
|
$550.000
|
|
|
CONC BOX CULV (5 FT X 3 FT)
|
LF
|
2.000
|
$550.000
|
$454.250
|
$525.000
|
$480.000
|
$1,224.880
|
$1,000.000
|
|
|
CONC BOX CULV (7 FT X 3 FT)(EXTEND)
|
LF
|
32.000
|
$669.000
|
$428.230
|
$500.000
|
$450.000
|
$1,041.150
|
$950.000
|
|
|
RC PIPE (CL III)(15 IN)
|
LF
|
122.000
|
$75.000
|
$60.080
|
$70.000
|
$64.000
|
$63.690
|
$52.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
725.000
|
$80.000
|
$62.910
|
$75.000
|
$66.000
|
$75.940
|
$62.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
62.000
|
$100.000
|
$78.380
|
$90.000
|
$82.000
|
$171.480
|
$140.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
6.000
|
$165.000
|
$148.070
|
$175.000
|
$155.000
|
$367.460
|
$300.000
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
4.000
|
$185.000
|
$222.910
|
$250.000
|
$235.000
|
$673.680
|
$550.000
|
|
|
JCTBOX(COMPL)(PJB)(3FTX3FT)
|
EA
|
1.000
|
$5,000.000
|
$3,803.630
|
$4,500.000
|
$4,000.000
|
$6,124.410
|
$5,000.000
|
|
|
JCTBOX(COMPL)(PJB)(4FTX4FT)
|
EA
|
1.000
|
$5,500.000
|
$4,978.020
|
$5,600.000
|
$5,300.000
|
$11,023.930
|
$9,000.000
|
|
|
JCTBOX(COMPL)(PJB)(6FTX6FT)
|
EA
|
1.000
|
$7,525.000
|
$9,354.120
|
$11,000.000
|
$9,800.000
|
$11,636.370
|
$9,500.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 4 FT)(3:1) (C)
|
EA
|
2.000
|
$8,100.000
|
$10,154.840
|
$12,000.000
|
$11,000.000
|
$11,023.930
|
$9,000.000
|
|
|
SET (TY I)(S= 7 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
8.000
|
$12,000.000
|
$5,776.200
|
$7,000.000
|
$6,100.000
|
$14,698.570
|
$12,000.000
|
|
|
SET (TY II) (15 IN) (CMP) (6: 1) (P)
|
EA
|
2.000
|
$975.000
|
$1,340.890
|
$1,500.000
|
$1,400.000
|
$1,224.880
|
$1,000.000
|
|
|
SET (TY II) (15 IN) (RCP) (6: 1) (P)
|
EA
|
14.000
|
$985.000
|
$1,177.890
|
$1,325.000
|
$1,300.000
|
$1,224.880
|
$1,000.000
|
|
|
SET (TY II) (18 IN) (CMP) (6: 1) (P)
|
EA
|
16.000
|
$1,126.000
|
$1,372.460
|
$1,550.000
|
$1,400.000
|
$1,837.320
|
$1,250.000
|
|
|
SET (TY II) (18 IN) (HDPE) (6: 1) (P)
|
EA
|
12.000
|
$1,125.000
|
$1,557.700
|
$1,750.000
|
$1,600.000
|
$1,837.320
|
$1,250.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
55.000
|
$1,350.000
|
$1,557.640
|
$1,750.000
|
$1,600.000
|
$1,837.320
|
$1,250.000
|
|
|
SET (TY II) (24 IN) (CMP) (6: 1) (P)
|
EA
|
4.000
|
$1,600.000
|
$1,824.270
|
$2,100.000
|
$1,900.000
|
$3,062.200
|
$1,500.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
4.000
|
$1,650.000
|
$1,861.790
|
$2,100.000
|
$2,000.000
|
$2,449.760
|
$1,500.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$1,850.000
|
$1,886.400
|
$2,125.000
|
$2,000.000
|
$3,062.200
|
$1,850.000
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (C)
|
EA
|
1.000
|
$4,400.000
|
$6,106.640
|
$7,000.000
|
$6,500.000
|
$4,899.520
|
$3,650.000
|
|
|
SET (TY II) (48 IN) (RCP) (6: 1) (C)
|
EA
|
1.000
|
$5,000.000
|
$14,622.560
|
$15,000.000
|
$16,000.000
|
$7,349.290
|
$5,550.000
|
|
|
REMOV STR (SMALL)
|
EA
|
30.000
|
$1,000.000
|
$830.160
|
$1,000.000
|
$870.000
|
$1,837.320
|
$1,250.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$275,000.000
|
$160,750.000
|
$400,000.000
|
$280,000.000
|
$330,680.190
|
$370,194.160
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
9.000
|
$3,500.000
|
$4,640.000
|
$10,000.000
|
$6,500.000
|
$4,415.180
|
$3,035.280
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
100.000
|
$50.000
|
$38.000
|
$30.000
|
$39.000
|
$38.000
|
$38.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
100.000
|
$10.000
|
$9.000
|
$12.000
|
$9.500
|
$9.000
|
$9.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,020.000
|
$3.750
|
$5.840
|
$6.000
|
$6.000
|
$5.840
|
$5.840
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,020.000
|
$1.000
|
$0.500
|
$1.500
|
$0.500
|
$0.500
|
$0.500
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
2,640.000
|
$35.000
|
$29.920
|
$30.000
|
$45.000
|
$26.280
|
$36.850
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 1
|
EA
|
5.000
|
$350.000
|
$395.000
|
$450.000
|
$415.000
|
$395.000
|
$395.000
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
22.000
|
$190.000
|
$135.000
|
$150.000
|
$142.000
|
$135.000
|
$135.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
4.000
|
$550.000
|
$595.000
|
$650.000
|
$625.000
|
$595.000
|
$595.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
3.000
|
$700.000
|
$640.000
|
$700.000
|
$675.000
|
$640.000
|
$640.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
28.000
|
$390.000
|
$390.000
|
$425.000
|
$410.000
|
$390.000
|
$390.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(T)
|
EA
|
1.000
|
$490.000
|
$470.000
|
$525.000
|
$500.000
|
$470.000
|
$470.000
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
1.000
|
$663.000
|
$660.000
|
$700.000
|
$700.000
|
$660.000
|
$660.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
32.000
|
$95.000
|
$75.000
|
$80.000
|
$79.000
|
$75.000
|
$75.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND(BI)
|
EA
|
12.000
|
$75.000
|
$75.000
|
$80.000
|
$79.000
|
$75.000
|
$75.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
3,564.000
|
$0.220
|
$0.240
|
$0.400
|
$0.350
|
$0.350
|
$0.350
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
13,300.000
|
$0.220
|
$0.320
|
$0.400
|
$0.350
|
$0.350
|
$0.350
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
31,163.000
|
$0.280
|
$0.220
|
$0.400
|
$0.350
|
$0.350
|
$0.350
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
324.000
|
$2.000
|
$1.500
|
$0.850
|
$0.700
|
$1.410
|
$1.370
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
5,545.000
|
$2.000
|
$1.500
|
$0.850
|
$0.700
|
$1.410
|
$1.370
|
|
|
PAVEMENT SEALER 4"
|
LF
|
2,470.000
|
$0.300
|
$0.290
|
$0.500
|
$0.500
|
$0.450
|
$0.450
|
|
|
PAVEMENT SEALER 24"
|
LF
|
180.000
|
$2.500
|
$3.500
|
$3.250
|
$3.200
|
$3.000
|
$3.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
12,508.000
|
$0.350
|
$0.710
|
$0.750
|
$0.680
|
$0.650
|
$0.650
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
4,240.000
|
$0.350
|
$0.800
|
$0.750
|
$0.680
|
$0.650
|
$0.650
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
10,509.000
|
$0.350
|
$0.710
|
$0.750
|
$0.680
|
$0.650
|
$0.650
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
|
LF
|
30,570.000
|
$0.800
|
$0.910
|
$0.800
|
$0.840
|
$0.800
|
$0.800
|
|
|
REF PROF PAV MRK TY I(Y)4"(BRK)(100MIL)
|
LF
|
3,506.000
|
$0.800
|
$0.980
|
$0.850
|
$0.820
|
$0.780
|
$0.780
|
|
|
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
|
LF
|
7,177.000
|
$0.800
|
$0.910
|
$0.850
|
$0.820
|
$0.780
|
$0.780
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
286.000
|
$16.000
|
$16.500
|
$22.000
|
$21.000
|
$20.000
|
$20.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
343.000
|
$4.000
|
$6.000
|
$5.250
|
$5.250
|
$5.000
|
$5.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
2,856.000
|
$0.650
|
$0.750
|
$1.500
|
$1.000
|
$1.500
|
$1.000
|
|
|
TREE TRIMMING
|
MI
|
0.230
|
$62,500.000
|
$48,000.000
|
$10,000.000
|
$32,000.000
|
$21,000.000
|
$25,000.000
|
|
|
D-GR HMA TY-B SAC-B PG64-22
|
TON
|
1,640.000
|
$85.000
|
$110.000
|
$110.000
|
$125.000
|
$97.110
|
$95.170
|
|
|
D-GR HMA TY-D SAC-B PG70-22
|
TON
|
1,935.000
|
$87.000
|
$125.000
|
$122.000
|
$125.000
|
$109.710
|
$110.070
|
|
|
THERMO PIPE(18")(HDPE)(TY S)(CSB)
|
LF
|
32.000
|
$100.000
|
$75.000
|
$100.000
|
$250.000
|
$67.370
|
$55.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$9,500.000
|
$13,000.000
|
$7,500.000
|
$15,000.000
|
$7,689.620
|
$8,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
20.000
|
$270.000
|
$200.000
|
$250.000
|
$350.000
|
$512.640
|
$170.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
20.000
|
$300.000
|
$200.000
|
$25.000
|
$100.000
|
$922.750
|
$170.000
|
|
Totals: |
$3,058,632.020
|
$3,029,884.419
|
$3,236,701.100
|
$3,284,831.490
|
$3,321,283.781
|
$3,365,426.212
|