PREPARING ROW
|
STA
|
58.150
|
$3,200.000
|
$750.000
|
$1,667.000
|
$135.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
191.000
|
$16.000
|
$46.000
|
$83.000
|
$35.000
|
|
|
REMOVING STAB BASE AND ASPH PAV(0"-16")
|
SY
|
7,891.000
|
$17.000
|
$6.900
|
$9.000
|
$12.000
|
|
|
REMOV STAB BASE AND ASPH PAV (3"-9")
|
SY
|
563.000
|
$7.750
|
$6.900
|
$11.000
|
$15.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
4,679.390
|
$5.000
|
$13.000
|
$37.000
|
$23.500
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
4,886.310
|
$25.000
|
$11.000
|
$44.000
|
$23.500
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
12,052.000
|
$0.900
|
$4.900
|
$5.000
|
$5.500
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
12,052.000
|
$1.950
|
$0.300
|
$1.160
|
$0.250
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
12,052.000
|
$2.400
|
$0.300
|
$1.160
|
$0.250
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
12,052.000
|
$1.000
|
$0.400
|
$1.450
|
$0.330
|
|
|
VEGETATIVE WATERING
|
MG
|
421.820
|
$21.000
|
$80.000
|
$58.000
|
$55.000
|
|
|
FL BS (CMP IN PLACE)(TY A GR 1-2)(12")
|
SY
|
20,873.000
|
$22.800
|
$25.000
|
$20.000
|
$28.000
|
|
|
LIME (HYDRATED LIME (SLURRY))
|
TON
|
324.600
|
$161.000
|
$230.000
|
$222.000
|
$215.000
|
|
|
LIME TRT (SUBGRADE)(8")
|
SY
|
19,473.000
|
$5.500
|
$7.500
|
$14.000
|
$12.500
|
|
|
CEMENT
|
TON
|
434.900
|
$175.000
|
$310.000
|
$248.000
|
$265.000
|
|
|
CEMENT TREAT (NEW BASE)(12")
|
SY
|
20,873.000
|
$3.030
|
$3.500
|
$10.000
|
$10.600
|
|
|
PRIME COAT (MC-30 OR EC-30)
|
GAL
|
4,174.600
|
$3.250
|
$4.500
|
$7.400
|
$5.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
3,120.000
|
$14.000
|
$42.000
|
$39.000
|
$45.000
|
|
|
RIPRAP (STONE TYPE R)(DRY)(24")
|
CY
|
45.000
|
$250.000
|
$250.000
|
$220.000
|
$375.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
79.000
|
$510.000
|
$600.000
|
$754.000
|
$815.000
|
|
|
CONC BOX CULV (4 FT X 4 FT)(EXTEND)
|
LF
|
84.000
|
$540.850
|
$360.000
|
$1,088.000
|
$900.000
|
|
|
CONC BOX CULV (6 FT X 5 FT)(EXTEND)
|
LF
|
32.000
|
$1,326.150
|
$670.000
|
$1,400.000
|
$1,175.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
484.000
|
$67.000
|
$160.000
|
$130.000
|
$90.000
|
|
|
JCT BOX (CIP)(SPL)(COMPL)(27FTX14FT)
|
EA
|
1.000
|
$96,000.000
|
$69,000.000
|
$69,500.000
|
$90,000.000
|
|
|
WINGWALL (FW - 0) (HW=6 FT)
|
EA
|
1.000
|
$12,000.000
|
$13,000.000
|
$11,050.000
|
$27,000.000
|
|
|
WINGWALL (PW - 1) (HW=10 FT)
|
EA
|
1.000
|
$41,908.000
|
$59,000.000
|
$31,500.000
|
$54,000.000
|
|
|
WINGWALL (PW - 1) (HW=12 FT)
|
EA
|
1.000
|
$100,000.000
|
$108,000.000
|
$53,000.000
|
$85,500.000
|
|
|
WINGWALL (PW - 1) (HW=5 FT)
|
EA
|
1.000
|
$13,700.000
|
$25,000.000
|
$25,100.000
|
$18,000.000
|
|
|
WINGWALL (PW - 1) (HW=8 FT)
|
EA
|
1.000
|
$26,500.000
|
$44,000.000
|
$33,150.000
|
$41,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
20.000
|
$1,750.000
|
$1,700.000
|
$2,575.000
|
$1,700.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
5.000
|
$1,680.000
|
$910.000
|
$3,962.000
|
$2,500.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
4.000
|
$2,450.000
|
$3,300.000
|
$4,728.000
|
$1,500.000
|
|
|
REMOV STR (PIPE)
|
LF
|
64.000
|
$16.500
|
$6.800
|
$67.000
|
$20.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$291,442.330
|
$355,000.000
|
$369,000.000
|
$300,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
11.000
|
$8,000.000
|
$20,000.000
|
$6,620.000
|
$56,000.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
222.000
|
$19.000
|
$32.000
|
$21.000
|
$25.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
222.000
|
$8.150
|
$13.000
|
$6.000
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
12,542.000
|
$1.890
|
$3.600
|
$4.000
|
$2.850
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
12,542.000
|
$0.280
|
$0.500
|
$1.000
|
$0.400
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
132.000
|
$5.850
|
$7.600
|
$10.000
|
$6.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
132.000
|
$1.200
|
$1.300
|
$2.000
|
$1.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
163.000
|
$82.500
|
$90.000
|
$138.000
|
$190.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
1,129.000
|
$45.000
|
$35.000
|
$56.000
|
$70.000
|
|
|
TURNOUTS (ACP)
|
SY
|
6.000
|
$55.000
|
$30.000
|
$200.000
|
$375.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
11,218.000
|
$0.200
|
$0.550
|
$1.000
|
$0.760
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
1,515.000
|
$0.170
|
$0.550
|
$2.000
|
$1.020
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,900.000
|
$24.000
|
$35.000
|
$46.000
|
$27.850
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
436.000
|
$2.800
|
$5.100
|
$7.000
|
$4.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
10.000
|
$2,750.000
|
$3,800.000
|
$3,549.000
|
$3,000.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
2.000
|
$250.000
|
$320.000
|
$750.000
|
$250.000
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 1
|
EA
|
1.000
|
$380.000
|
$570.000
|
$1,260.000
|
$545.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
29.000
|
$640.000
|
$910.000
|
$890.000
|
$800.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
4.000
|
$800.000
|
$1,200.000
|
$892.000
|
$900.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T-2EXT)
|
EA
|
1.000
|
$1,100.000
|
$1,400.000
|
$1,200.000
|
$950.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
15.000
|
$160.000
|
$120.000
|
$450.000
|
$100.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
44.000
|
$30.000
|
$60.000
|
$132.000
|
$50.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
|
EA
|
24.000
|
$190.000
|
$250.000
|
$144.000
|
$80.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
32,402.000
|
$0.850
|
$1.100
|
$1.080
|
$0.900
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
28,699.000
|
$0.900
|
$1.100
|
$1.080
|
$0.900
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
1,092.000
|
$0.800
|
$0.950
|
$5.000
|
$2.500
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
2,240.000
|
$1.000
|
$1.100
|
$1.400
|
$0.850
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
11,085.000
|
$0.400
|
$0.650
|
$0.800
|
$0.500
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
1,540.000
|
$0.450
|
$1.300
|
$1.200
|
$1.000
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
12,000.000
|
$0.390
|
$0.650
|
$0.800
|
$0.500
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
84.000
|
$15.000
|
$19.000
|
$26.000
|
$15.000
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
6.000
|
$198.000
|
$250.000
|
$280.000
|
$200.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
6.000
|
$249.000
|
$320.000
|
$320.000
|
$250.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
160.000
|
$3.950
|
$5.100
|
$8.000
|
$4.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
360.000
|
$5.000
|
$5.100
|
$8.000
|
$4.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
60,216.000
|
$0.550
|
$0.300
|
$0.500
|
$0.250
|
|
|
STRIP MOWING
|
CYC
|
1.000
|
$3,000.000
|
$1,800.000
|
$4,000.000
|
$7,500.000
|
|
|
LITTER REMOVAL
|
CYC
|
12.000
|
$1,750.000
|
$910.000
|
$1,100.000
|
$1,600.000
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
2,782.700
|
$78.000
|
$85.000
|
$134.000
|
$110.000
|
|
|
D-GR HMA TY-B PG64-22 (LEVEL-UP)
|
TON
|
19.200
|
$83.000
|
$200.000
|
$240.000
|
$250.000
|
|
|
SP MIXES SP-C SAC-A PG70-28
|
TON
|
2,948.000
|
$115.000
|
$115.000
|
$154.000
|
$130.000
|
|
|
TACK COAT
|
GAL
|
6,835.200
|
$0.210
|
$2.500
|
$3.000
|
$3.250
|
|
|
INTRLCK ART CONC BLKS (4" MIN)
|
SF
|
335.000
|
$12.000
|
$36.000
|
$95.000
|
$52.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$8,000.000
|
$13,000.000
|
$15,000.000
|
$22,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
200.000
|
$100.000
|
$75.000
|
$400.000
|
$325.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
1,600.000
|
$35.000
|
$25.000
|
$80.000
|
$48.000
|
|
|
CASING STEEL (30IN)
|
LF
|
90.000
|
$203.000
|
$350.000
|
$240.000
|
$300.000
|
|
Totals: |
$3,295,665.622
|
$3,685,479.680
|
$4,610,119.640
|
$4,718,599.540
|