Show Job Controls
Bid Cobra

HUTCHINSON SH 136 (0356-01-112)

Items: 91

County: HUTCHINSON
Length: 1.3180 MILES
Highway: SH 136
District: AMARILLO
Control Number: 0356-01-112
DBE Goal: 7.0%
Project: BR 2B24(553)
Guaranty: $100,000.00
Time: 293 WORKING DAYS
Engineer's Estimate: $14,044,457.30
Date: 09/05/2024 (1 year ago)
Contract Number: 9243028
Type: BRIDGE MAINTENANCE
Project ID: A00197724
Project Description: SUB AND SUP STRUCTURE REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$14,044,457.30
$14,937,903.07
Over/Under Est: 6.36% $893,445.77
Over/Under Est: 13.43% $1,885,922.70
Amt Left: 6.64% $992,476.93
$15,949,145.40
Over/Under Est: 13.56% $1,904,688.10
Amt Left: 6.77% $1,011,242.33
Delta: -0.12% -$18,765.40
Subcontractor Percentage Amount
MACIAS SPECIALTY CONTRACTING LLC 8.38% $1,255,996.09
ALAMO BROTHERS CONCRETE INC 7.69% $1,152,578.75
HJC FARMS, INC. 3.85% $577,038.78
S & S BRIDGE PAINTING, INC. 2.69% $403,177.74
L A FULLER & SONS CONSTRUCTION, LTD. 1.55% $232,314.31
TRP CONSTRUCTION GROUP, LLC 1.32% $197,841.87
DUSTROL, INC. 0.96% $143,884.99
SOUTHEAST GRINDING AND GROOVING LLC 0.89% $133,393.38
BARRICADES UNLIMITED 0.58% $86,930.52
J. H. ODEN CONTRACTING COMPANY 0.54% $80,935.31
Total: 28.45% $4,264,091.74

Bid Items & Bid Tabulations

91 Total 0 of 91
HUTCHINSON  |  SH 136  |  AMARILLO  |  0356-01-112  |  09/05/2024  |  $14,044,457.30  |  BR 2B24(553)  |  BRIDGE MAINT  |  293 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
GIBSON & ASSOCIATES, INC.
BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC
GILVIN-TERRILL, LTD.
PREPARING ROW
AC 10.670 $1,500.000 $5,700.000 $500.000 $10,000.000
REMOV CONC (RIPRAP)
SY 502.000 $50.000 $67.000 $10.000 $20.000
REMOV CONC (APPR SLAB)
SY 8.000 $40.000 $250.000 $20.000 $1,100.000
EXCAV (CHANNEL)
CY 170.000 $75.000 $160.000 $150.000 $100.000
EMBANK (FNL)(OC)(TY A)
CY 925.000 $75.000 $129.000 $20.000 $100.000
EMBANK (FNL)(OC)(TY B)
CY 12.000 $110.000 $200.000 $20.000 $100.000
DRILL SEED (PERM_RURAL_CLAY)
SY 6,950.000 $0.500 $5.500 $2.000 $5.000
SP MIXES SP-D PG70-28
TON 427.000 $475.000 $513.700 $550.000 $250.000
TACK COAT
GAL 388.000 $15.000 $31.350 $32.000 $10.000
PLANE ASPH CONC PAV(0" TO 2")
SY 2,726.000 $8.000 $7.980 $13.000 $10.000
PLANE ASPH CONC PAV(2" TO 4")
SY 5,891.000 $8.000 $5.060 $18.000 $15.000
PLANE ASPH CONC PAV(2")
SY 3,778.000 $8.000 $7.980 $16.000 $15.000
PLANE ASPH CONC PAV (0" TO 1.5")
SY 21,100.000 $8.000 $2.080 $9.000 $6.000
FULL - DEPTH REPAIR CRCP (9")
CY 28.000 $300.000 $1,400.000 $1,000.000 $2,000.000
CEM STABIL BKFL
CY 36.000 $300.000 $700.000 $350.000 $775.000
FLOWABLE BACKFILL
CY 31.000 $400.000 $700.000 $400.000 $775.000
CL C CONC (RAIL FOUNDATION)
CY 115.000 $800.000 $676.500 $750.000 $625.000
APPROACH SLAB
CY 238.000 $900.000 $1,400.000 $525.000 $1,000.000
EPOXY WATERPROOF FINISH (TY X)
SF 58,563.000 $9.000 $7.570 $10.000 $10.000
CONC STR REPAIR(DECK REP(PART DEPTH))
SF 8,305.000 $150.000 $20.000 $275.000 $150.000
CONC STR REPAIR(DECK REP (FULL DEPTH))
SF 2,595.000 $235.000 $50.000 $300.000 $150.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 3,894.000 $220.000 $242.000 $225.000 $150.000
RIPRAP (CONC)(4 IN)
CY 349.000 $825.000 $620.330 $500.000 $600.000
RIPRAP (CONC)(5 IN)
CY 74.000 $800.000 $878.630 $550.000 $1,000.000
RIPRAP (MOW STRIP)(4 IN)
CY 21.000 $825.000 $1,100.000 $625.000 $600.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 182.000 $400.000 $500.000 $225.000 $500.000
CLEANING AND SEALING EXISTING JOINTS
LF 324.000 $90.000 $121.000 $55.000 $50.000
CLEANING AND SEALING JOINTS (FOAM)
LF 1,426.000 $80.000 $115.500 $90.000 $225.350
POLYESTER POLYMER CONC OVERLAY (2")
SY 9,543.000 $175.000 $282.000 $216.000 $250.000
POLYESTER POLYMER CONC OVERLAY (1")
SY 20,315.000 $130.000 $125.000 $122.000 $150.000
RAIL (TY SSTR)
LF 812.000 $120.000 $101.970 $135.000 $100.000
RETROFIT RAIL (TY SSTR)
LF 4,550.000 $235.000 $152.000 $320.000 $140.000
MICROMILLING CONCRETE SLAB (2 IN)
SY 1,052.000 $50.000 $31.780 $22.000 $35.000
REMOV STR (APPROACH SLAB)
EA 4.000 $5,100.000 $27,000.000 $2,500.000 $4,500.000
REMOV STR (SMALL)
EA 2.000 $500.000 $3,800.000 $2,000.000 $3,000.000
MOBILIZATION
LS 1.000 $1,200,000.000 $1,540,000.000 $1,000,000.000 $1,551,975.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 17.000 $22,500.000 $38,000.000 $5,000.000 $75,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $13,000.000 $40,000.000 $10,000.000 $18,500.000
TMA (STATIONARY)
DAY 210.000 $250.000 $360.000 $300.000 $575.000
TMA (MOBILE OPERATION)
HR 240.000 $100.000 $100.000 $300.000 $95.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 3,895.000 $6.500 $11.000 $8.000 $10.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 3,895.000 $2.300 $2.200 $3.000 $2.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 1,600.000 $125.000 $44.000 $100.000 $100.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 40.000 $125.000 $44.000 $105.000 $110.000
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
LF 2,250.000 $25.000 $27.500 $35.000 $7.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 2,250.000 $12.000 $16.500 $35.000 $7.000
PORT CTB (STKPL)(F-SHAPE)(TY 1)
LF 2,250.000 $25.000 $22.000 $35.000 $7.000
PORT CTB (STKPL)(LOW PROF)(TY 1)
LF 1,600.000 $15.000 $22.000 $35.000 $10.000
PORT CTB (STKPL)(LOW PROF)(TY 2)
LF 40.000 $20.000 $22.000 $35.000 $10.000
PERM CTB (SGL SLOPE) (TY 1) (42 )
LF 1,260.000 $100.000 $127.270 $245.000 $120.000
PERM CTB (SGL SLOPE) (TY 3) (42 )
LF 20.000 $250.000 $242.110 $505.000 $225.000
MTL W-BEAM GD FEN (STEEL POST)
LF 900.000 $35.000 $36.300 $35.000 $35.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 7.000 $2,850.000 $3,135.000 $2,700.000 $3,000.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 3.000 $1,800.000 $1,595.000 $2,000.000 $1,500.000
MTL BM GD FEN TRANS (NON - SYM)
EA 3.000 $1,069.000 $1,353.000 $1,200.000 $1,250.000
MTL BM GD FEN TRANS (ANCHOR PLATE)
EA 3.000 $800.000 $715.000 $1,300.000 $650.000
REMOVE METAL BEAM GUARD FENCE
LF 3,325.000 $5.500 $2.750 $3.000 $2.500
REMOVE TERMINAL ANCHOR SECTION
EA 7.000 $350.000 $330.000 $1,000.000 $300.000
CABLE BARRIER SYSTEM (INSTALL)(TL-4)
LF 680.000 $19.000 $38.500 $36.000 $35.000
CABLE BARRIER TERM SEC (INSTL)(TL-4)
EA 1.000 $5,000.000 $6,050.000 $4,000.000 $5,500.000
CABLE BARRIER TERMINAL SECTION (REMOVE)
EA 1.000 $1,000.000 $2,750.000 $1,250.000 $2,500.000
GUARDRAIL END TREATMENT (INSTALL)
EA 7.000 $3,550.000 $3,608.000 $4,000.000 $3,280.000
GUARDRAIL END TREATMENT (REMOVE)
EA 8.000 $450.000 $275.000 $1,000.000 $250.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 1.000 $3,000.000 $2,750.000 $3,000.000 $3,000.000
CRASH CUSH ATTEN (REMOVE)
EA 1.000 $1,500.000 $1,650.000 $1,300.000 $3,000.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 4.000 $30,000.000 $45,100.000 $36,000.000 $30,000.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 1.000 $10,000.000 $8,635.000 $12,000.000 $10,000.000
REPLACE EXISTING ALUMINUM SIGNS(TY O)
SF 28.000 $45.000 $74.250 $50.000 $100.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB
EA 25.000 $50.000 $44.000 $60.000 $40.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 16.000 $55.000 $55.000 $60.000 $50.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB
EA 28.000 $50.000 $66.000 $60.000 $60.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 3.000 $55.000 $55.000 $60.000 $50.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 3,145.000 $0.420 $2.200 $2.500 $2.000
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 3,145.000 $0.420 $2.200 $2.500 $2.000
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 23,620.000 $1.200 $2.200 $2.500 $2.000
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 17,375.000 $1.200 $2.200 $2.500 $2.000
TY I HIGH PERF PM (W)6"(BRK)(090MIL)
LF 3,090.000 $1.000 $2.590 $3.000 $2.350
TY I HIGH PERF PM (W)6"(SLD)(090MIL)
LF 11,891.000 $1.000 $2.590 $3.000 $2.350
TY I HIGH PERF PM (Y)6"(SLD)(090MIL)
LF 11,215.000 $1.000 $2.590 $3.000 $2.350
PAVEMENT SLER 6"
LF 21,788.000 $0.500 $0.830 $1.000 $0.750
REFL PAV MRKR TY I-C
EA 38.000 $15.000 $11.000 $13.000 $10.000
REFL PAV MRKR TY II-C-R
EA 130.000 $15.000 $8.800 $11.000 $8.000
ELIM EXT PM & MRKS (4")
LF 4,905.000 $1.000 $2.200 $2.500 $2.000
PAV SURF PREP FOR MRK (6")
LF 21,788.000 $0.500 $0.720 $1.000 $0.650
CRACK CLEANING AND SEALING (JCP)
LF 5,198.000 $25.000 $19.800 $10.000 $25.000
CONCRETE RAIL REPLACEMENT (IN-KIND)
LF 72.000 $600.000 $1,250.000 $500.000 $2,500.000
BRIDGE JOINT REPAIR (CONCRETE)
LF 212.000 $250.000 $554.000 $750.000 $300.000
BRIDGE JOINT REPLACEMENT (CONCRETE)
LF 585.000 $400.000 $1,050.000 $600.000 $500.000
BRIDGE JOINT REPLACEMENT (SEJ)
LF 990.000 $600.000 $990.000 $600.000 $500.000
CARBON FIBER REINF POLYMER PROTECTION
SF 202.000 $120.000 $121.000 $100.000 $150.000
REPLACING ELASTOMERIC BEARING PADS
EA 5.000 $11,000.000 $8,000.000 $7,500.000 $2,000.000
Totals: $14,044,457.300 $14,937,903.070 $15,930,380.000 $15,949,145.400