HUTCHINSON SH 136 (0356-01-107)

Items: 74

County: HUTCHINSON
Length: N/A
Highway: SH 136
District: AMARILLO
Control Number: 0356-01-107
DBE Goal: N/A
Project: F 2023(456)
Guaranty: N/A
Time: 100 WORKING DAYS
Engineer's Estimate: $9,968,433.80
Date: 02/02/2023 (3 years ago)
Contract Number: N/A
Type: HIGHWAY IMPROVEMENT
Mail/Deliver Bids To: N/A
BERNARDO FERREL
OFELIA GARBALENA
KENNETH PETR
THOMAS NAGEL
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$9,968,433.80
1
$9,658,644.05
Over/Under Est: -3.11% -$309,789.75
$9,722,724.59
Over/Under Est: -2.46% -$245,709.21
Amt Left: 0.66% $64,080.54
$9,849,820.26
Over/Under Est: -1.19% -$118,613.54
Amt Left: 1.98% $191,176.21
Delta: -1.31% -$127,095.67
$11,754,476.08
Over/Under Est: 17.92% $1,786,042.28
Amt Left: 21.7% $2,095,832.03
Delta: -19.34% -$1,904,655.82
Subcontractor Percentage Amount
W. S. CONSTRUCTION COMPANY 6.23% $634,554.86
DUSTIN ALLEN, INC. 5.86% $596,868.61
TRP CONSTRUCTION GROUP, LLC 1.41% $143,615.14
WITHERS CONSTRUCTION, LLC 0.89% $90,650.69
TEXOP CONSTRUCTION 0.65% $66,205.56
DK CONTRACTING, LLC 0.43% $43,797.53
WOLFE CONSTRUCTION GROUP, INCORPORATED 0.34% $34,630.60
SURFACE PREPARATION TECHNOLOGIES, LLC 0.20% $20,370.94
SURFACE PREPARATION TECHNOLOGIES, LLC 0.19% $19,352.40
BARRICADES UNLIMITED 0.19% $19,352.40
Total: 16.39% $1,669,398.73

Bid Items & Bid Tabulations

74 Total 0 of 74
HUTCHINSON  |  SH 136  |  AMARILLO  |  0356-01-107  |  02/02/2023  |  $9,968,433.80  |  F 2023(456)  |  HWY IMPRV  |  100 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RK HALL, LLC
DUININCK, INC.
J. LEE MILLIGAN, INC.
GILVIN-TERRILL, LTD.
PREPARING ROW
AC 11.000 $200.000 $269.660 $215.000 $400.000 $1,500.000
PREP ROW (TREE)(LESS THAN 24" DIA)
EA 90.000 $550.000 $594.000 $565.000 $795.000 $750.000
PREP ROW (TREE)(GREATER THAN 24" DIA)
EA 48.000 $1,000.000 $918.000 $875.000 $1,955.000 $850.000
REMOVING CONC (CURB AND GUTTER)
LF 30.000 $20.000 $50.660 $20.500 $18.250 $50.000
EXCAVATION (ROADWAY)
CY 1,491.000 $16.000 $49.050 $20.000 $31.750 $40.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 1,043.000 $16.000 $53.430 $53.500 $45.250 $40.000
BACKFILL (TY A)
STA 493.000 $275.000 $228.240 $175.000 $215.000 $200.000
BLADING
HR 9.000 $170.000 $218.100 $420.000 $425.000 $750.000
DRILL SEEDING (PERM) (RURAL) (SANDY)
AC 18.000 $570.000 $604.800 $575.000 $590.000 $560.000
DRILL SEEDING (TEMP)(WARM OR COOL)
AC 18.000 $460.000 $459.000 $435.000 $450.000 $425.000
EMULS ASPH (EROSN CONT)(MULTI)
GAL 8,905.000 $5.000 $3.970 $4.700 $4.350 $2.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(2")
SY 24,861.000 $33.000 $18.900 $24.500 $26.000 $35.000
PLANE ASPH CONC PAV(0" TO 2")
SY 8,399.000 $5.000 $5.520 $12.500 $3.700 $5.000
CL A CONC (COLLAR)
EA 55.000 $250.000 $2,160.000 $2,100.000 $2,100.000 $2,000.000
RIPRAP (CONC)(4 IN)
CY 10.000 $1,200.000 $918.000 $875.000 $900.000 $850.000
CMP (GAL STL 24 IN)
LF 64.000 $100.000 $129.600 $125.000 $130.000 $120.000
CMP (GAL STL 30 IN)
LF 18.000 $117.500 $151.200 $145.000 $150.000 $140.000
CONC BOX CULV (5FT X 2.5FT)
LF 24.000 $900.000 $1,080.000 $1,000.000 $1,055.000 $1,000.000
RC PIPE (CL III)(24 IN)
LF 58.000 $125.000 $194.400 $185.000 $190.000 $180.000
RC PIPE (CL III)(30 IN)
LF 8.000 $180.000 $324.000 $310.000 $320.000 $300.000
RC PIPE (CL III)(36 IN)
LF 8.000 $250.000 $432.000 $410.000 $425.000 $400.000
SET (TY I) (24 IN) (4: 1) (C)
EA 2.000 $6,000.000 $11,340.000 $11,000.000 $11,000.000 $10,500.000
SET (TY I) (30 IN) (3: 1) (C)
EA 1.000 $6,000.000 $12,420.000 $12,000.000 $12,150.000 $11,500.000
SET (TY I) (30 IN) (4: 1) (C)
EA 1.000 $3,000.000 $14,580.000 $14,000.000 $14,250.000 $13,500.000
SET (TY I) (30 IN) (6: 1) (C)
EA 4.000 $4,000.000 $15,660.000 $15,000.000 $15,300.000 $14,500.000
SET (TY I) (36 IN) (4: 1) (C)
EA 1.000 $5,000.000 $17,820.000 $17,000.000 $17,500.000 $16,500.000
SET (TY I)(S= 4 FT)(HW= 3 FT)(6:1) (C)
EA 1.000 $9,000.000 $18,360.000 $17,500.000 $18,000.000 $17,000.000
SET (TY I)(S= 5 FT)(HW= 4 FT)(6:1) (C)
EA 2.000 $9,000.000 $25,542.000 $24,500.000 $25,000.000 $23,650.000
SET (TY II) (18 IN) (CMP) (6: 1) (P)
EA 2.000 $1,080.000 $2,376.000 $2,300.000 $1,220.000 $2,200.000
SET (TY II) (24 IN) (CMP) (6: 1) (P)
EA 40.000 $1,380.000 $2,808.000 $2,700.000 $2,750.000 $2,600.000
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 2.000 $1,500.000 $2,808.000 $2,700.000 $2,750.000 $2,600.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 3.000 $1,800.000 $3,024.000 $2,900.000 $3,000.000 $2,800.000
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 11.000 $2,000.000 $3,240.000 $3,100.000 $3,165.000 $3,000.000
SET (TY II) (30 IN) (CMP) (6: 1) (P)
EA 6.000 $2,500.000 $4,320.000 $4,100.000 $42,200.000 $4,000.000
SET (TY II) (30 IN) (RCP) (6: 1) (C)
EA 1.000 $3,000.000 $4,590.000 $4,400.000 $4,500.000 $4,250.000
REMOV STR (HEADWALL)
EA 27.000 $1,500.000 $1,080.000 $1,000.000 $1,055.000 $1,000.000
REMOV STR (PIPE)
LF 205.000 $27.000 $16.200 $15.500 $16.000 $15.000
MOBILIZATION
LS 1.000 $850,000.000 $386,345.760 $540,000.000 $985,000.000 $1,165,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $25,000.000 $22,996.590 $23,500.000 $35,000.000 $40,000.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 600.000 $15.000 $2.110 $2.000 $8.000 $3.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 600.000 $5.000 $1.620 $1.550 $3.500 $2.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 3,750.000 $5.000 $3.520 $3.350 $7.500 $4.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 3,750.000 $2.000 $0.860 $0.820 $2.000 $2.000
CONC CURB & GUTTER (TY I)
LF 30.000 $80.000 $86.400 $82.000 $85.000 $80.000
RUMBLE STRIPS (CENTERLINE)
LF 17,632.000 $0.250 $0.130 $0.230 $0.500 $0.220
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 67,297.000 $0.200 $0.130 $0.180 $0.400 $0.180
MTL W-BEAM GD FEN (STEEL POST)
LF 14,325.000 $34.000 $29.920 $28.500 $33.250 $27.700
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 8.000 $2,750.000 $2,922.580 $2,600.000 $2,875.000 $2,268.000
MTL BEAM GD FEN TRANS (T101)
EA 4.000 $1,500.000 $1,792.800 $1,700.000 $1,950.000 $1,660.000
CONNECTOR PLATE FOR THRIE BEAM
EA 4.000 $1,500.000 $798.120 $760.000 $685.000 $739.000
REMOVE METAL BEAM GUARD FENCE
LF 6,616.000 $3.000 $2.160 $2.050 $2.100 $2.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 6.000 $250.000 $324.000 $310.000 $210.000 $300.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 4.000 $250.000 $378.000 $360.000 $210.000 $350.000
GUARDRAIL END TREATMENT (INSTALL)
EA 50.000 $3,100.000 $3,119.040 $4,000.000 $3,450.000 $2,888.000
GUARDRAIL END TREATMENT (REMOVE)
EA 10.000 $290.000 $324.000 $310.000 $210.000 $300.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 600.000 $18.000 $16.200 $41.000 $16.000 $5.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 272.000 $35.000 $34.560 $33.000 $27.000 $32.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND(BI)
EA 228.000 $120.000 $129.600 $125.000 $160.000 $120.000
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
EA 100.000 $120.000 $131.760 $125.000 $160.000 $122.000
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 600.000 $1.000 $3.240 $3.100 $3.150 $3.000
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
LF 520.000 $10.000 $10.800 $10.500 $10.500 $10.000
REFL PAV MRK TY I (W)(ARROW)(090MIL)
EA 18.000 $200.000 $178.200 $170.000 $174.000 $165.000
REF PAV MRK TY I(W)18"(YLD TRI)(090MIL)
EA 62.000 $24.000 $75.600 $72.000 $74.000 $70.000
REFL PAV MRK TY I (Y)12"(SLD)(090MIL)
LF 220.000 $5.000 $5.130 $4.900 $5.000 $4.750
SP MIXES SP-D SAC-A PG70-28
TON 44,829.000 $135.000 $133.490 $135.000 $117.100 $155.000
TACK COAT
GAL 565.000 $8.000 $8.780 $6.150 $6.000 $15.000
UNDERSEAL COURSE
GAL 101,608.000 $3.500 $6.470 $3.700 $4.000 $6.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $13,000.000 $9,171.660 $10,500.000 $9,200.000 $20,000.000
HPPM W/RET REQ TY I(W)4"(BRK)(090MIL)
LF 26,188.000 $0.650 $0.490 $0.460 $0.470 $0.450
HPPM W/RET REQ TY I(W)4"(SLD)(090MIL)
LF 98,672.000 $0.600 $0.490 $0.460 $0.470 $0.450
HPPM W/RET REQ TY I(Y)4"(BRK)(090MIL)
LF 9,672.000 $0.650 $0.490 $0.460 $0.470 $0.450
HPPM W/RET REQ TY I(Y)4"(SLD)(090MIL)
LF 154,472.000 $0.600 $0.480 $0.450 $0.460 $0.440
TMA (STATIONARY)
DAY 100.000 $200.000 $374.090 $255.000 $300.000 $550.000
TMA (MOBILE OPERATION)
HR 136.000 $95.000 $99.950 $105.000 $90.000 $95.000
Totals: $9,968,433.800 $9,658,644.050 $9,722,724.590 $9,849,820.260 $11,754,476.080