Show Job Controls
Bid Cobra

HUNT IH0030 (6469-75-001)

Items: 47

County: HUNT
Length: N/A
Highway: IH0030
District: PARIS
Control Number: 6469-75-001
DBE Goal: 0.0%
Project: RMC - 646975001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $935,500.00
Date: 08/15/2024 (1 year ago)
Contract Number: N/A
Type: METAL BEAM GUARD FENCE REPAIR
Mail/Deliver Bids To: N/A
JAMES ATKINS
JESSE HERRERA
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$935,500.00
1
$607,777.00
Over/Under Est: -35.03% -$327,723.00
Over/Under Est: -28.03% -$262,224.00
Amt Left: 10.78% $65,499.00
$1,336,800.00
Over/Under Est: 42.9% $401,300.00
Amt Left: 119.95% $729,023.00
Delta: -98.55% -$663,524.00

Bid Items & Bid Tabulations

47 Total 0 of 47
HUNT  |  IH0030  |  PARIS  |  6469-75-001  |  08/15/2024  |  $935,500.00  |  RMC - 646975001  |  METAL BEAM GUARD FENCE REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
CATOCON, INC.
ROSS SA ENTERPRISE LLC
AAD CONTRACTING INC.
RIPRAP (MOW STRIP)(4 IN)
CY 50.000 $700.000 $100.000 $100.000 $300.000
MOBILIZATION (CALLOUT)
EA 85.000 $300.000 $1.000 $1.000 $2,500.000
MTL W-BEAM GD FEN (STEEL POST)
LF 5,000.000 $30.000 $12.500 $22.000 $33.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 10.000 $1,500.000 $100.000 $300.000 $1,900.000
MTL BEAM GD FEN TRANS (TL2)
EA 3.000 $1,000.000 $10.000 $100.000 $1,000.000
MTL BEAM GD FEN TRANS (T101)
EA 3.000 $1,100.000 $1.000 $1.000 $1,500.000
MTL W-BEAM GD FEN ADJUSTMENT
LF 750.000 $6.000 $1.000 $3.000 $25.000
REMOVE METAL BEAM GUARD FENCE
LF 5,000.000 $1.000 $0.100 $0.100 $1.000
REMOVE TERMINAL ANCHOR SECTION
EA 15.000 $150.000 $1.000 $1.000 $200.000
GUARDRAIL END TREATMENT (INSTALL)
EA 50.000 $1,750.000 $700.000 $500.000 $3,000.000
GUARDRAIL END TREATMENT (MOVE & RESET)
EA 5.000 $400.000 $1.000 $1.000 $100.000
GUARDRAIL END TREATMENT (REMOVE)
EA 15.000 $450.000 $800.000 $1.000 $250.000
CRASH CUSH ATTEN (DES SOURCE)
EA 2.000 $2,000.000 $1.000 $100.000 $800.000
CRASH CUSHION ATTEN (INSTALL) (TRACC)
EA 2.000 $10,000.000 $100.000 $500.000 $30,000.000
INSTL DEL ASSM (D-SW)SZ 2(WC)GND
EA 100.000 $5.000 $1.000 $1.000 $90.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
EA 50.000 $50.000 $1.000 $1.000 $20.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 3,000.000 $50.000 $62.550 $80.000 $20.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 1,000.000 $50.000 $2.000 $1.000 $35.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 100.000 $32.000 $1.000 $1.000 $45.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 200.000 $27.000 $30.000 $40.000 $26.000
RAISE RAIL ELEMENT
LF 3,000.000 $3.000 $0.500 $0.100 $25.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 75.000 $30.000 $100.000 $50.000 $30.000
REM / REPL TIMBER POST W / O CONC FND
EA 250.000 $25.000 $40.000 $1.000 $30.000
REM / REPL STEEL POST W / O CONC FND
EA 250.000 $45.000 $1.000 $20.000 $70.000
REM / REPL STEEL POST W / CONC FND
EA 50.000 $65.000 $1.000 $425.000 $65.000
REPAIR STEEL POST WITH BASE PLATE
EA 10.000 $200.000 $99.000 $200.000 $300.000
REALIGN POSTS
EA 300.000 $30.000 $60.000 $5.000 $25.000
REMOVE & REPLACE BLOCKOUT
EA 200.000 $30.000 $100.000 $615.000 $25.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 3,500.000 $25.000 $35.000 $1.000 $26.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 500.000 $60.000 $23.000 $20.000 $33.000
REPLACE TERMINAL ANCHOR POSTS
EA 20.000 $50.000 $1.000 $1.000 $400.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 60.000 $900.000 $1,000.000 $1,200.000 $1,250.000
REM & RESET SGT IMPACT HEAD
EA 10.000 $30.000 $200.000 $300.000 $750.000
REPLACE SGT CABLE ANCHOR
EA 40.000 $80.000 $75.000 $200.000 $150.000
REPLACE SGT STRUT
EA 15.000 $90.000 $300.000 $600.000 $150.000
REMOVE AND REPLACE (TRACC)
EA 2.000 $13,000.000 $3,250.000 $1,500.000 $30,000.000
REMOVE AND REPLACE (WIDE TRACC)
EA 1.000 $25,000.000 $500.000 $500.000 $52,000.000
REMOVE AND REPLACE (WIDE REACT 350)
EA 1.000 $30,000.000 $500.000 $1.000 $50,000.000
REPAIR (TRACC)
EA 3.000 $3,500.000 $5,000.000 $500.000 $3,000.000
REPAIR (CATCB - FRNT SECT)
EA 2.000 $2,500.000 $300.000 $1.000 $3,000.000
REPAIR (CATCB - REAR SECT)
EA 2.000 $1,250.000 $100.000 $1.000 $3,000.000
REPAIR (CATGR - FRONT SECTION)
EA 2.000 $1,750.000 $300.000 $1.000 $3,000.000
REPAIR (CATGR - END SECTION)
EA 1.000 $2,000.000 $1.000 $1.000 $3,000.000
REMOVE AND REPLACE (CATGR)
EA 1.000 $6,000.000 $1.000 $3,000.000 $3,000.000
REPAIR (REACT 350) (W)
EA 2.000 $3,500.000 $2,500.000 $1,500.000 $4,000.000
REPAIR (NARROW REACT 350)
EA 2.000 $2,500.000 $2,000.000 $1,500.000 $2,000.000
TMA (STATIONARY)
DAY 75.000 $150.000 $1.000 $1.000 $350.000
Totals: $935,500.000 $607,777.000 $673,276.000 $1,336,800.000