Show Job Controls
Bid Cobra

HUNT SH 11 (2139-04-023)

Items: 126

County: HUNT
Length: N/A
Highway: SH 11
District: PARIS
Control Number: 2139-04-023
DBE Goal: N/A
Project: F 2024(044)
Guaranty: N/A
Time: 288 WORKING DAYS
Engineer's Estimate: $10,881,646.59
Date: 09/06/2023 (2 years ago)
Contract Number: N/A
Type: ADDING SHOULDERS WITH NO ADDED CAPACITY
Mail/Deliver Bids To: N/A
JAMES ATKINS
WILLIE BOLDEN
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$10,881,646.59
Over/Under Est: 4.82% $524,256.71
$12,655,434.03
Over/Under Est: 16.3% $1,773,787.44
Amt Left: 10.96% $1,249,530.73
$13,074,121.06
Over/Under Est: 20.15% $2,192,474.47
Amt Left: 14.63% $1,668,217.76
Delta: -3.31% -$418,687.03
Subcontractor Percentage Amount
RK HALL, LLC 50.77% $5,990,245.09
MOJICA CONSTRUCTION LLC 9.31% $1,098,467.24
TRAFFIC HIGHWAY MAINTENANCE, LLC 2.42% $285,530.69
SOUTHERN CROSS CONTRACTORS, LLC 2.15% $253,673.96
J. H. ODEN CONTRACTING COMPANY 2.08% $245,414.81
PANOLA SIGN & BARRICADE, INC. 0.44% $51,914.67
CATOCON, INC. 0.30% $35,396.37
TEXOP CONSTRUCTION 0.26% $30,676.85
WEST TEXAS ROCK RESOURCES, LLC 0.08% $9,439.03
TEXAS HIGHWAY MAINTENANCE, LLC 0.00% $0.00
INDUSTRIAL FABRICS, INC. 0.00% $0.00
Total: 67.81% $8,000,758.71

Bid Items & Bid Tabulations

126 Total 0 of 126
HUNT  |  SH 11  |  PARIS  |  2139-04-023  |  09/06/2023  |  $10,881,646.59  |  F 2024(044)  |  ADDING SHOULDERS WITH NO ADDED CAPAC...  |  288 WORKING DAYS
Alt
Item Code
Description
Unit
Quantity
Engineer's Estimate
D. L. LENNON INCORPORATED - CONTRACTOR
FNH CONSTRUCTION, LLC
RK HALL, LLC
PREPARING ROW
STA 244.670 $1,500.000 $293.050 $3,250.000 $164.510
REMOVING CONC (DRIVEWAYS)
SY 494.000 $15.000 $15.250 $20.000 $17.250
EXCAVATION (CHANNEL)
CY 428.000 $25.000 $45.000 $50.000 $56.580
EXCAVATION (SPECIAL)
CY 242.000 $25.000 $63.000 $50.000 $78.980
EXCAVATION (ROADWAY AND CHANNEL)
CY 44,693.000 $25.000 $38.000 $20.000 $40.000
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 15,523.000 $30.000 $38.000 $25.000 $30.900
BACKFILL (TY B)
STA 235.800 $194.000 $330.000 $200.000 $147.560
ROAD GRADER WORK (ORD COMP)
STA 234.300 $177.060 $330.000 $200.000 $334.720
BROADCAST SEED (TEMP) (WARM)
SY 115,590.000 $0.090 $0.100 $0.500 $0.120
BROADCAST SEED (TEMP) (COOL)
SY 115,590.000 $0.090 $0.100 $0.500 $0.120
STRAW/HAY MLCH SEED(PERM)(RURAL)(CLAY)
SY 231,180.000 $0.240 $0.300 $0.250 $0.350
VEGETATIVE WATERING
MG 1,387.000 $9.000 $0.010 $20.000 $42.160
PROOF ROLLING
HR 22.400 $83.000 $150.000 $150.000 $261.600
FL BS (RDWY DEL) (TY A GR 4)
TON 60.000 $40.000 $150.000 $100.000 $103.770
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 500.000 $90.000 $112.500 $95.000 $98.230
PLANE ASPH CONC PAV(0" TO 3")
SY 3,529.000 $8.000 $5.650 $10.000 $11.500
PLANE ASPH CONC PAV (2")
SY 5,804.000 $5.000 $4.200 $10.000 $8.630
FLOWABLE BACKFILL
CY 166.600 $208.000 $295.000 $350.000 $287.500
TEMPORARY SPL SHORING
SF 2,575.000 $40.000 $55.000 $55.000 $63.250
CONC STR REPR(REMOV AND REPL WINGWALL)
CY 0.720 $1,000.000 $5,000.000 $6,500.000 $2,875.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 548.000 $250.000 $246.000 $165.000 $276.000
RIPRAP (MOW STRIP)(4 IN)
CY 88.900 $550.000 $550.000 $550.000 $718.750
CLEANING AND SEALING JOINTS (CL 3)
LF 283.000 $30.000 $65.000 $100.000 $78.200
RETROFIT RAIL (TY T131RC)
LF 740.000 $200.000 $246.000 $185.000 $270.400
CONC BOX CULV (4 FT X 3 FT)(EXTEND)
LF 2.000 $1,000.000 $680.000 $2,500.000 $1,725.000
CONC BOX CULV (6 FT X 4 FT)(EXTEND)
LF 1.000 $1,050.000 $1,250.000 $3,000.000 $2,300.000
CONC BOX CULV (7 FT X 7 FT)(EXTEND)
LF 4.000 $1,100.000 $1,300.000 $10,000.000 $2,875.000
RC PIPE (CL III)(12 IN)
LF 122.000 $60.000 $51.000 $85.000 $63.250
RC PIPE (CL III)(60 IN)
LF 80.000 $300.000 $352.000 $800.000 $546.250
HEADWALL (CH - PW - 0) (DIA= 30 IN)
EA 3.000 $9,500.000 $7,800.000 $3,500.000 $9,775.000
HEADWALL (CH - PW - S) (DIA= 24 IN)
EA 2.000 $3,400.000 $7,250.000 $3,000.000 $8,050.000
WINGWALL (PW - 2) (HW=5 FT)
EA 1.000 $14,000.000 $17,000.000 $12,500.000 $20,700.000
WINGWALL (PW - 2) (HW=6 FT)
EA 1.000 $17,000.000 $20,000.000 $16,500.000 $28,750.000
WINGWALL (PW - 2) (HW=7 FT)
EA 4.000 $25,000.000 $35,000.000 $25,000.000 $40,250.000
WINGWALL (PW - 2) (HW=8 FT)
EA 2.000 $30,000.000 $39,900.000 $35,000.000 $46,000.000
SET (TY I) (30 IN) (3: 1) (C)
EA 1.000 $6,500.000 $13,000.000 $4,000.000 $9,200.000
SET (TY II) (12 IN) (RCP) (6: 1) (P)
EA 8.000 $700.000 $553.000 $1,650.000 $718.750
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 20.000 $762.000 $810.000 $1,850.000 $1,035.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 6.000 $1,300.000 $1,515.000 $2,250.000 $1,725.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 6.000 $3,520.000 $2,630.000 $3,500.000 $3,220.000
SET (TY II) (36 IN) (RCP) (6: 1) (P)
EA 4.000 $4,000.000 $7,520.000 $4,500.000 $8,625.000
SET (TY II) (48 IN) (RCP) (6: 1) (P)
EA 2.000 $5,000.000 $11,250.000 $8,500.000 $16,100.000
SET (TY II) (60 IN) (RCP) (6: 1) (P)
EA 2.000 $6,000.000 $15,500.000 $20,000.000 $23,000.000
CLEAN EXIST CULVERTS
EA 7.000 $2,000.000 $1,050.000 $1,500.000 $1,380.000
REMOV STR (WINGWALL)
EA 8.000 $1,500.000 $1,000.000 $5,000.000 $1,150.000
REMOV STR (PIPE)
LF 865.000 $28.000 $8.000 $50.000 $17.250
REMOV STR (BOX CULVERT)
LF 65.000 $130.000 $75.000 $100.000 $172.500
MOBILIZATION
LS 1.000 $989,240.600 $466,500.000 $1,200,000.000 $1,219,792.420
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 18.000 $6,000.000 $6,259.000 $8,500.000 $20,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 2,200.000 $36.250 $40.000 $30.000 $46.000
ROCK FILTER DAMS (REMOVE)
LF 2,200.000 $8.740 $9.500 $15.000 $10.930
CONSTRUCTION EXITS (INSTALL) (TY 2)
SY 444.000 $5.700 $25.000 $40.000 $28.750
CONSTRUCTION EXITS (REMOVE)
SY 444.000 $2.370 $10.000 $20.000 $11.500
TEMP SEDMT CONT FENCE (INSTALL)
LF 7,576.000 $2.800 $3.300 $4.000 $3.800
TEMP SEDMT CONT FENCE (REMOVE)
LF 7,576.000 $1.000 $0.500 $2.000 $0.580
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 4.000 $4,000.000 $5,000.000 $8,500.000 $8,523.420
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
LF 840.000 $10.000 $12.000 $30.000 $21.310
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 2,280.000 $12.000 $5.000 $20.000 $11.460
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 840.000 $10.000 $12.000 $20.000 $21.310
INTERSECTIONS (ACP)
SY 1,078.700 $65.000 $76.000 $45.000 $119.520
DRIVEWAYS (CONC)
SY 438.800 $125.000 $121.000 $85.000 $109.250
DRIVEWAYS (ACP)
SY 1,546.000 $60.000 $76.000 $45.000 $141.700
RUMBLE STRIPS (SHOULDER)
LF 52,094.000 $0.540 $0.620 $0.500 $0.120
RUMBLE STRIPS (CENTERLINE)
LF 27,416.000 $0.650 $0.620 $0.500 $0.120
MTL W-BEAM GD FEN (STEEL POST)
LF 850.000 $29.500 $23.750 $50.000 $27.040
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 8.000 $2,350.000 $2,219.000 $1,850.000 $2,907.680
REMOVE METAL BEAM GUARD FENCE
LF 400.000 $25.000 $4.000 $3.000 $3.450
RM MTL BM GD FEN TRANS (T101)
EA 8.000 $50.000 $175.000 $500.000 $230.000
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $3,060.000 $2,575.000 $3,250.000 $3,075.100
GUARDRAIL END TREATMENT (REMOVE)
EA 8.000 $288.000 $195.000 $1,500.000 $230.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 6.000 $3,000.000 $1,200.000 $5,000.000 $2,300.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $1,500.000 $650.000 $2,500.000 $920.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $11,000.000 $7,775.000 $30,000.000 $10,603.000
MAILBOX INSTALL-S (TWG-POST) TY 2
EA 9.000 $347.000 $220.000 $850.000 $293.250
MAILBOX INSTALL-D (TWG-POST) TY 2
EA 1.000 $400.000 $280.000 $850.000 $304.750
MAILBOX INSTALL-M (TWG-POST) TY 2
EA 1.000 $520.000 $750.000 $850.000 $690.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 47.000 $800.000 $760.000 $1,150.000 $799.250
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 1.000 $801.000 $890.000 $1,150.000 $937.250
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 1.000 $802.000 $1,050.000 $1,150.000 $1,138.500
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 2.000 $1,000.000 $1,510.000 $1,150.000 $1,552.500
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
EA 2.000 $1,100.000 $2,100.000 $1,150.000 $1,782.500
REMOVE SM RD SN SUP&AM
EA 49.000 $89.000 $100.000 $100.000 $115.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 25.000 $59.000 $35.000 $100.000 $92.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 11.000 $28.000 $25.000 $50.000 $28.750
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 28.000 $22.500 $25.000 $100.000 $42.550
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 52,050.000 $0.250 $0.500 $0.500 $0.580
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
LF 6,994.000 $0.250 $0.600 $0.750 $0.690
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 279.000 $2.000 $1.000 $0.750 $1.150
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 2,798.000 $6.000 $5.000 $6.000 $6.900
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 54,850.000 $1.000 $1.200 $2.000 $1.070
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 44.000 $10.000 $7.000 $20.000 $9.370
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 56,750.000 $1.000 $1.200 $2.000 $1.070
REFL PAV MRK TY I (W)8"(DOT)(090MIL)
LF 140.000 $2.370 $4.650 $3.000 $2.650
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 200.000 $1.500 $2.200 $3.000 $1.440
REFL PAV MRK TY I (W)12"(SLD)(090MIL)
LF 537.000 $6.000 $6.000 $6.000 $5.980
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
LF 1,019.000 $10.000 $9.000 $8.000 $10.930
REFL PAV MRK TY I (W)(ARROW)(090MIL)
EA 2.000 $150.000 $165.000 $250.000 $287.500
REFL PAV MRK TY I (W)(WORD)(090MIL)
EA 2.000 $190.000 $215.000 $250.000 $402.500
REF PAV MRK TY I(W)18"(YLD TRI)(090MIL)
EA 20.000 $60.000 $90.000 $250.000 $92.000
REFL PAV MRK TY I (Y)24"(SLD)(090MIL)
LF 365.000 $8.000 $10.000 $10.000 $10.930
REFL PAV MRK TY I(Y)(MED NOSE)(090MIL)
EA 2.000 $330.000 $325.000 $1,250.000 $517.500
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
LF 54,549.000 $0.650 $0.700 $1.000 $0.920
RE PM W/RET REQ TY I (Y)6"(BRK)(090MIL)
LF 5,788.000 $0.650 $0.750 $1.000 $0.940
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
LF 10,031.000 $0.650 $0.700 $1.000 $0.920
REFL PAV MRKR TY I-C
EA 10.000 $6.000 $10.000 $6.000 $6.900
REFL PAV MRKR TY II-A-A
EA 514.000 $3.200 $5.750 $6.000 $6.900
ELIM EXT PAV MRK & MRKS (4")
LF 59,323.000 $0.500 $0.520 $0.500 $0.690
REINFORMT GRID FOR ASPH PVMT (TY II)
LF 46,858.000 $9.000 $6.000 $9.000 $6.000
D-GR HMA TY-B PG64-22
TON 25,037.310 $105.000 $114.300 $120.000 $120.120
SP MIXES SP-C SAC-A PG64-22
TON 19,457.910 $120.000 $125.650 $132.000 $122.360
TACK COAT
GAL 5,064.520 $5.000 $7.000 $8.000 $7.000
UNDERSEAL COURSE
GAL 34,162.260 $4.000 $7.000 $5.000 $7.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $15,000.000 $15,000.000 $16,500.000 $14,473.190
TMA (STATIONARY)
DAY 330.000 $200.000 $180.000 $250.000 $488.980
TMA (MOBILE OPERATION)
HR 96.000 $32.000 $75.000 $85.000 $112.600
1
RC PIPE (CL III)(18 IN)
LF 300.000 $80.000 $61.000 $105.000 $69.000
1A
THERMO PIPE(18")(PP)(TY S)(TY II)
LF 300.000 $80.000 $0.000 $0.000 $0.000
2
RC PIPE (CL III)(24 IN)
LF 102.000 $120.000 $91.000 $150.000 $97.750
2A
THERMO PIPE(24")(PP)(TY S)(TY II)
LF 102.000 $120.000 $0.000 $0.000 $0.000
3
RC PIPE (CL III)(30 IN)
LF 158.000 $150.000 $130.000 $175.000 $143.750
3A
RC PIPE (CL III)(30 IN)
LF 56.000 $150.000 $0.000 $0.000 $0.000
3A
THERMO PIPE(30")(PP)(TY S)(TY II)
LF 102.000 $150.000 $0.000 $0.000 $0.000
4
RC PIPE (CL III)(36 IN)
LF 226.000 $180.000 $152.000 $200.000 $201.250
4A
THERMO PIPE(36")(PP)(TY S)(TY II)
LF 226.000 $180.000 $0.000 $0.000 $0.000
5
RC PIPE (CL III)(48 IN)
LF 34.000 $220.000 $212.000 $350.000 $345.000
5A
THERMO PIPE(48")(PP)(TY S)(TY II)
LF 34.000 $220.000 $0.000 $0.000 $0.000
Totals: $10,989,746.588 $11,405,903.308 $12,655,434.030 $13,074,121.100