County: HUDSPETH Highway: IH 10 Date: 05/02/2024 (6 months ago) Engineer's Estimate: $36,843,188 Control Number: 2121-06-052
Project: F 2B24(070) District: EL PASO Time: 408 WORKING DAYS Type: CONSTRUCT REST AREA
Questions
HCS
Plans: Vol 1 | Vol 2 | Rev 1 | Rev 2 | Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $36,843,188.38
VEMAC, LLC   $67,770,417.96 1
83.94% | $30,927,229.58

Bid Items

Items: 137, 0 filtered
HUDSPETH IH 10  |  EL PASO  |  2121-06-052  |  05/02/2024  |  $36,843,188  |  F 2B24(070)  |  CONSTRUCT REST AREA  |  408 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate VEMAC, LLC
100 6001 PREPARING ROW AC 46.320 $10,000.000 $36,253.680
110 6001 EXCAVATION (ROADWAY) CY 167,672.000 $16.000 $3.560
110 6003 EXCAVATION (SPECIAL) CY 1.250 $250.000 $3,564.780
132 6002 EMBANKMENT (FINAL)(DENS CONT)(TY A) CY 197,129.000 $10.000 $13.220
164 6010 BROADCAST SEED (TEMP) (WARM) AC 10.000 $1,000.000 $1,501.630
164 6012 BROADCAST SEED (TEMP) (COOL) AC 10.000 $350.000 $1,501.630
164 6018 STRAW/HAY MLCH SEED(PERM)(URBAN)(SANDY) AC 10.000 $1,350.000 $5,485.640
168 6001 VEGETATIVE WATERING MG 1,255.000 $15.000 $296.420
170 6006 IRRIGATION SYSTEM LOCATION A LS 1.000 $55,000.000 $170,984.780
170 6007 IRRIGATION SYSTEM LOCATION B LS 1.000 $55,000.000 $170,984.780
192 6002 PLANT MATERIAL (1-GAL) EA 40,436.000 $15.000 $13.090
192 6003 PLANT MATERIAL (3-GAL) EA 684.000 $25.000 $67.040
192 6004 PLANT MATERIAL (5-GAL) EA 202.000 $35.000 $70.150
192 6005 PLANT MATERIAL (15-GAL) EA 287.000 $200.000 $94.580
192 6024 PLANT MATERIAL (30 GAL) (TREE) EA 68.000 $350.000 $1,450.390
192 6025 PLANT MATERIAL (45 GAL) (TREE) EA 34.000 $500.000 $1,911.440
192 6067 LANDSCAPE EDGE (TYPE I) LF 2,206.000 $20.000 $15.590
192 6068 LANDSCAPE EDGE (TYPE II) LF 817.000 $25.000 $41.560
192 6069 LANDSCAPE EDGE (TYPE III) LF 1,506.000 $10.000 $16.620
275 6001 CEMENT TON 415.000 $190.000 $332.490
275 6019 CEMENT TREAT (SUBGRADE)(6") SY 98,105.000 $3.000 $7.560
310 6001 PRIME COAT (MULTI OPTION) GAL 18,986.000 $6.750 $6.230
360 6002 CONC PVMT (CONT REINF - CRCP) (8") SY 14,086.000 $85.000 $130.590
360 6004 CONC PVMT (CONT REINF - CRCP) (10") SY 75,974.000 $90.000 $160.440
416 6005 DRILL SHAFT (42 IN) LF 75.000 $475.000 $662.900
416 6006 DRILL SHAFT (48 IN) LF 60.000 $600.000 $741.870
416 6029 DRILL SHAFT (RDWY ILL POLE) (30 IN) LF 416.000 $380.000 $477.200
420 6002 CL A CONC (MISC) CY 88.000 $850.000 $935.120
423 6015 RETAINING WALL (SPECIAL) SF 546.000 $45.000 $380.600
432 6001 RIPRAP (CONC)(4 IN) CY 7.500 $625.000 $935.120
432 6006 RIPRAP (CONC)(CL B) CY 26.000 $550.000 $1,142.930
432 6023 RIPRAP (STONE COMMON)(DRY)(8 IN) CY 206.000 $205.000 $194.150
432 6024 RIPRAP (STONE COMMON)(DRY)(12 IN) CY 2,409.000 $255.000 $189.940
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 103.000 $600.000 $831.220
462 6010 CONC BOX CULV (6 FT X 3 FT) LF 964.000 $370.000 $562.370
464 6003 RC PIPE (CL III)(18 IN) LF 1,858.000 $88.500 $108.410
464 6005 RC PIPE (CL III)(24 IN) LF 628.000 $109.000 $159.700
464 6007 RC PIPE (CL III)(30 IN) LF 916.000 $150.000 $183.060
464 6008 RC PIPE (CL III)(36 IN) LF 316.000 $182.000 $224.610
464 6010 RC PIPE (CL III)(48 IN) LF 61.000 $350.000 $380.850
464 6011 RC PIPE (CL III)(54 IN) LF 158.000 $250.000 $413.570
464 6012 RC PIPE (CL III)(60 IN) LF 498.000 $495.000 $519.260
464 6020 RC PIPE (CL IV)(36 IN) LF 18.000 $240.000 $354.980
465 6001 INLET (COMPL)(TY S) EA 1.000 $6,400.000 $4,301.130
465 6002 MANH (COMPL)(PRM)(48IN) EA 1.000 $7,500.000 $4,924.540
465 6003 MANH (COMPL)(PRM)(60IN) EA 2.000 $8,200.000 $4,560.880
465 6006 JCTBOX(COMPL)(PJB)(4FTX4FT) EA 3.000 $7,000.000 $5,854.690
465 6013 INLET (COMPL)(PCO)(3FT)(NONE) EA 2.000 $6,800.000 $4,815.670
465 6014 INLET (COMPL)(PCO)(3FT)(LEFT) EA 10.000 $7,000.000 $5,542.990
465 6015 INLET (COMPL)(PCO)(3FT)(RIGHT) EA 11.000 $6,700.000 $5,542.990
465 6126 INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT) EA 7.000 $6,500.000 $5,859.670
465 6338 INLET (COMPL)(ARMOR CURB SLOT) EA 7.000 $7,175.000 $2,938.690
466 6009 HEADWALL (CH - FW - 0) (DIA= 36 IN) EA 6.000 $18,000.000 $6,234.160
466 6024 HEADWALL (CH - FW - 15) (DIA= 36 IN) EA 2.000 $8,500.000 $7,792.700
466 6028 HEADWALL (CH - FW - 15) (DIA= 60 IN) EA 1.000 $14,000.000 $24,936.650
466 6041 HEADWALL (CH - FW - 30) (DIA= 48 IN) EA 2.000 $12,000.000 $18,702.490
466 6042 HEADWALL (CH - FW - 30) (DIA= 54 IN) EA 2.000 $13,000.000 $20,572.730
466 6101 HEADWALL (CH - PW - 0) (DIA= 36 IN) EA 1.000 $7,500.000 $6,234.160
466 6105 HEADWALL (CH - PW - 0) (DIA= 60 IN) EA 1.000 $20,000.000 $16,624.430
466 6180 WINGWALL (PW - 1) (HW=5 FT) EA 4.000 $20,500.000 $10,390.270
467 6362 SET (TY II) (18 IN) (RCP) (6: 1) (C) EA 1.000 $2,200.000 $2,078.050
467 6388 SET (TY II) (24 IN) (RCP) (3: 1) (C) EA 2.000 $2,200.000 $2,078.060
467 6417 SET (TY II) (30 IN) (RCP) (3: 1) (C) EA 2.000 $2,250.000 $4,156.110
480 6001 CLEAN EXIST CULVERTS EA 4.000 $4,000.000 $18,702.490
496 6006 REMOV STR (HEADWALL) EA 7.000 $2,000.000 $2,968.650
500 6001 MOBILIZATION LS 1.000 $2,336,518.570 $6,262,734.580
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 23.000 $10,000.000 $7,896.600
506 6003 ROCK FILTER DAMS (INSTALL) (TY 3) LF 1,535.000 $100.000 $76.650
506 6011 ROCK FILTER DAMS (REMOVE) LF 1,535.000 $20.000 $25.650
506 6020 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 156.000 $32.000 $63.610
506 6024 CONSTRUCTION EXITS (REMOVE) SY 156.000 $12.000 $25.650
506 6026 EMBANK (EROSN & SEDMT CONT, IN PLACE) CY 2,261.000 $29.000 $15.590
512 6017 PORT CTB (DES SOURCE)(F-SHAPE)(TY 1) LF 8,580.000 $7.910 $12.270
512 6041 PORT CTB (STKPL)(F-SHAPE)(TY 1) LF 8,580.000 $5.490 $12.270
529 6004 CONC CURB (MONO) (TY I) LF 229.000 $24.000 $10.390
529 6005 CONC CURB (MONO) (TY II) LF 13,771.000 $25.000 $16.620
531 6001 CONC SIDEWALKS (4") SY 372.000 $75.000 $114.290
531 6002 CONC SIDEWALKS (5") SY 1,178.000 $90.000 $197.420
531 6005 CURB RAMPS (TY 2) EA 2.000 $2,200.000 $2,909.280
531 6013 CURB RAMPS (TY 10) EA 3.000 $1,800.000 $2,909.280
531 6015 CURB RAMPS (TY 20) EA 3.000 $3,000.000 $4,363.910
531 6016 CURB RAMPS (TY 21) EA 1.000 $2,600.000 $3,324.890
540 6002 MTL W-BEAM GD FEN (STEEL POST) LF 1,649.000 $41.000 $37.400
540 6016 DOWNSTREAM ANCHOR TERMINAL SECTION EA 7.000 $2,000.000 $2,221.440
542 6001 REMOVE METAL BEAM GUARD FENCE LF 400.000 $10.000 $3.120
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 7.000 $3,500.000 $4,255.850
544 6003 GUARDRAIL END TREATMENT (REMOVE) EA 2.000 $400.000 $335.610
545 6005 CRASH CUSH ATTEN (REMOVE) EA 6.000 $1,100.000 $1,870.250
545 6019 CRASH CUSH ATTEN (INSTL)(S)(N)(TL3) EA 6.000 $12,700.000 $10,047.390
552 6001 WIRE FENCE (TY A) LF 12,427.000 $20.000 $19.220
610 6218 IN RD IL (TY SA) 40T-12 (250W EQ) LED EA 52.000 $6,000.000 $6,849.470
618 6023 CONDT (PVC) (SCH 40) (2") LF 12,135.000 $25.000 $34.540
618 6024 CONDT (PVC) (SCH 40) (2") (BORE) LF 570.000 $36.000 $56.680
620 6010 ELEC CONDR (NO.6) INSULATED LF 31,216.000 $3.250 $3.270
620 6016 ELEC CONDR (NO.2) INSULATED LF 8,899.000 $5.000 $5.150
624 6002 GROUND BOX TY A (122311)W/APRON EA 20.000 $1,675.000 $2,301.440
628 6128 ELC SRV TY D 120/240 060(NS)GS(N)GC(O) EA 1.000 $9,000.000 $10,598.070
628 6225 ELC SRV TY D 120/240 100(NS)GS(N)GC(O) EA 2.000 $9,200.000 $11,319.160
644 6001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 52.000 $1,000.000 $1,248.910
644 6004 IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA 4.000 $1,160.000 $1,723.750
644 6030 IN SM RD SN SUP&AM TYS80(1)SA(T) EA 4.000 $1,360.000 $1,758.030
644 6037 IN SM RD SN SUP&AM TYS80(1)SA(U-WC) EA 2.000 $1,800.000 $2,063.510
644 6051 IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL) EA 10.000 $1,500.000 $3,794.940
650 6028 INS OH SN SUP(30 FT BAL TEE) EA 2.000 $53,500.000 $69,525.570
666 6018 REFL PAV MRK TY I (W)6"(DOT)(100MIL) LF 582.000 $2.500 $2.180
666 6036 REFL PAV MRK TY I (W)8"(SLD)(100MIL) LF 1,983.000 $1.900 $2.390
666 6042 REFL PAV MRK TY I (W)12"(SLD)(100MIL) LF 538.000 $3.500 $2.910
666 6078 REFL PAV MRK TY I (W)(WORD)(100MIL) EA 4.000 $230.000 $181.830
666 6099 REF PAV MRK TY I(W)18"(YLD TRI)(100MIL) EA 34.000 $56.000 $57.150
666 6166 RE PM TY I (ACC PRK)(WHT)(SYMBOL ONLY) EA 4.000 $650.000 $57.150
666 6303 RE PM W/RET REQ TY I (W)4"(SLD)(100MIL) LF 23,220.000 $0.900 $1.000
666 6343 REF PROF PAV MRK TY I(W)6"(SLD)(100MIL) LF 15,786.000 $1.250 $1.920
666 6347 REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL) LF 12,360.000 $1.400 $1.920
672 6006 REFL PAV MRKR TY I-A EA 529.000 $5.000 $4.520
672 6007 REFL PAV MRKR TY I-C EA 627.000 $6.000 $4.520
672 6010 REFL PAV MRKR TY II-C-R EA 169.000 $7.000 $4.520
1002 6002 LANDSCAPE AMENITY (TY 1) EA 38.000 $500.000 $405.220
1002 6003 LANDSCAPE AMENITY (TY 2) EA 71.000 $250.000 $405.220
1002 6004 LANDSCAPE AMENITY (TY 3) EA 195.000 $100.000 $405.220
1002 6005 LANDSCAPE AMENITY (TY 4) EA 1.000 $6,680.000 $20,780.540
1002 6006 LANDSCAPE AMENITY (TY 5) EA 2.000 $8,400.000 $10,390.270
1002 6007 LANDSCAPE AMENITY (TY 6) EA 2.000 $93,000.000 $10,390.270
1002 6008 LANDSCAPE AMENITY (TY 7) EA 2.000 $24,300.000 $10,390.270
1005 6001 LOOSE AGGR FOR GROUNDCOVER (TYPE I) CY 40.000 $250.000 $598.480
1005 6002 LOOSE AGGR FOR GROUNDCOVER (TYPE II) CY 65.000 $100.000 $534.060
1005 6003 LOOSE AGGR FOR GROUNDCOVER (TYPE III) CY 75.000 $280.000 $592.250
3076 6001 D-GR HMA TY-B PG64-22 TON 20,706.000 $133.000 $144.680
5008 6001 WHEEL STOPS EA 4.000 $136.000 $1,039.030
5014 6001 SAFETY REST AREA LS 1.000 $10,846,802.110 $30,008,285.000
5062 6001 PATCHING MILLED CONCRETE RUMBLE STRIPS LF 3,365.000 $50.000 $46.760
6001 6002 PORTABLE CHANGEABLE MESSAGE SIGN EA 2.000 $9,560.000 $15,585.410
6010 6011 CCTV FIELD EQUIP (DIGITAL) (INSTL ONLY) EA 3.000 $3,200.000 $1,511.780
6028 6001 INSTALL DMS (POLE MTD CABINET) EA 2.000 $31,000.000 $54,487.610
6064 6046 ITS POLE (55 FT)(90 MPH) EA 3.000 $26,250.000 $33,014.040
6064 6084 ITS POLE MNT CAB (TY 2)(CONF 2) EA 3.000 $7,600.000 $6,787.960
6377 6001 SYSTEM INTEGRATION LS 1.000 $100,000.000 $39,483.020
6386 6001 INSTALLATION OF CELLULAR MODEM EA 5.000 $2,200.000 $1,326.840
Totals: $36,843,188.38 $67,770,417.97