HUDSPETH IH 10 (0002-10-039)

Items: 61

County: HUDSPETH
Length: N/A
Highway: IH 10
District: EL PASO
Control Number: 0002-10-039
DBE Goal: N/A
Project: F 2024(040)
Guaranty: N/A
Time: 160 WORKING DAYS
Engineer's Estimate: $18,263,527.79
Date: 09/07/2023 (2 years ago)
Contract Number: N/A
Type: PREVENTIVE MAINTENANCE
Mail/Deliver Bids To: N/A
ARMANDO RAMIREZ2
MONICA RUIZ
ALDO MADRID
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$18,263,527.79
$18,357,209.18
Over/Under Est: 0.51% $93,681.39
Over/Under Est: 12.19% $2,226,425.96
Amt Left: 11.62% $2,132,744.57
Subcontractor Percentage Amount
TRI STATE ELECTRIC, LTD. 5.94% $1,074,555.30
PMI PAVEMENT MARKING, LLC 2.21% $399,792.46
HARDY HOLE DRILLING 0.66% $119,395.03
WEST TEXAS ROCK RESOURCES, LLC 0.12% $21,708.19
MAJOR MOTION LOGISTICS, LLC 0.06% $10,854.09
SOUTHEAST GRINDING AND GROOVING LLC 0.03% $5,427.05
Total: 9.02% $1,631,732.12

Bid Items & Bid Tabulations

61 Total 0 of 61
HUDSPETH  |  IH 10  |  EL PASO  |  0002-10-039  |  09/07/2023  |  $18,263,527.79  |  F 2024(040)  |  PREVENT MAINT  |  160 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DAN WILLIAMS COMPANY
LESNA CONSTRUCTION, INC.
PREPARING ROW
AC 0.600 $40,000.000 $12,000.000 $40,000.000
EXCAVATION (SPECIAL)
CY 3.500 $300.000 $1,275.000 $1,100.000
BACKFILL (TY A OR B)
STA 1,051.000 $251.810 $175.000 $200.000
EMULS ASPH (EROSN CONT)(MULTI)
GAL 2,594.000 $4.500 $7.500 $4.500
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 17,937.000 $53.060 $50.000 $55.000
PLAN & TEXT ASPH CONC PAV(0" TO 2")
SY 19,257.000 $5.810 $4.250 $1.750
PLANE ASPH CONC PAV(0" TO 1")
SY 6,253.000 $2.000 $4.750 $2.000
PLANE ASPH CONC PAV(MICRO-MLLING)(1")
SY 460,547.000 $0.900 $0.850 $0.750
PAV JT UNDERSEAL (24")
LF 480.000 $60.000 $55.000 $20.000
DRILL SHAFT (42 IN)
LF 147.000 $990.000 $1,000.000 $1,000.000
DRILL SHAFT (48 IN)
LF 30.000 $1,000.000 $1,175.000 $1,200.000
CONC STR REPR(RAPID DECK REP(FULL DPT))
SF 576.000 $200.000 $262.000 $210.000
RIPRAP (CONC)(4 IN)
CY 12.000 $1,000.000 $1,050.000 $700.000
RIPRAP (MOW STRIP)(4 IN)
CY 13.000 $750.000 $850.000 $775.000
CLEANING AND SEALING EXIST JOINTS(CL3)
LF 1,732.000 $35.000 $30.500 $28.000
MOBILIZATION
LS 1.000 $1,422,112.220 $336,000.000 $800,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $10,000.000 $7,500.000 $15,000.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 212,721.000 $0.190 $0.120 $0.250
MTL W-BEAM GD FEN (STEEL POST)
LF 150.000 $95.000 $42.000 $120.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $6,500.000 $1,475.000 $5,000.000
GUARDRAIL END TREATMENT (INSTALL)
EA 1.000 $7,500.000 $3,200.000 $5,000.000
CONDT (PVC) (SCH 40) (2")
LF 2,295.000 $30.000 $32.000 $32.000
CONDT (PVC) (SCH 40) (2") (BORE)
LF 460.000 $38.000 $40.000 $40.000
ELEC CONDR (NO.8) INSULATED
LF 2,685.000 $2.600 $3.250 $3.500
ELEC CONDR (NO.2) INSULATED
LF 6,365.000 $4.000 $5.000 $5.000
GROUND BOX TY A (122311)W/APRON
EA 20.000 $1,700.000 $1,700.000 $1,700.000
ELC SRV TY D 120/240 060(NS)GS(N)GC(O)
EA 6.000 $8,675.000 $9,125.000 $9,200.000
ELC SRV TY D 120/240 100(NS)GS(N)GC(O)
EA 1.000 $10,035.000 $11,000.000 $11,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 3.000 $1,000.000 $5,500.000 $6,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 65.000 $1,000.000 $1,345.000 $1,400.000
IN SM RD SN SUP&AM (INST SIGN ONLY)
EA 2.000 $326.000 $320.000 $320.000
REMOVE SM RD SN SUP&AM
EA 37.000 $180.000 $225.000 $230.000
INS OH SN SUP(30 FT BAL TEE)
EA 1.000 $56,500.000 $55,450.000 $56,000.000
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 26,686.000 $0.720 $0.320 $0.400
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 111,357.000 $0.550 $0.280 $0.330
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 106,560.000 $0.600 $0.290 $0.340
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 8,864.000 $2.000 $2.260 $2.000
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 240.000 $1.260 $3.170 $3.500
REFL PAV MRK TY I (W)(NUMBER)(090MIL)
EA 4.000 $280.000 $210.000 $220.000
REFL PAV MRK TY I(W)(ENTR GORE)(090MIL)
EA 7.000 $1,000.000 $950.000 $1,000.000
REFL PAV MRK TY I(W)(EXIT GORE)(090MIL)
EA 6.000 $745.000 $2,845.000 $3,000.000
RE PM W/RET REQ TY I (W)6"(BRK)(090MIL)
LF 26,686.000 $1.190 $1.240 $1.290
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
LF 111,365.000 $1.190 $1.180 $1.250
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
LF 106,560.000 $1.190 $1.120 $1.170
REFL PAV MRKR TY I-R
EA 182.000 $15.810 $5.350 $5.500
REFL PAV MRKR TY II-C-R
EA 1,768.000 $4.820 $5.350 $5.500
D-GR HMA TY-C PG76-22 (LEVEL-UP)
TON 6.000 $108.000 $1,050.000 $500.000
STONE-MTRX-ASPH SMA-C SAC-A PG76-22
TON 63,326.000 $141.140 $155.000 $175.000
TACK COAT
GAL 69,082.000 $4.000 $5.500 $6.000
TBWC (MEMBRANE)
GAL 102,696.000 $5.000 $5.100 $4.500
TBWC PG76-22 SAC-A TY C
TON 23,340.000 $145.000 $160.000 $172.500
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 280.000 $100.000 $135.000 $150.000
CCTV FIELD EQUIP (DIGITAL) (INSTL ONLY)
EA 7.000 $2,300.000 $2,900.000 $3,000.000
INSTALL DMS (POLE MTD CABINET)
EA 1.000 $35,588.000 $38,500.000 $40,000.000
ITS POLE (55 FT)(90 MPH)
EA 7.000 $25,500.000 $27,000.000 $27,000.000
ITS POLE MNT CAB (TY 2)(CONF 2)
EA 7.000 $8,500.000 $8,600.000 $9,000.000
TMA (STATIONARY)
DAY 240.000 $210.560 $185.000 $250.000
TMA (MOBILE OPERATION)
DAY 80.000 $340.420 $315.000 $350.000
SYSTEM INTEGRATION
LS 1.000 $60,000.000 $36,500.000 $37,000.000
INSTALLATION OF CELLULAR MODEM
EA 8.000 $3,600.000 $2,900.000 $3,000.000
BACKLIT W/ PERIMETER LED RDSD SGN
EA 16.000 $4,865.000 $8,000.000 $9,000.000
Totals: $18,263,527.790 $18,357,209.180 $20,489,953.750