EXCAVATION (SPECIAL)
|
CY
|
11.500
|
$61.150
|
$550.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
30.000
|
$250.000
|
$450.000
|
|
|
DRILL SHAFT (30 IN)
|
LF
|
175.000
|
$225.000
|
$450.000
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
125.000
|
$240.000
|
$525.000
|
|
|
DRILL SHAFT (48 IN)
|
LF
|
84.000
|
$365.000
|
$575.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
18.750
|
$348.780
|
$500.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
89.000
|
$335.480
|
$500.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$150,000.000
|
$86,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
12.000
|
$10,000.000
|
$5,200.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
1,025.000
|
$25.140
|
$36.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
6.000
|
$1,055.000
|
$2,500.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
6.000
|
$2,992.000
|
$4,800.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
8,069.000
|
$11.000
|
$12.500
|
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
644.000
|
$24.240
|
$45.000
|
|
|
CONDT (PVC) (SCH 40) (3")
|
LF
|
25,131.000
|
$16.250
|
$16.500
|
|
|
CONDT (PVC) (SCH 40) (3") (BORE)
|
LF
|
1,996.000
|
$33.500
|
$35.000
|
|
|
ELEC CONDR (NO.14) INSULATED
|
LF
|
31,470.000
|
$0.800
|
$1.000
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
11,103.000
|
$1.600
|
$1.950
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
16,706.000
|
$1.600
|
$2.250
|
|
|
ELEC CONDR (NO.4) INSULATED
|
LF
|
5,256.000
|
$1.650
|
$3.000
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
32.000
|
$1,564.710
|
$1,250.000
|
|
|
GROUND BOX TY 1 (364860)W/APRON
|
EA
|
26.000
|
$1,800.000
|
$3,850.000
|
|
|
GROUND BOX TY 2 (366048)W/APRON
|
EA
|
15.000
|
$4,218.500
|
$6,500.000
|
|
|
ELC SRV TY D 120/240 100(NS)GS(N)GC(O)
|
EA
|
6.000
|
$7,470.000
|
$6,800.000
|
|
|
INS OH SN SUP(30 FT BAL TEE)
|
EA
|
3.000
|
$26,700.000
|
$31,000.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
20.000
|
$106.150
|
$125.000
|
|
|
ITS SYSTEM SUPPORT EQUIPMENT
|
LS
|
1.000
|
$15,000.000
|
$25,000.000
|
|
|
FIBER OPTIC CBL (SNGLE-MODE)(12 FIBER)
|
LF
|
1,213.000
|
$5.000
|
$12.000
|
|
|
FIBER OPTIC CBL (SNGLE-MODE)(72 FIBER)
|
LF
|
30,257.000
|
$8.000
|
$5.050
|
|
|
FIBER OPTIC PATCH PANEL (12 POSITION)
|
EA
|
15.000
|
$3,000.000
|
$2,600.000
|
|
|
FIBER OPTIC PATCH PANEL (72 POSITION)
|
EA
|
1.000
|
$4,500.000
|
$4,500.000
|
|
|
FO SPLICE ENCLOSURE (TYPE 1)
|
EA
|
15.000
|
$2,013.370
|
$3,500.000
|
|
|
ITS GRND MNT CAB (TY 4) (CONF 1)
|
EA
|
1.000
|
$15,700.000
|
$11,500.000
|
|
|
ITS GRND MNT CAB (TY 6) (CONF 2)
|
EA
|
1.000
|
$15,000.000
|
$12,000.000
|
|
|
CCTV FIELD EQUIP (DIGITAL) (INSTL ONLY)
|
EA
|
5.000
|
$1,353.780
|
$450.000
|
|
|
ITS POLE (30 FT)(90 MPH)
|
EA
|
7.000
|
$8,720.000
|
$7,800.000
|
|
|
ITS POLE (55 FT)(90 MPH)
|
EA
|
5.000
|
$21,000.000
|
$9,800.000
|
|
|
ITS POLE MNT CAB (TY 2)(CONF 2)
|
EA
|
12.000
|
$6,133.050
|
$4,500.000
|
|
|
ITS POLE MNT CAB (TY 3)(CONF 2)
|
EA
|
3.000
|
$7,200.000
|
$6,500.000
|
|
|
INSTALLATION OF VE
|
EA
|
1.000
|
$600.000
|
$2,500.000
|
|
|
INSTALLATION OF VD
|
EA
|
1.000
|
$600.000
|
$2,500.000
|
|
|
INSTALLATION OF FES (FIELD CABINET)
|
EA
|
16.000
|
$600.000
|
$1,250.000
|
|
|
INSTALLATION OF FES (HUB CABINET)
|
EA
|
3.000
|
$600.000
|
$2,500.000
|
|
|
TMA (STATIONARY)
|
DAY
|
207.000
|
$209.130
|
$350.000
|
|
|
ITS RVSD (DC ONLY) (INSTALL ONLY)
|
EA
|
11.000
|
$600.000
|
$450.000
|
|
|
COLOR DMS (POLE MNT CABINET)
|
EA
|
3.000
|
$172,000.000
|
$160,500.000
|
|
|
INSTALLATION OF CELLULAR MODEM
|
EA
|
2.000
|
$1,200.000
|
$9,500.000
|
|
|
CENTRAL PROCESSING UNIT
|
EA
|
1.000
|
$25,000.000
|
$105,000.000
|
|
|
6001 SYSTEM INTEGRATION
|
LS
|
1.000
|
$50,000.000
|
$45,000.000
|
|
Totals: |
$2,707,251.360
|
$2,841,820.200
|