HUDSPETH IH 10 (0002-07-049)

Items: 134

County: HUDSPETH
Length: N/A
Highway: IH 10
District: EL PASO
Control Number: 0002-07-049
DBE Goal: N/A
Project: BR 1802(572)
Guaranty: N/A
Time: 0 X
Engineer's Estimate: $5,721,389.37
Date: 08/08/2018 (7 years ago)
Contract Number: N/A
Type: REPLACE BRIDGES AND APPROACHES
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (1)
E
Engineer's Estimate
$5,721,389.37
$7,766,378.70
Over/Under Est: 35.74% $2,044,989.33

Bid Items & Bid Tabulations

134 Total 0 of 134
HUDSPETH  |  IH 10  |  EL PASO  |  0002-07-049  |  08/08/2018  |  $5,721,389.37  |  BR 1802(572)  |  REPLACE BRIDGES AND APPROACHES  |  0 X
Item Code
Description
Unit
Quantity
Engineer's Estimate
DAN WILLIAMS COMPANY
PREPARING ROW
AC 0.190 $10,000.000 $40,000.000
REMOVING CONC (PAV)
SY 2,076.000 $11.000 $16.000
REMOVING CONC (RIPRAP)
SY 1,920.000 $10.000 $9.000
REMOVING CONC (SIDEWALKS)
SY 285.000 $19.250 $12.000
REMOVING STAB BASE AND ASPH PAV (2"-6")
SY 3,492.000 $2.750 $10.000
EXCAVATION (ROADWAY)
CY 8,485.000 $7.000 $24.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 105.000 $10.000 $30.000
FL BS (CMP IN PLC)(TY A GR 5)(6")
SY 972.000 $13.250 $18.000
PRIME COAT(MC-30 OR AE-P)
GAL 432.000 $3.250 $8.000
D-GR HMA(SQ) TY-C PG64-22
TON 261.000 $106.000 $130.000
D-GR HMA(SQ) TY-C SAC-A PG70-22
TON 160.000 $112.000 $150.000
CONC PVMT (CONT REINF - CRCP) (13")
SY 1,190.000 $61.000 $170.000
STRUCT EXCAV (BOX)
CY 90.000 $8.000 $1.000
CEM STABIL BKFL
CY 112.000 $150.000 $260.000
TRENCH EXCAVATION PROTECTION
LF 50.000 $5.000 $3.000
DRILL SHAFT (24 IN)
LF 39.000 $160.000 $300.000
DRILL SHAFT (30 IN)
LF 512.000 $180.000 $250.000
DRILL SHAFT (36 IN)
LF 640.000 $200.000 $280.000
CL C CONC (ABUT)(HPC)
CY 68.000 $895.000 $1,100.000
CL C CONC (CAP)(HPC)
CY 69.200 $1,850.000 $1,700.000
CL C CONC (COLUMN)(HPC)
CY 79.500 $1,850.000 $800.000
REINF CONC SLAB (BOX BEAM)(HPC)
SF 15,600.000 $11.000 $16.000
APPROACH SLAB (HPC)
CY 145.600 $480.000 $600.000
SHEAR KEY
CY 64.800 $325.000 $450.000
PRESTR CONC BOX BEAM (5B20)
LF 3,096.000 $150.000 $220.000
OPAQUE SEALER FINISH
SF 46,376.000 $0.400 $0.400
PENETRATING CONCRETE SURFACE TREATMENT
SY 1,896.000 $13.000 $6.500
RIPRAP (CONC)(4 IN)
CY 259.000 $380.000 $650.000
RAIL (TY SSTR)(HPC)
LF 844.000 $45.000 $90.000
RAIL (HANDRAIL)(TY D)
LF 119.000 $125.000 $150.000
ARMOR JOINT (SEALED)
LF 144.000 $80.000 $110.000
CONC BOX CULV (6 FT X 3 FT)
LF 88.000 $300.000 $600.000
WINGWALL (PW - 1) (HW=4 FT)
EA 2.000 $12,000.000 $9,000.000
REMOV STR (WINGWALL)
EA 2.000 $1,500.000 $1,400.000
REMOV STR (BOX CULVERT)
LF 49.000 $70.000 $70.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 2.000 $20,000.000 $40,000.000
MOBILIZATION
LS 1.000 $368,799.030 $500,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $7,900.000 $14,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 225.000 $30.000 $70.000
ROCK FILTER DAMS (REMOVE)
LF 225.000 $9.000 $15.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 240.000 $21.500 $33.000
CONSTRUCTION EXITS (REMOVE)
SY 240.000 $8.000 $9.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 6,084.000 $2.750 $3.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 6,084.000 $1.000 $1.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 380.000 $8.000 $10.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 380.000 $1.500 $1.500
CONSTRUCTING DETOURS
SY 13,678.000 $40.000 $60.000
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 14,760.000 $25.000 $75.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 280.000 $46.000 $100.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 100.000 $50.000 $100.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 13,950.000 $5.000 $3.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 240.000 $5.250 $9.000
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 80.000 $9.250 $10.000
PORT CTB (STKPL)(F-SHAPE)(TY 1)
LF 14,760.000 $9.000 $7.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 280.000 $6.900 $20.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 100.000 $5.200 $20.000
CONC CURB & GUTTER (TY II)
LF 1,052.000 $17.000 $20.000
CONC SIDEWALKS (4")
SY 411.000 $50.000 $60.000
CURB RAMPS (TY 10)
EA 4.000 $1,950.000 $1,500.000
MTL W-BEAM GD FEN (STEEL POST)
LF 4,650.000 $22.000 $25.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 8.000 $1,803.000 $2,500.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 4.000 $1,066.000 $1,400.000
REMOVE METAL BEAM GUARD FENCE
LF 4,885.000 $3.250 $4.000
REMOVE TERMINAL ANCHOR SECTION
EA 4.000 $218.000 $320.000
REMOVE CABLE BARRIER
LF 2,900.000 $10.000 $6.000
REMOVE CABLE BARRIER
LF 1,039.000 $10.000 $6.000
REMOVE CABLE BARRIER TERMINAL SECTION
EA 2.000 $2,500.000 $800.000
REMOVE CABLE BARRIER TERMINAL SECTION
EA 2.000 $2,500.000 $800.000
INSTALL SALVAGE CABLE BARRIER
LF 2,892.000 $11.000 $8.000
INSTALL SALVAGE CABLE BARRIER
LF 986.000 $11.000 $9.000
INSTALL SALVAGE CABLE BAR TERM SECTION
EA 2.000 $2,640.000 $2,300.000
INSTALL SALVAGE CABLE BAR TERM SECTION
EA 2.000 $2,640.000 $2,300.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,355.000 $2,800.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $272.000 $300.000
CRASH CUSH ATTEN (INSTL)
EA 5.000 $10,120.000 $8,000.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 3.000 $1,545.000 $700.000
CRASH CUSH ATTEN (REMOVE)
EA 5.000 $840.000 $700.000
REMOVE RD IL ASM (TRANS-BASE)
EA 3.000 $2,000.000 $1,500.000
IN RD IL AM (TY AL) 30S-8 (250W) S
EA 2.000 $2,800.000 $3,400.000
IN RD IL AM (TY SA) 40T-8 (250W) S
EA 4.000 $2,800.000 $6,000.000
CONDT (PVC) (SCH 40) (2")
LF 1,700.000 $20.000 $30.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 460.000 $30.000 $55.000
CONDT (RM) (2")
LF 80.000 $60.000 $70.000
ELEC CONDR (NO.8) BARE
LF 2,100.000 $2.000 $3.400
ELEC CONDR (NO.8) INSULATED
LF 4,200.000 $2.500 $3.400
GROUND BOX TY A (122311)W/APRON
EA 7.000 $1,100.000 $1,650.000
ALUMINUM SIGNS (TY A)
SF 42.000 $40.000 $46.000
ALUMINUM SIGNS (TY G)
SF 440.000 $35.000 $56.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 9.000 $612.000 $730.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 7.000 $620.000 $740.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T-2EXT)
EA 2.000 $750.000 $1,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 2.000 $700.000 $980.000
IN SM RD SN SUP&AM TY10BWG(2)SA(P-EXAL)
EA 1.000 $1,200.000 $1,100.000
IN SM RD SN SUP&AM TYS80(1)SA(T-2EXT)
EA 2.000 $800.000 $1,200.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 2.000 $2,000.000 $3,400.000
REMOVE SM RD SN SUP&AM
EA 26.000 $150.000 $125.000
INSTALL LRSS (STRUCT STEEL)
LB 1,637.000 $8.000 $10.000
INSTL DEL ASSM (D-SW)SZ 2(WC)GND
EA 5.000 $50.000 $35.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 6.000 $30.000 $36.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BR)
EA 41.000 $30.000 $40.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 6.000 $25.000 $35.000
INSTL DEL ASSM (D-SY)SZ (BRF)GF1 (BR)
EA 4.000 $25.000 $40.000
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 42.000 $3.000 $2.400
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 27,171.000 $1.200 $0.600
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 32,637.000 $1.200 $0.600
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 5,245.000 $1.000 $1.300
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 37.000 $5.000 $4.100
REFL PAV MRK TY II (W) 4" (BRK)
LF 3,890.000 $0.120 $0.200
REFL PAV MRK TY II (W) 4" (SLD)
LF 16,682.000 $0.120 $0.200
REFL PAV MRK TY II (W) 8" (SLD)
LF 5,245.000 $0.350 $0.400
REFL PAV MRK TY II (W) 24" (SLD)
LF 37.000 $2.500 $2.300
REFL PAV MRK TY II (Y) 4" (BRK)
LF 250.000 $0.200 $0.200
REFL PAV MRK TY II (Y) 4" (SLD)
LF 16,320.000 $0.120 $0.200
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 3,890.000 $0.500 $0.600
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 16,682.000 $0.500 $0.600
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 250.000 $0.500 $0.600
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 16,320.000 $0.500 $0.600
REFL PAV MRKR TY II-A-A
EA 13.000 $3.000 $3.500
REFL PAV MRKR TY II-C-R
EA 457.000 $3.250 $3.500
ELIM EXT PAV MRK & MRKS (4")
LF 33,793.000 $0.500 $0.500
ELIM EXT PAV MRK & MRKS (8")
LF 1,444.000 $0.750 $0.900
PAV SURF PREP FOR MRK (4")
LF 37,142.000 $0.100 $0.100
PAV SURF PREP FOR MRK (8")
LF 5,245.000 $0.300 $0.200
PAV SURF PREP FOR MRK (24")
LF 37.000 $0.800 $2.100
ANTI - GRAFFITI COATNG(PERMNENT-TY III)
SF 46,376.000 $1.000 $0.800
NO. OF WORKING DAYS
$/D 10,000.000 $141.000 $141.000
LOOSE AGGR FOR GROUNDCOVER (TYPE I)
CY 151.100 $60.000 $130.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 3.000 $10,160.000 $8,000.000
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
LF 320.000 $3.000 $18.000
MODULAR GLARE SCREENS (FURN & INSTALL)
LF 6,405.000 $14.000 $15.000
MODULAR GLARE SCREENS (REMOVE)
LF 6,405.000 $2.500 $1.000
MODULAR GLARE SCREENS (MOVE)
LF 500.000 $2.000 $3.000
TMA (STATIONARY)
EA 2.000 $5,000.000 $10,000.000
TMA (MOBILE OPERATION)
HR 40.000 $40.000 $50.000
Totals: $5,721,389.370 $7,766,378.700