County: HUDSPETH Highway: SH 20 Date: 02/02/2023 (1 year ago) Engineer's Estimate: $3,368,915 Control Number: 0002-04-034
Project: STP 2023(472)HES District: EL PASO Time: 180 WORKING DAYS Type: HAZARD ELIMINATION & SAFETY
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14
Plans: Plans | Revision | Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $3,368,914.77
LESNA CONSTRUCTION, INC.   $3,183,455.40 1
-5.51% | -$185,459.37
DAN WILLIAMS COMPANY   $3,203,707.85 2
-4.9% | -$165,206.92
0.64% | $20,252.45
INTERNATIONAL EAGLE ENTERPRISES, INC.   $3,643,816.60 3
8.16% | $274,901.83
14.46% | $460,361.20
13.74% | $440,108.75
Subcontractor Percentage Amount
PMI PAVEMENT MARKING, LLC 3.53% $112,375.98
PROFESSIONAL TRAFFIC CONTROL LLC 0.40% $12,733.82
Total: 3.93% $125,109.80

Bid Items

Items: 50, 0 filtered
HUDSPETH SH 20  |  EL PASO  |  0002-04-034  |  02/02/2023  |  $3,368,915  |  STP 2023(472)HES  |  HAZARD ELIM & SAFETY  |  180 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate LESNA CONSTRUCTION, INC. DAN WILLIAMS COMPANY INTERNATIONAL EAGLE ENTERPRISES, INC.
100 6002 PREPARING ROW STA 289.600 $350.000 $120.000 $190.000 $250.000
112 6003 SUBGRADE WIDENING (DENS CONT) SY 38,388.000 $4.500 $4.000 $5.000 $2.500
134 6004 BACKFILL (TY A OR B) STA 374.000 $185.000 $150.000 $275.000 $200.000
216 6001 PROOF ROLLING HR 10.900 $90.000 $100.000 $68.000 $32.000
247 6230 FL BS (CMP IN PLACE)(TY A GR 1-2)(8") SY 31,793.000 $20.000 $20.000 $17.000 $12.500
310 6014 PRIME COAT (SS-1H) GAL 5,079.000 $6.500 $7.500 $5.000 $8.000
316 6001 ASPH (MULTI OPTION) GAL 8,835.000 $7.000 $7.500 $5.000 $8.000
316 6224 AGGR(TY-PB GR-4 SAC-B) CY 227.000 $200.000 $110.000 $160.000 $300.000
351 6002 FLEXIBLE PAVEMENT STRUCTURE REPAIR(6") SY 134.000 $62.000 $60.000 $120.000 $50.000
354 6021 PLANE ASPH CONC PAV(0" TO 2") SY 1,232.000 $5.000 $5.000 $4.000 $15.000
354 6134 PLANE ASPH CONC PAV (0" TO 1/2" MICRO) SY 115.000 $5.000 $15.000 $16.000 $200.000
416 6001 DRILL SHAFT (18 IN) LF 48.000 $300.000 $450.000 $200.000 $600.000
420 6066 CL C CONC (RAIL FOUNDATION) CY 15.500 $600.000 $600.000 $900.000 $1,500.000
450 6004 RAIL (TY T221) LF 20.000 $150.000 $200.000 $350.000 $200.000
450 6055 RAIL (TY T221) (MOD) LF 73.000 $250.000 $200.000 $225.000 $250.000
451 6005 RETROFIT RAIL (TY T221) LF 12.000 $150.000 $150.000 $600.000 $1,000.000
500 6001 MOBILIZATION LS 1.000 $178,985.120 $150,000.000 $208,000.000 $340,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 10.000 $10,000.000 $10,000.000 $15,000.000 $15,000.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 19,113.000 $4.000 $4.000 $2.000 $4.500
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 19,113.000 $1.000 $1.000 $0.500 $1.000
533 6004 RUMBLE STRIPS (CENTERLINE) ASPHALT LF 29,808.000 $1.000 $0.350 $0.180 $1.750
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 350.000 $32.500 $50.000 $30.000 $40.000
540 6006 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 4.000 $3,500.000 $3,500.000 $2,600.000 $2,500.000
542 6001 REMOVE METAL BEAM GUARD FENCE LF 225.000 $7.500 $4.000 $4.500 $5.000
542 6003 REMOVE DOWNSTREAM ANCHOR TERMINAL EA 2.000 $400.000 $450.000 $350.000 $500.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 4.000 $4,000.000 $3,900.000 $3,200.000 $3,500.000
544 6003 GUARDRAIL END TREATMENT (REMOVE) EA 2.000 $500.000 $500.000 $350.000 $500.000
545 6013 CRASH CUSH ATTEN (INSTL)(R)(N)(TL3) EA 4.000 $10,000.000 $12,000.000 $28,000.000 $32,000.000
560 6025 RELOCATE EXISTING MAILBOX EA 15.000 $450.000 $200.000 $650.000 $800.000
644 6001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 9.000 $850.000 $750.000 $1,100.000 $1,000.000
644 6004 IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA 3.000 $925.000 $750.000 $1,200.000 $1,100.000
644 6007 IN SM RD SN SUP&AM TY10BWG(1)SA(U) EA 1.000 $1,000.000 $850.000 $1,350.000 $1,000.000
644 6030 IN SM RD SN SUP&AM TYS80(1)SA(T) EA 1.000 $1,400.000 $850.000 $1,450.000 $1,000.000
644 6068 RELOCATE SM RD SN SUP&AM TY 10BWG EA 12.000 $850.000 $500.000 $890.000 $800.000
644 6076 REMOVE SM RD SN SUP&AM EA 14.000 $135.000 $140.000 $100.000 $250.000
658 6047 INSTL OM ASSM (OM-2Y)(WC)GND EA 19.000 $75.000 $50.000 $90.000 $54.000
658 6060 REMOVE DELIN & OBJECT MARKER ASSMS EA 19.000 $25.000 $10.000 $40.000 $25.000
666 6041 REFL PAV MRK TY I (W)12"(SLD)(090MIL) LF 525.000 $3.750 $7.500 $6.500 $10.000
666 6285 REF PROF PAV MRK TY I(W)6"(SLD)(090MIL) LF 60,116.000 $0.700 $1.750 $1.500 $1.750
666 6308 RE PM W/RET REQ TY I (W)6"(SLD)(090MIL) LF 2,148.000 $0.650 $1.200 $1.120 $2.000
666 6317 RE PM W/RET REQ TY I (Y)6"(BRK)(090MIL) LF 7,363.000 $1.000 $1.300 $1.150 $2.000
666 6320 RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL) LF 5,290.000 $0.750 $1.200 $1.100 $2.000
672 6009 REFL PAV MRKR TY II-A-A EA 442.000 $4.000 $6.250 $5.350 $10.000
677 6028 ELIM EXT PV MRK & MRKS (RUMBLE STRIP) LF 57,916.000 $1.000 $0.350 $0.300 $0.800
3077 6052 SP MIXES SP-D SAC-A PG70-22 TON 8,543.000 $145.000 $140.000 $135.000 $158.000
3077 6054 SP MIXES SP-D SAC-A PG70-22 (LEVEL-UP) TON 286.000 $300.000 $200.000 $200.000 $200.000
3077 6075 TACK COAT GAL 3,220.000 $7.000 $7.500 $5.000 $8.000
3085 6001 UNDERSEAL COURSE GAL 20,615.000 $7.000 $7.500 $5.000 $8.000
6001 6001 PORTABLE CHANGEABLE MESSAGE SIGN DAY 180.000 $125.000 $140.000 $110.000 $100.000
6185 6002 TMA (STATIONARY) DAY 168.000 $200.000 $125.000 $300.000 $150.000
Totals: $3,368,914.77 $3,183,455.40 $3,203,707.85 $3,643,816.60