Show Job Controls
Bid Cobra

HOWARD FM 2599 (2597-01-008)

Items: 48

County: HOWARD
Length: N/A
Highway: FM 2599
District: ABILENE
Control Number: 2597-01-008
DBE Goal: N/A
Project: STP 2023(595)HES
Guaranty: N/A
Time: 121 WORKING DAYS
Engineer's Estimate: $4,655,120.95
Date: 04/05/2023 (3 years ago)
Contract Number: N/A
Type: INSTALL/REPLACE SIGNS
Mail/Deliver Bids To: N/A
RYAN SAYLES
LARISSA HALFORD
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$4,655,120.95
1
$5,256,051.97
Over/Under Est: 12.91% $600,931.02
$5,642,324.40
Over/Under Est: 21.21% $987,203.45
Amt Left: 7.35% $386,272.43
Subcontractor Percentage Amount
BLACK JACK ENERGY SERVICES, LLC 13.12% $689,594.02
MARCOMS CONSTRUCTION LLC 8.63% $453,597.29
STX CIVIL 7.76% $407,869.63
TRP CONSTRUCTION GROUP, LLC 1.71% $89,878.49
BARRICADES UNLIMITED 1.52% $79,891.99
A BROTHERS MILLING, LLC 0.44% $23,126.63
SURFACE PREPARATION TECHNOLOGIES, LLC 0.31% $16,293.76
Total: 33.49% $1,760,251.81

Bid Items & Bid Tabulations

48 Total 0 of 48
HOWARD  |  FM 2599  |  ABILENE  |  2597-01-008  |  04/05/2023  |  $4,655,120.95  |  STP 2023(595)HES  |  INSTL/REPLACE SIGNS  |  121 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RK HALL, LLC
CK NEWBERRY, LLC
EXCAVATION (ROADWAY)
CY 11,277.000 $10.000 $20.470 $26.000
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 3,552.000 $14.000 $8.230 $30.000
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 5,964.000 $72.000 $94.780 $135.000
PRIME COAT (MC-30)
GAL 7,156.000 $6.000 $7.810 $7.000
EMULS ASPH (EROSN CONT)(MS-2)
GAL 2,379.000 $6.000 $5.880 $5.500
PLANE ASPH CONC PAV(0" TO 1")
SY 5,362.000 $6.000 $13.570 $6.000
TRENCH EXCAVATION PROTECTION
LF 79.000 $20.000 $8.250 $10.000
TEMPORARY SPL SHORING
SF 120.000 $30.000 $22.000 $25.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 14.000 $600.000 $193.990 $300.000
CONC BOX CULV (4 FT X 3 FT)
LF 200.000 $500.000 $479.120 $600.000
RC PIPE (CL III)(18 IN)
LF 100.000 $90.000 $90.110 $100.000
RC PIPE (CL III)(24 IN)
LF 442.000 $100.000 $110.240 $125.000
RC PIPE (CL III)(36 IN)
LF 12.000 $150.000 $208.020 $225.000
SET (TY I)(S= 4 FT)(HW= 4 FT)(4:1) (C)
EA 5.000 $6,500.000 $16,221.960 $18,000.000
SET (TY I)(S= 4 FT)(HW= 4 FT)(6:1) (C)
EA 5.000 $9,000.000 $20,423.720 $22,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 4.000 $1,600.000 $1,867.140 $2,000.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 8.000 $1,900.000 $2,259.380 $2,500.000
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 10.000 $3,200.000 $2,386.860 $2,600.000
SET (TY II) (36 IN) (RCP) (3: 1) (C)
EA 4.000 $3,800.000 $5,525.980 $6,000.000
REMOV STR (PIPE)
EA 7.000 $1,500.000 $437.270 $1,500.000
MOBILIZATION
LS 1.000 $413,070.000 $620,585.200 $550,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $10,000.000 $22,604.020 $25,000.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 760.000 $7.000 $12.750 $12.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 760.000 $2.000 $3.730 $4.000
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 7.000 $8,000.000 $7,700.000 $8,000.000
RUMBLE STRIPS (SHOULDER)
LF 55,241.000 $0.400 $0.130 $0.500
RUMBLE STRIPS (CENTERLINE)
LF 28,658.000 $0.400 $0.130 $0.500
ALUMINUM SIGNS (TY A)
SF 162.000 $50.000 $55.000 $60.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 87.000 $950.000 $605.000 $1,100.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 7.000 $1,000.000 $660.000 $1,200.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 2.000 $1,200.000 $715.000 $1,300.000
REMOVE SM RD SN SUP&AM
EA 107.000 $165.000 $177.010 $200.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 19.000 $85.000 $77.000 $60.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 2,900.000 $1.500 $4.760 $1.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 55,241.000 $0.650 $0.550 $0.600
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 5,004.000 $0.650 $0.550 $0.600
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 17,234.000 $0.650 $0.550 $0.600
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 136.000 $20.000 $22.000 $25.000
REFL PAV MRKR TY II-A-A
EA 217.000 $5.000 $5.500 $6.000
ELIM EXT PAV MRK & MRKS (4")
LF 71,300.000 $0.350 $0.740 $1.000
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
EA 16.000 $7,500.000 $13,750.000 $12,000.000
SP MIXES SP-C SAC-B PG70-22
TON 14,393.000 $170.000 $154.000 $155.000
TACK COAT
GAL 9,872.000 $6.000 $6.630 $5.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $15,000.000 $21,743.970 $10,000.000
TMA (STATIONARY)
DAY 125.000 $250.000 $416.810 $300.000
TMA (MOBILE OPERATION)
DAY 14.000 $650.000 $884.340 $100.000
LEAD LED CHEVRON
EA 25.000 $4,000.000 $4,290.000 $5,000.000
LED CHEVRON
EA 34.000 $2,050.000 $2,750.000 $3,000.000
Totals: $4,655,120.950 $5,256,051.970 $5,642,324.400