PREPARING ROW
|
AC
|
0.200
|
$20,000.000
|
$15,000.000
|
|
|
PREPARING ROW (TREE) (6" TO 24" DIA)
|
EA
|
17.000
|
$1,500.000
|
$750.000
|
|
|
PREPARING ROW(TREE)(24" TO 36" DIA.)
|
EA
|
1.000
|
$2,057.500
|
$2,500.000
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
23.000
|
$27.000
|
$20.000
|
|
|
REMOVING CONC (MISC)
|
SY
|
90.000
|
$26.500
|
$25.000
|
|
|
REMOVING STAB BASE & ASPH PAV (0-6")
|
SY
|
1,370.000
|
$7.000
|
$15.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
612.000
|
$10.000
|
$30.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
139.000
|
$10.000
|
$30.000
|
|
|
BACKFILL (TY A)
|
STA
|
47.000
|
$210.000
|
$325.000
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
2,387.000
|
$0.500
|
$1.000
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
2,387.000
|
$0.500
|
$1.000
|
|
|
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
|
SY
|
4,773.000
|
$0.700
|
$1.500
|
|
|
VEGETATIVE WATERING
|
MG
|
191.400
|
$15.000
|
$40.000
|
|
|
FL BS (RDWY DEL) (TY A GR 1-2)
|
TON
|
34.000
|
$85.000
|
$75.000
|
|
|
FL BS (CIP)(TY A GR 1-2 OR 5) FINAL POS
|
CY
|
224.000
|
$200.000
|
$225.000
|
|
|
FL BS (CMP IN PLC)(TY A GR 1-2 OR 5)
|
TON
|
594.000
|
$25.000
|
$100.000
|
|
|
CEMENT
|
TON
|
160.000
|
$235.000
|
$275.000
|
|
|
CEMENT TREAT (MX EXST MTL & NW BS)(9")
|
SY
|
1,889.000
|
$5.750
|
$5.000
|
|
|
CEMENT TREAT (EXIST MATL) (DC) (9")
|
SY
|
9,880.000
|
$4.000
|
$5.000
|
|
|
ASPH (RC-250)
|
TON
|
12.300
|
$1,500.000
|
$1,700.000
|
|
|
AGGR (TY E OR L GR 5)
|
CY
|
82.000
|
$235.000
|
$400.000
|
|
|
AGGR(TY PE,TY-PL,TY-E,TY-L GR-4)(SAC-B)
|
CY
|
144.000
|
$90.000
|
$250.000
|
|
|
ASPH (AC-15P OR CRS-2P)
|
TON
|
34.500
|
$1,100.000
|
$1,100.000
|
|
|
CL A CONC (MISC)
|
CY
|
94.000
|
$700.000
|
$1,500.000
|
|
|
CL A CONC (MISC)
|
SY
|
97.000
|
$75.000
|
$200.000
|
|
|
CL C CONC (COLLAR)
|
EA
|
1.000
|
$1,650.000
|
$1,000.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(6 IN)
|
CY
|
7.000
|
$190.000
|
$200.000
|
|
|
RAIL (HANDRAIL)(TY C)
|
LF
|
13.000
|
$186.000
|
$300.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
6.000
|
$150.000
|
$100.000
|
|
|
SET (TY II) (18 IN) (RCP) (3: 1) (P)
|
EA
|
1.000
|
$1,250.000
|
$750.000
|
|
|
REMOV STR (RET WALL)
|
EA
|
10.000
|
$15.000
|
$1,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$75,000.000
|
$150,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
12.000
|
$3,000.000
|
$3,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
60.000
|
$44.000
|
$75.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
60.000
|
$13.500
|
$25.000
|
|
|
CONSTRUCTION PERIMETER FENCE
|
LF
|
50.000
|
$5.000
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
635.000
|
$3.250
|
$6.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
635.000
|
$0.850
|
$1.500
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
2,287.000
|
$5.000
|
$6.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
2,287.000
|
$2.000
|
$1.500
|
|
|
CONC CURB (TY II)
|
LF
|
194.000
|
$15.000
|
$65.000
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
91.000
|
$5.000
|
$25.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
1,274.000
|
$90.000
|
$200.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
2.000
|
$1,000.000
|
$1,000.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
6.000
|
$500.000
|
$725.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
8.000
|
$115.000
|
$150.000
|
|
REFL PAV MRK TY II (W) 4" (SLD)
|
LF
|
473.000
|
$0.400
|
$5.750
|
|
REFL PAV MRK TY II (Y) 12" (SLD)
|
LF
|
64.000
|
$1.500
|
$9.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
473.000
|
$0.400
|
$3.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
4.000
|
$53.500
|
$225.000
|
|
|
PAVEMENT SEALER (SYMBOL)
|
EA
|
2.000
|
$90.000
|
$225.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
1,729.000
|
$0.500
|
$3.000
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
|
LF
|
320.000
|
$0.500
|
$5.500
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
57.000
|
$35.000
|
$17.500
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
8.000
|
$300.000
|
$300.000
|
|
PREFAB PAV MRK TY C (W) (SYMBOL)
|
EA
|
5.000
|
$500.000
|
$325.000
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
15.000
|
$7.000
|
$5.750
|
|
|
SP MIXES SP-C SAC-B PG70-22
|
TON
|
1,294.000
|
$115.000
|
$305.000
|
|
|
BONDING COURSE
|
GAL
|
589.000
|
$6.000
|
$8.000
|
|
|
WHEEL STOPS
|
EA
|
9.000
|
$1,500.000
|
$300.000
|
|
|
REMOV AND RESET PRECAST CONC WHEEL STOP
|
EA
|
32.000
|
$50.000
|
$150.000
|
|
Totals: |
$823,651.750
|
$1,536,462.000
|