Show Job Controls
Bid Cobra

HOUSTON CR (0911-28-051)

Items: 38

County: HOUSTON
Length: N/A
Highway: CR
District: LUFKIN
Control Number: 0911-28-051
DBE Goal: N/A
Project: BR 2B20(127)
Guaranty: N/A
Time: 111 WORKING DAYS
Engineer's Estimate: $1,087,092.50
Date: 07/02/2021 (4 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (5)
E
Engineer's Estimate
$1,087,092.50
$1,191,638.80
Over/Under Est: 9.62% $104,546.30
$1,195,546.28
Over/Under Est: 9.98% $108,453.78
Amt Left: 0.33% $3,907.48
Over/Under Est: 13.49% $146,664.30
Amt Left: 3.53% $42,118.00
Delta: -3.20% -$38,210.52
Over/Under Est: 16.25% $176,692.45
Amt Left: 6.05% $72,146.15
Delta: -2.43% -$30,028.15
Over/Under Est: 18.55% $201,689.42
Amt Left: 8.15% $97,143.12
Delta: -1.98% -$24,996.97

Bid Items & Bid Tabulations

38 Total 0 of 38
HOUSTON  |  CR  |  LUFKIN  |  0911-28-051  |  07/02/2021  |  $1,087,092.50  |  BR 2B20(127)  |  BRIDGE REPL  |  111 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
A. L. HELMCAMP, INC.
TREVWAY, INC.
HODGES AND SON CONSTRUCTION COMPANY, INC.
EAST TEXAS BRIDGE, INC.
SCOTT TUCKER CONSTRUCTION COMPANY, LLC
PREPARING ROW
STA 9.800 $1,800.000 $2,400.000 $500.000 $5,200.000 $4,000.000 $6,220.770
EXCAVATION (ROADWAY)
CY 1,135.000 $8.000 $25.000 $6.550 $20.000 $20.000 $23.320
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 557.000 $15.000 $15.000 $22.660 $25.000 $30.000 $29.870
FURNISHING AND PLACING TOPSOIL (4")
SY 3,266.000 $2.500 $4.000 $2.860 $4.000 $3.000 $7.560
BLOCK SODDING
SY 450.000 $5.000 $7.000 $18.800 $8.000 $7.000 $8.660
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
SY 3,266.000 $0.750 $1.100 $2.530 $1.000 $1.100 $1.250
CELL FBR MLCH SEED(TEMP)(WARM)
SY 1,633.000 $0.500 $1.100 $2.530 $1.000 $1.100 $1.550
CELL FBR MLCH SEED(TEMP)(COOL)
SY 1,633.000 $0.500 $1.100 $2.530 $1.000 $1.100 $1.550
VEGETATIVE WATERING
MG 139.800 $15.000 $25.000 $83.860 $1.000 $20.000 $82.420
SOIL RETENTION BLANKETS (CL 1) (TY B)
SY 1,079.000 $1.500 $2.000 $1.000 $4.000 $2.000 $3.050
FL BS (CMP IN PLC)(TY D GR 1-2) (6")
SY 2,026.000 $25.000 $30.000 $47.000 $15.000 $25.000 $22.430
CEM STABIL BKFL
CY 142.900 $225.000 $350.000 $100.000 $220.000 $275.000 $346.390
DRILL SHAFT (24 IN)
LF 480.000 $240.000 $150.000 $253.360 $190.000 $240.000 $240.240
DRILL SHAFT (30 IN)
LF 210.000 $300.000 $220.000 $328.470 $210.000 $275.000 $307.620
CL C CONC (ABUT)
CY 72.200 $1,125.000 $1,500.000 $620.950 $1,200.000 $1,300.000 $1,096.000
REINF CONC SLAB (BOX BEAM)
SF 1,962.000 $20.000 $24.000 $18.000 $24.000 $24.000 $23.560
REINF CONC SLAB (SLAB BEAM)
SF 2,730.000 $20.000 $31.000 $18.000 $25.000 $24.000 $24.430
SHEAR KEY
CY 20.000 $365.000 $450.000 $200.000 $800.000 $700.000 $486.530
PRESTR CONC BOX BEAM (4B28)
LF 298.000 $220.000 $250.000 $249.190 $270.000 $235.000 $227.100
PRESTR CONC BOX BEAM (5B28)
LF 149.000 $240.000 $310.000 $270.000 $270.000 $235.000 $271.790
PRESTR CONC SLAB BEAM (5SB15)
LF 520.000 $210.000 $250.000 $228.000 $265.000 $235.000 $227.170
RIPRAP (STONE PROTECTION)(18 IN)
CY 905.000 $135.000 $115.000 $195.000 $190.000 $145.000 $160.490
RAIL (TY T631LS)
LF 448.000 $65.000 $65.000 $50.000 $65.000 $70.000 $88.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 3.000 $18,000.000 $13,000.000 $25,000.000 $15,000.000 $12,000.000 $12,045.280
MOBILIZATION
LS 1.000 $100,000.000 $87,000.000 $110,000.000 $115,000.000 $120,000.000 $128,902.610
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $1,600.000 $5,000.000 $900.000 $2,000.000 $5,500.000 $654.120
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 90.000 $35.000 $40.000 $12.630 $5.000 $40.000 $37.780
ROCK FILTER DAMS (REMOVE)
LF 90.000 $10.000 $15.000 $28.050 $5.000 $10.000 $20.780
CONSTRUCTION PERIMETER FENCE
LF 743.000 $6.000 $4.000 $2.000 $4.000 $4.500 $4.310
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,161.000 $3.000 $3.600 $3.000 $1.000 $3.750 $3.100
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,161.000 $1.000 $1.000 $1.000 $1.000 $1.000 $1.200
MTL W-BEAM GD FEN (TIM POST)
LF 202.000 $25.000 $40.000 $49.650 $40.000 $40.000 $47.110
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 6.000 $1,350.000 $1,300.000 $1,502.630 $1,500.000 $1,400.000 $1,698.540
GUARDRAIL END TREATMENT (INSTALL)
EA 6.000 $2,500.000 $2,800.000 $3,032.320 $3,000.000 $3,000.000 $3,023.540
WIRE FENCE (TY C)
LF 732.000 $15.000 $13.000 $17.000 $20.000 $27.000 $20.260
REMOVE SM RD SN SUP&AM
EA 6.000 $100.000 $400.000 $65.130 $500.000 $100.000 $19.730
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 18.000 $30.000 $20.000 $5.050 $30.000 $30.000 $26.000
INSTL OM ASSM (OM-3L)(TWT)GND
EA 6.000 $200.000 $270.000 $31.580 $400.000 $400.000 $325.000
Totals: $1,087,092.500 $1,191,638.800 $1,195,546.288 $1,233,756.800 $1,263,784.950 $1,288,781.933